§ 19.2.4 — Access
Code of Ordinances of the City of Roswell, Georgia (Codified through Ordinance No. 2025-11-10, adopted November 10, 2025. (Supp. No. 17)) · Roswell Code of Ordinances § 19.2.4
Corpus is an independent public-information project, not the official City of Roswell website. Stable reference: corpuslaw.us/code/d4078a04-b231-46c4-b64a-e1f3aa0ab159
Section 19.2.4 - Access.
Access to every subdivision shall be provided over a public or private street in accordance with the following: 1. The proposed street shall meet the City of Roswell standards and regulations as provided in the standard construction specifications, as amended from time to time and a copy of which shall be made available by the city engineer. 2. In residential subdivisions, the private roads and stormwater management facilities associated therewith shall be maintained by a mandatory homeowners association, unless said facilities are dedicated to and accepted by the City of Roswell, and documents of incorporation shall be submitted to the community development department prior to the recording of the final plat. 3. The subdivider shall provide all necessary easements for ingress and egress for police, fire, emergency vehicles and all operating utilities. 4. The final plat of any subdivision that contains private streets shall clearly state that such streets are private streets. When land is subdivided, created parcels shall be arranged and designed so as to allow for the opening of future streets and provide access to those areas not presently served by streets. No subdivision shall be designed so as to completely eliminate street access to adjoining parcels of land without current street access.
(2003-12-30, Amended, 12/08/2003)
Ask a question about Roswell law
Corpus searches the Roswell sections it holds and shows the ones that match, with their citations. Free, no sign-in.
