For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 13.13.4 — Nonconforming Build-to Requirement

Code of Ordinances of the City of Roswell, Georgia (Codified through Ordinance No. 2025-11-10, adopted November 10, 2025. (Supp. No. 17)) · Roswell Unified Development Code § 13.13.4

Corpus is an independent public-information project, not the official City of Roswell website. Stable reference: corpuslaw.us/code/86e3fff5-06c2-4029-b258-5f8a13ac88a3

13.13.4. - Nonconforming Build-to Requirement

A. Additions. When an existing building is being expanded and the building doesn't meet the build-to requirement, the following provisions apply. [image omitted; see the official code] Front: Addition. Any addition to the front must be placed in the build-to zone. The addition does not have to meet the build-to percentage for the lot. [image omitted; see the official code] Rear: Addition. Rear additions are allowed because the addition does not increase the degree of the nonconformity. [image omitted; see the official code] Side: Addition. Side additions are not allowed because the extension increases the width of the building not located in the build-to zone. B. New Buildings. Where a new building is being constructed on a lot or site with an existing building on it that doesn't meet the build-to requirement, the following provisions apply. [image omitted; see the official code] Front: New Building. All new buildings must be placed in the build-to zone until the build-to percentage for the lot has been met. [image omitted; see the official code] Rear: New Building. New buildings located outside of the build-to zone are not allowed until the build-to percentage for the lot has been met. [image omitted; see the official code] Side: New Building. New buildings located outside of the build-to zone are not allowed until the build-to percentage for the lot has been met. C. Replacement Buildings. New buildings located outside of the build-to zone are allowed to replace an existing building. Where the replacement building has the same or a similar footprint, it must be approved by the Design Review Board. Where the replacement building footprint is increased, it must be approved by the Mayor and City Council. [image omitted; see the official code]

Ask a question about Roswell law

Corpus searches the Roswell sections it holds and shows the ones that match, with their citations. Free, no sign-in.