§ 7-10-050 — Land development requirements

Municipal Code of the City of Marietta, Georgia (Codified through Ordinance No. 8523, enacted June 10, 2026. (Supp. No. 56)) · Marietta Municipal Code § 7-10-050

Corpus is an independent public-information project, not the official City of Marietta website. Stable reference: corpuslaw.us/code/d2e19b58-5d1c-40c0-a997-384c45c1ad90

7-10-050 - Land development requirements.

A. Buffer and Setback Requirements. All land development activity subject to this chapter shall meet the following requirements: 1. An undisturbed native noninvasive vegetative buffer shall be maintained for 50 feet, measured horizontally, on both banks (as applicable) of the stream as measured from the point where vegetation has been wrested by normal stream flow or wave action from the banks of the stream. In the event of removal of a buffer area same shall be immediately replaced with native noninvasive vegetation. 2. An additional setback shall be maintained for 25 feet, measured horizontally, beyond the undisturbed native noninvasive vegetative buffer, in which all impervious cover shall be prohibited. Grading, filling and earthmoving shall be minimized within the setback. 3. No septic tanks or septic tank drain fields shall be permitted within the buffer or the setback. B. Variance Procedures. Variances from the above buffer and setback requirements may be granted in accordance with the following provisions: 1. Where a parcel was platted prior to October 11, 2006 and its shape, topography or other existing physical condition prevents land development consistent with this chapter, and the public works director, or his designee, finds and determines that the requirements of this chapter prohibit the otherwise lawful use of the property by the owner, the city council of the City of Marietta may grant a variance from the buffer and setback requirements hereunder, provided such variance requires mitigation measures to offset the effects of any proposed land development on the parcel. 2. Where proposed encroachments into the buffer and/or impervious setback total less than or equal to 1,500 square feet, the public works director, or his designee, may grant a variance from the buffer and setback requirements hereunder, provided such variance requires mitigation measures to offset the effects of any proposed land development on the parcel. 3. Except as provided above, the city council of the City of Marietta shall grant no variance from any provision of this chapter without first conducting a public hearing on the application for variance and authorizing the granting of the variance by an affirmative vote of the city council of the City of Marietta. The City of Marietta shall give public notice of each such public hearing in a newspaper of general circulation within City of Marietta. The City of Marietta shall require that the applicant post a sign giving notice of the proposed variance and the public hearing. The sign shall be of a size and posted in such a location on the property as to be clearly visible from the primary adjacent road right-of-way. 4. Variances will be considered only in the following cases: a. When a property's shape, topography or other physical conditions existing at the time of the adoption of this chapter prevents land development unless a buffer variance is granted; b. Unusual circumstances when strict adherence to the minimal buffer requirements in this chapter would create an extreme hardship. Variances will not be considered when, following adoption of this chapter, actions of any property owner of a given property have created conditions of a hardship on that property. 5. At a minimum, a variance request shall include the following information: a. A site map that includes locations of all streams, wetlands, floodplain boundaries and other natural features, as determined by field survey; b. A description of the shape, size, topography, slope, soils, vegetation and other physical characteristics of the property; c. A detailed site plan that shows the locations of all existing and proposed structures and other impervious cover, the limits of all existing and proposed land disturbance, both inside and outside the buffer and setback. The exact area of the buffer to be affected shall be accurately and clearly indicated; d. Documentation of unusual hardship should the buffer be maintained; e. At least one alternative plan, which does not include a buffer or setback intrusion, or an explanation of why such a site plan is not possible; f. A calculation of the total area and length of the proposed intrusion; g. A stormwater management site plan, if applicable; and h. Proposed mitigation, if any, for the intrusion. If no mitigation is proposed, the request must include an explanation of why none is being proposed. 6. The following factors will be considered in determining whether to issue a variance: a. The shape, size, topography, slope, soils, vegetation and other physical characteristics of the property; b. The locations of all streams on the property, including along property boundaries; c. The location and extent of the proposed buffer or setback intrusion; and d. Whether alternative designs are possible which require less intrusion or no intrusion; e. The long-term and construction water-quality impacts of the proposed variance; f. Whether issuance of the variance is at least as protective of natural resources and the environment.

(Ord. No. 6971, 10/11/2006, § 5; Ord. No. 8202, 12/9/2020, § 1)

Ask a question about Marietta law

Corpus searches the Marietta sections it holds and shows the ones that match, with their citations. Free, no sign-in.