§ 11.3.6 — Subdivision Access
Code of Ordinances of the City of Roswell, Georgia (Codified through Ordinance No. 2025-11-10, adopted November 10, 2025. (Supp. No. 17)) · Roswell Unified Development Code § 11.3.6
Corpus is an independent public-information project, not the official City of Roswell website. Stable reference: corpuslaw.us/code/6027b0dd-503e-473f-84b6-04a00c918ae0
11.3.6. - Subdivision Access
A. General. 1. When land is subdivided, parcels must be arranged and designed so as to allow for the opening of future streets and must provide access to those areas not presently served by streets. No subdivision may be designed to completely eliminate street access to adjoining parcels of land without current street access. 2. All subdivisions must provide at least one entrance/exit to a public or private street, as determined by the Transportation Director. 3. The subdivision must provide all necessary easements for ingress and egress for police, fire, emergency vehicles and all operating utilities. B. Stub Streets. 1. Stub Required. a. Where a development adjoins unsubdivided land, stub streets within the new subdivision must be installed to the meet the block standards of Sec. 11.3.2. b. The stub street right-of-way, pavement and curbing must extent to the boundary of the abutting property to the point where the connection to the anticipated street is expected. c. Where a stub street is provided, a barricade using a design approved by the Transportation Director must be constructed at the end of the stub street, pending the extension of the street into abutting property. A sign noting the future street extension must be posted at the applicant's expense. 2. Connecting to an Existing Stub Street. If a stub street exists on an abutting property, the street system of any new subdivision must connect to the stub street to form a through street. 3. Exception. The Transportation Director may eliminate the requirement for a stub street or require pedestrian only access when: a. Steep slopes in excess of 25%, freeways, waterways, tree conservation areas, stream buffers, cemeteries, open space or easements would make the provision of a stub street infeasible; or b. A high intensity nonresidential use is located adjacent to a proposed residential subdivision. C. Mobility. 1. When land is proposed for development or redevelopment requiring a land disturbance permit such proposal shall identify at a minimum 2 access connections to the current City of Roswell Transportation network. 2. The first access connection shall be as required under this Unified Development Code and/or subdivision development code for vehicular access to a public road. 3. In addition the development shall provide a second access connection based upon mobility standards. 4. The mobility standard requirement is measured by the number of trips generated by the development according the International Transportation Engineering (ITE) standards for land use. Single-family residential, townhome and multifamily units are all equated with Office and Commercial Space based upon ADT generated and mobility requirement shall be provided as follows: a. First Mobility Priority: The development trip generation exceeds 750 ADT: There shall be a second access connection provided to be constructed as a public road with vehicle, bike and pedestrian elements with access connection to a road that is not the same as the first public right-of-way. b. Second Mobility Priority: The development trip generation is between 360 to 750 ADT: The developer shall endeavor to meet first priority but if not a second access connection shall be required to connect with vehicle, bike and pedestrian elements to the same road as the first access but located as far from the first as is possible. c. Third Mobility Priority: The development trip generation is between 225 to 360 ADT: The developer shall endeavor to meet first priority or second priority but if not shall provide a second access connection built to support a fire truck with full time pedestrian and bike access and may have either a vehicle gate or removable bollard as long as the fire department is provided an accessible lock. d. Fourth Mobility Priority: The development trip generation is less than 225 ADT: The developer shall endeavor to meet first, second, or third priority but if not shall provide a second access connection built to support a fire truck that connects to a multi-use path for bike and pedestrian access.
Ask a question about Roswell law
Corpus searches the Roswell sections it holds and shows the ones that match, with their citations. Free, no sign-in.
