For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 706.03 — Continuance of a nonconforming building or structure

Municipal Code of the City of Marietta, Georgia (Codified through Ordinance No. 8523, enacted June 10, 2026. (Supp. No. 56)) · Marietta Municipal Code § 706.03

Corpus is an independent public-information project, not the official City of Marietta website. Stable reference: corpuslaw.us/code/94dd8cad-190e-4b17-8724-1324b5916f1c

706.03 - Continuance of a nonconforming building or structure.

Any nonconforming building or structure existing as of June 9, 2010, may be retained, except that it shall not be: A. Expanded, extended, or enlarged in any manner which increase its non-conformity. B. Rebuilt, altered or repaired over a 12-month period if such construction costs would exceed 50 percent of the replacement costs of the building, as calculated according to the square foot construction costs table produced by the International Code Council, or the total appraised building value as shown on the current tax record, or an appraisal made by a licensed appraiser, whichever is the greater value of the 3 options. If an appraisal is used, the appraisal must be provided for review prior to issuance of the building permit. This section shall apply when work is being done to the entire site and/or the building footprint or existing square footage increases. Any increase of the building square footage must be for a use that is conforming, and all other zoning and development standards must be met for the new addition. C. Rebuilt, altered or repaired over a 12-month period if such construction costs would exceed 75 percent of the replacement costs of the building, as calculated according to the square foot construction costs table produced by the International Code Council, or the total appraised building value as shown on the current tax record, or an appraisal made by a licensed appraiser, whichever is the greater value of the 3 options. If an appraisal is used, the appraisal must be provided for review prior to issuance of the building permit. This section shall apply in cases where there is no sitework, and neither the footprint nor square footage of the existing building expand. D. Except that, in the event that a nonconforming building or structure is destroyed wholly or in part by accidental or unintentional fire, flood or natural disaster, then said building or structure may be repaired or rebuilt, or a new building or structure may be built, on the same building footprint as the original structure. In these cases, all permitting must be obtained within 24 months of documented damage to the structure(s). E. Sections 706.03 B. and C. do not apply to signs. See Section 714.06 C., Non-Conforming Signs, of the City of Marietta Zoning Ordinance.

(Ord. No. 6187, 11/8/2000, § 1; Ord. No. 7470, 6/9/2010, § 1; Ord. No. 8157; 5-13-2020, § 1)

Ask a question about Marietta law

Corpus searches the Marietta sections it holds and shows the ones that match, with their citations. Free, no sign-in.