§ 4.1.6 — Construction contractors. Storage of materials not within a building or structure shall be screened by a permanent fence, wall, or approved planted buffer. Such screen shall be at least six feet in height or two feet higher than stored materials, whichever is higher. Such screen shall also be in conformance with buffer standards in Article 6—"Site Design Standards."
Code of the City of Rome, Georgia (Part III) (Codified through Ordinance No. 26-01-02, adopted January 26, 2026. (Supp. No. 28)) · Rome Municipal Code, App. B, art. 4, § 4.1.6
Corpus is an independent public-information project, not the official City of Rome website. Stable reference: corpuslaw.us/code/c5bc8eab-42c7-4327-b860-6699ab499b6c
4.1.6. - Construction contractors. Storage of materials not within a building or structure shall be screened by a permanent fence, wall, or approved planted buffer. Such screen shall be at least six feet in height or two feet higher than stored materials, whichever is higher. Such screen shall also be in conformance with buffer standards in Article 6—"Site Design Standards."
Construction contractors. Storage of materials not within a building or structure shall be screened by a permanent fence, wall, or approved planted buffer. Such screen shall be at least six feet in height or two feet higher than stored materials, whichever is higher. Such screen shall also be in conformance with buffer standards in Article 6—"Site Design Standards."
Ask a question about Rome law
Corpus searches the Rome sections it holds and shows the ones that match, with their citations. Free, no sign-in.
