§ 10.2.11 — Design and Installation
Code of Ordinances of the City of Roswell, Georgia (Codified through Ordinance No. 2025-11-10, adopted November 10, 2025. (Supp. No. 17)) · Roswell Unified Development Code § 10.2.11
Corpus is an independent public-information project, not the official City of Roswell website. Stable reference: corpuslaw.us/code/f8fbebc4-b616-464c-831c-a4074d820597
10.2.11. - Design and Installation
A. Replacement Bond. 1. Prior to issuance of a Certificate of Occupancy, a performance bond or cash escrow must be paid guaranteeing all landscaping and screening materials and work for a period of 2 years after issuance of the Certificate of Occupancy. 2. The bond must be in the amount of 100% of the estimated cost of replacing all of the landscaping required by this UDC. 3. At the end of 2 years, the City Arborist must make an inspection and notify the owner and the bond company of any corrections to be made. B. Visibility at Intersections. No landscaping or screening may interfere with a clear sight triangle as established in Sec. 11.4.6. C. Plant Material. 1. Plant materials must be hardy to zone 7b in accordance with the U.S. Department of Agriculture's Plant Hardiness Zone Map. 2. Plant materials must be able to survive on natural rainfall once established with no loss of health. 3. Tree height is measured from the top of the root ball to the tip of the main stem. 4. No artificial plants, trees, or other vegetation may be installed as required landscaping and screening.
Ask a question about Roswell law
Corpus searches the Roswell sections it holds and shows the ones that match, with their citations. Free, no sign-in.
