13.8.7. - How is a Land Disturbance Permit Reviewed?
A. Once the Engineering Director has determined the application is complete and in substantial accordance with previously approved site plans, the Engineering Director will review the application. In substantial accordance shall not include the following: 1. Increased number of lots; or increase in units per acre; 2. Increased building or lot square footage; 3. Additions to existing buildings that alter the footprint of the building; 4. Addition of extra stories to buildings; 5. Relocation of streets or access driveways; 6. Reconfiguration of parking facilities; 7. Reconfiguration of the proposed lot and/or road alignment; 8. Addition of a retaining wall equal to or greater than 6 feet in height; 9. Modification to a previously approved retaining wall that increases the height to 6 feet or greater; 10. Modification to a previously approved stormwater retention/detention pond type 11. Decreased square footage of approved landscape open space, outdoor amenity space, and/or common open space; 12. Conflict with the conditions of zoning and/or approval by the Board of Zoning Appeals or Historic Preservation Commission or Design Review Board; and 13. Any change determined by the Zoning Director to not be in substantial accordance. B. If the application and site plan are not in substantial accordance with the previously approved site plan then it is subject to review and approval by the Mayor and City Council. C. Following review of the Land Disturbance Permit, the Engineering Director will approve or deny the application. A decision will be made within 14 calendar days of receiving a complete application. This time period may be extended if both the applicant and the Engineering Director agree on an extension. D. If the Engineering Director finds that the Land Development Permit does not meet all the applicable requirements of the UDC, the Engineering Director will notify the applicant of the specific provisions that have not been met and offer the applicant the opportunity to make changes to the Land Development Permit. E. Approval or denial of a Land Development Permit is based on whether or not the submittal meets or fails to meet the applicable requirements of this UDC.
(Ord. No. 2018-09-14, § 1, 9-10-2018)
Ask a question about Roswell law
Corpus searches the Roswell sections it holds and shows the ones that match, with their citations. Free, no sign-in.