§ 25-88 — Design and construction
Code of Ordinances of Macon-Bibb County, Georgia (Supp. No. 21: codified through Ordinance No. O-26-0033, enacted July 21, 2026) · Macon-Bibb County Code § 25-88
Corpus is an independent public-information project, not the official City of Macon-Bibb County website. Stable reference: corpuslaw.us/code/8f690a4a-4e92-43d2-9e6b-f15a3375abd0
Sec. 25-88. - Design and construction.
[Design and construction requirements as follows:] (1) Permit Required. It is unlawful for any person to lay, construct, or build any sidewalk, driveway apron, or curb and gutter within Macon-Bibb County without securing a construction permit from the Macon-Bibb County Engineering Department. Such permits are in addition to grading or excavation permits required by Macon-Bibb County. (2) Design Required. Upon application for a construction permit, the applicant shall submit a plan or sketch of the proposed construction which must be approved by the Macon-Bibb County Engineer prior to the issuance of a construction permit for sidewalk, driveway apron, or curb and gutter. (3) Timing of Sidewalk Installation. Sidewalks shall be installed up front by the developer before any building permits are issued. The individual lot builder shall be required to remove a section of the sidewalk to install the driveway entrance once they have determined where the driveway will be placed. (4) Duty to Repair and Replace. Upon detection of any defective sidewalk within one (1) year from the date of construction, The Macon-Bibb County Engineer shall cause a notice to be served upon the bonded contractor or bonded property owner directing that repairs and/or replacement shall be accomplished within a designated period of time. Failure to comply with the terms of this notice shall cause forfeiture of bond. If it is determined that other parties are responsible for damage to the sidewalk, such as an individual home builder, the Department of Business Development shall cause the repair to be made by the appropriate contractor and withhold the certificate of occupancy until the repair is made. (5) Use Standards. a. All sidewalk design plans submitted must show provision for the mobility, safety, and comfort of the pedestrian. b. All sidewalk design plans submitted must show provision for adequate pedestrian access to abutting properties and shall show how the connection to the abutting sidewalk will be accomplished. c. All new sidewalks shall meet or exceed standards for handicapped access set by the Americans with Disabilities Act and any other applicable federal, state or local standards. (6) Design and Construction Standards and Procedures. a. Design and Construction Standards. The design and construction of all new sidewalks shall comply with the latest standard specifications of the Georgia Department of Transportation, and reference shall be made to the latest edition of "A Policy on Geometric Design of Highways and Streets," and "The Guide for Planning, Design and Operation of Pedestrian Facilities," both published by the American Association of State Highway and Transportation Officials (AASHTO). b. Landscape Strip. A minimum two-foot landscape strip shall be provided between the back of the curb and gutter and front of the sidewalk. In areas of heavy pedestrian use this landscape strip may be constructed of concrete, decorative pavers, or any other material approved by the Macon-Bibb County Engineer. In no case shall a sidewalk be constructed against the back of the curb without a landscape strip unless first approved by the Macon-Bibb County Engineer. If no curb and gutter is installed, a two-foot landscape strip shall be provided between the edge of the street/road and the sidewalk. c. Sidewalk Location. On all streets, a minimum five (5) [foot] wide sidewalk shall be provided on both sides of the road to promote a balanced and multimodal transportation system that serves the mobility needs of all segments of the population and complies with latest edition of The Americans with Disabilities Act of 1990 (ADA). d. Site Preparation and Inspection. The Macon-Bibb County Engineer shall be given one (1) working day's notice before any material is placed in order that an inspection may be made of the sub-grade, the forms, and the spacing for expansion-contraction joints. The excavating and grading shall be smoothly and neatly done, and to the proper depth, all large stones, boulders, roots, other vegetation, and rubbish of every description being removed from the sub-grade and the entire work made to conform to the profile and grade of the walk when finished. Soft, spongy, or loamy areas in the sub-grade must be removed, and the space refilled with stable material thoroughly compacted
(Ord. No. O-19-0003, § 1(Exh. A), 2-5-2019)
Ask a question about Macon-Bibb County law
Corpus searches the Macon-Bibb County sections it holds and shows the ones that match, with their citations. Free, no sign-in.