§ 16-100 — Increase in floor load

Code of the City of Rome, Georgia (Part III) (Codified through Ordinance No. 26-01-02, adopted January 26, 2026. (Supp. No. 28)) · Rome Municipal Code § 16-100

Corpus is an independent public-information project, not the official City of Rome website. Stable reference: corpuslaw.us/code/4f912e03-ae14-4a0b-9b17-a5abe662c949

Sec. 16-100. - Increase in floor load.

Any proposed change in the use or occupancy of an existing building or portion thereof which could increase the floor loading shall be investigated by a Georgia registered structural engineer when deemed necessary by the building inspector to determine the adequacy of the existing floor system to support the increased loads. If the existing floor system is found to be inadequate, it shall be modified to support the increased loads, or the proposed allowable floor loading shall be reduced by and posted by the appropriate enforcement authority.

(Ord. No. 83-4-5, § 1, 4-19-83; Code 1981, § 8-9015)