For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 2.2.9 — Build-to Zone

Code of Ordinances of the City of Roswell, Georgia (Codified through Ordinance No. 2025-11-10, adopted November 10, 2025. (Supp. No. 17)) · Roswell Unified Development Code § 2.2.9

Corpus is an independent public-information project, not the official City of Roswell website. Stable reference: corpuslaw.us/code/43bad24e-0959-4f40-a859-6ed7a9c93905

2.2.9. - Build-to Zone

A. Defined. 1. The build-to zone is the area on the lot where a certain percentage of the front building facade must be located, measured as a minimum and maximum setback range from the edge of the right-of-way. 2. The required percentage specifies the amount of the front building facade that must be located in the build-to zone, measured based on the width of the building divided by the width of the lot. [image omitted; see the official code] B. Corner Lots. On a corner lot, a building facade must be placed within the build-to zone for the first 30 feet along the street extending from the block corner, measured from the intersection of the two right-of-way lines. [image omitted; see the official code] C. Uses Allowed. With the exception of parking spaces, all structures and uses allowed on the lot are allowed in the build-to zone. Vehicle drive-thru lanes or facilities are not permitted in the build-to zone.

Ask a question about Roswell law

Corpus searches the Roswell sections it holds and shows the ones that match, with their citations. Free, no sign-in.