§ 6-16-150 — Requirements of problem discharger, industry discharging more than fifty thousand gallons per day
Municipal Code of the City of Marietta, Georgia (Codified through Ordinance No. 8523, enacted June 10, 2026. (Supp. No. 56)) · Marietta Municipal Code § 6-16-150
Corpus is an independent public-information project, not the official City of Marietta website. Stable reference: corpuslaw.us/code/bfae12b5-2b72-4413-9758-ca88dfb6039f
6-16-150 - Requirements of problem discharger, industry discharging more than fifty thousand gallons per day.
Any industry discharging to the BLW sewer system more than fifty thousand (50,000) gallons per day, or any discharger so designated as a potential problem discharger by the manager, shall comply with the following: A. In order to provide for accurate sampling and measurement of industrial wastes, each designated discharger shall provide and maintain on each of its industrial waste outlet sewers, a large manhole or sampling chamber to be located outside or near its plant boundary line where feasible. If inside the plant fence, there shall be a gate near the sampling chamber with a key furnished to the BLW, or its agent. B. Each sampling chamber shall contain a parshall flume, accurate weir, or similar device, with a recording and totalizing register for measurement of the liquid quantity; or the metered water supply to the industrial plant may be used as the liquid quantity where it is substantiated that the metered water supply and waste quantities are approximately the same, or where a measurable adjustment can be made in the metered supply to determine the liquid quantity. The measuring, totalizing, recording devices are to be supplied, installed and maintained by the owner. C. Samples shall be taken every hour, properly refrigerated and composited in proportion to the flow for a representative twenty-four-hour sample. Such sampling shall be repeated on as many days as necessary to insure representative quantities for the entire reporting period. Industrial plants with wide fluctuations in quantities of wastes, will require an automatic sampler paced automatically by the flow-measuring device. Minimum requirements for representative quantities shall include reevaluation during each quarterly period. The determination of representative quantities shall include not less than three consecutive days of twenty-four-hour composite samplings taken during periods of normal operation, together with acceptable flow measurements. The frequency of sampling, sampling chamber, metering device, sampling methods, and analysis of samples shall be subject, at any time, to inspection and verification by the BLW. Sampling and measuring facilities shall be such as to provide safe access for authorized personnel of the BLW and city for making such inspection and verification. Plans for sampling chambers, with their location shown on a site plan, shall be submitted to the BLW. D. The owner of such facility discharging industrial wastes shall submit monthly to the BLW, on forms supplied by the BLW, a certified statement of the quantities of its wastes discharged into the sewers and sewage works of the BLW or into any sewer connected therewith. Copies of pertinent water bills shall be submitted with the above statement. Such documents shall be filed with the BLW not later than the tenth day of the following month. A separate statement shall be filed for each industrial plant. The total quantities of wastes to be measured and certified by the owner shall be: 1. Liquids in gallons; 2. Five-day BOD in pounds; 3. Suspended solids in pounds, on a dry solids basis; 4. Total phosphorus in pounds; 5. Total Kjeldahl nitrogen in pounds; and 6. COD in pounds.
(Ord. No. 4283, 2/12/86; Code 1978, § 6-5015; Ord. No. 5575, 6/12/96)
Ask a question about Marietta law
Corpus searches the Marietta sections it holds and shows the ones that match, with their citations. Free, no sign-in.
