§ 4.3.11 — General Building
Code of Ordinances of the City of Roswell, Georgia (Codified through Ordinance No. 2025-11-10, adopted November 10, 2025. (Supp. No. 17)) · Roswell Unified Development Code § 4.3.11
Corpus is an independent public-information project, not the official City of Roswell website. Stable reference: corpuslaw.us/code/cdf961dd-8443-4595-8ccf-a79a208349f9
4.3.11. - General Building
1. Lot [image omitted; see the official code] Lot Dimensions Ⓐ Lot area (min) | 5,000 sf Ⓑ Lot width (min) | 50' Lot Parameters Ⓒ Landscape open space (min) | 35% Ⓓ Outdoor amenity space (min) | 5% 2. Placement [image omitted; see the official code] Building Setbacks (1) Ⓐ Primary street (min) | 5' Ⓑ Side street (min) | 5' Ⓒ Side interior (min) | 0' or 3' Ⓓ Rear (min) | 0' or 3' Ⓓ Rear, alley (min) | 5' Build-to Zone (BTZ) (1) Ⓔ Primary/side street (min/max) CX-, PV- | 5'/20' NX-, CC- | 5'/85' CH- | n/a Ⓕ Building in primary street BTZ (min % of lot width) | 75% CC- reduction | 60% Ⓖ Building in side street BTZ (min % of lot width) | 35% (1) Additional setbacks apply in a PV- district when abutting Highway 92 (see Sec. 4.3.13). 3. Scale [image omitted; see the official code] Building Height Ⓐ Building height (max) | Set by district on Official Zoning Map Story Height Ⓑ Ground story height, floor to ceiling (min) | 11' Ⓒ Upper story height, floor to ceiling (min) | 9' Building Mass Ⓓ NX- tenant footprint (max) | 15,000 sf 4. Activation [image omitted; see the official code] Transparency Ⓐ Ground story, primary/side street (min) | 40%/20% Ⓑ Upper story, primary/side street (min) | 20% Ⓒ Blank wall area, primary/side street (max) | 40'/50' Pedestrian Access Ⓓ Entrance facing primary street | Required CH- exemption | n/a Ⓔ Entrance spacing along primary street (max) | 125' CH- exemption | n/a Permitted Building Elements Ⓕ Balcony, gallery, awning/canopy, forecourt | Allowed Ⓖ On-Site Parking CX-: No on-site parking between building and street NX- CC-: Max 2 bays of on-site parking with single drive aisle between building and street PV-: When abutting Highway 92, max 2 bays of on-site parking with single drive aisle between the building and required streetscape PV-: When abutting any other street, no on-site parking between building and street CH-: No on-site parking restriction
(Ord. No. 2023-03-04, § 12, 3-27-2023)
Ask a question about Roswell law
Corpus searches the Roswell sections it holds and shows the ones that match, with their citations. Free, no sign-in.
