Section 31.06. - Stormwater management.

Stormwater management plans shall be required for any project involving single-family attached units, unit developments, churches, multifamily developments, commercial developments, industrial developments and planned developments. [1] Application procedure: (a) Stormwater management plans shall be submitted to the city or county engineer for approval. These plans shall comply with the requirements set forth in Section 31.11[2] below. (b) The city or county engineer and/or the zoning enforcement officer may require that the plans be certified by a state registered civil engineer to ensure compliance with all regulations. [2] Standards for stormwater management: (a) A combination of storage and controlled release of stormwater runoff shall be required when the proposed development shall increase the peak rate of runoff by more than one (1) percent for a ten-year frequency storm; (b) Should the peak rate of stormwater runoff from the site exceed the permitted peak release rate, then on-site retention or detention shall be required. All retention or detention facilities shall be designed for all intensities up to and including twenty-five-year frequency for all duration of rainfall. The peak runoff rate from the site after the development shall not be greater than the permitted peak release rate; and (c) The live retention or detention storage to be provided shall be calculated on the basis of the twenty-five-year frequency rainfall, as published by the National Weather Service for the affected site. The retention or detention volume required shall be that necessary to handle the runoff of the twenty-five-year rainfall for any and all durations from the proposed development, less than that volume discharged during the same duration at the approved release rate as specified above. [3] Permit. A stormwater management plan approved by the city or county engineer shall constitute a permit that will satisfy the requirements of this section. [4] Termination date. Notwithstanding any provision contained in this Section 31.06 to the contrary, this section shall become null and void upon adoption of a storm water management ordinance by Macon-Bibb County.

(Added June 25, 1990, ZA90-06-02; Amended June 25, 1990, ZA90-06-02)