§ 25-12 — Inspection, approval and authority of Macon-Bibb County engineer

Code of Ordinances of Macon-Bibb County, Georgia (Supp. No. 21: codified through Ordinance No. O-26-0033, enacted July 21, 2026) · Macon-Bibb County Code § 25-12

Corpus is an independent public-information project, not the official City of Macon-Bibb County website. Stable reference: corpuslaw.us/code/37f576a8-c438-4286-9ae1-3ffa88a707b9

Sec. 25-12. - Inspection, approval and authority of Macon-Bibb County engineer.

(a) The Macon-Bibb County engineer shall, subject to the approval of the commission, appoint inspectors to inspect all materials and all work performed. The inspector will not be authorized to revoke, alter, enlarge or relax the provisions of the referenced construction specifications, nor will he be authorized to approve or accept any portion of the completed work or to issue instructions contrary to the plans and specifications. The inspector will have authority to reject defective material and to suspend work that is being improperly done, subject to final decision of the engineer. The inspector shall have free access to all parts of the work. The work will be inspected as it progresses but failure to reject or condemn defective work at the time it is done will in no way prevent its rejection whenever it is discovered before the work is finally accepted and approved, nor will final acceptance and approval constitute waiver by Macon-Bibb County of any right of action for defective work or failure to perform construction according to approved engineering construction plans and specifications. (b) The engineer shall have the duty, right and authority to inspect and approve or disapprove all road and street construction along with other such related work that is constructed in Macon-Bibb County. The engineer shall stop, by written order, any work or any part of the work under any contract that provides for the construction of roads and related items of construction which are constructed in Macon-Bibb County, if he shall find that methods of construction or conditions are such that noncompliance with this chapter may result. The work shall be resumed when defective methods and/or materials are corrected as approved in writing by the engineer. For inspection purposes, the engineer will be informed by the developer as to what phases of construction are being accomplished. The engineer shall cause to be made such inspections at such intervals as are necessary to determine whether there is compliance with the provisions of this chapter.

(Ord. No. O-19-0065, § 1(Exh. B), 10-1-2019)

Ask a question about Macon-Bibb County law

Corpus searches the Macon-Bibb County sections it holds and shows the ones that match, with their citations. Free, no sign-in.