§ 11.5.3 — Design of Utilities and Other Improvements

Code of Ordinances of the City of Roswell, Georgia (Codified through Ordinance No. 2025-11-10, adopted November 10, 2025. (Supp. No. 17)) · Roswell Unified Development Code § 11.5.3

Corpus is an independent public-information project, not the official City of Roswell website. Stable reference: corpuslaw.us/code/73457535-674a-445b-8310-7775c44c7707

11.5.3. - Design of Utilities and Other Improvements

A. All utility systems, including water, sewerage, gas and electric, along with component parts, structures, appendages and materials, must be designed to City of Roswell, Fulton County or other applicable standards and be approved by the Public Works Director and Engineering Director. B. All utility systems must be installed underground. Above-ground utility systems will not be permitted, except where certain appurtenances and accessories must be installed above-ground for servicing. C. All subdivisions shall meet the stormwater requirements of the City of Roswell. When serving more than three lots, detention ponds, (including all required access easements, landscape strips and fences) must be located on an individual lot of record where no home can be constructed. This parcel must be owned and maintained by the homeowners association or the lots of record being served by this facility. The parcel must have a minimum 20-foot wide continuous access to a public or private road in a manner that allows access and maintenance of this parcel. This lot will not be required to meet the normal lot standards for that zoning district. Water Quality treatment facilities (such as bioretention ponds) need not be located on an individual lot of record, however a drainage easement shall be applied to the water quality facility and the facility shall be maintained by the homeowners association or the lots of record being served by this facility. D. For all development or redevelopment that requires detention ponds, retention ponds or water quality features, such features must be located outside any required buffer. E. Underground detention ponds are allowed under public roadways when approved by the Transportation Director with input from the Public Works Director.

Ask a question about Roswell law

Corpus searches the Roswell sections it holds and shows the ones that match, with their citations. Free, no sign-in.