Sec. 105-46. - Permits.
(a) Permit application. (1) Changed occupancy. When required, any owner, authorized agent, or con-tractor who desires to construct, enlarge, alter, repair, move, demolish, or change the occupancy of a building or structure, or to erect, install, enlarge, alter, repair, remove, convert, or replace any electrical, gas, mechanical, or plumbing system, the installation of which is regulated by the construction codes, or to cause any such work to be done, shall first make application to the building official and obtain the required permit for the work. (2) Work authorized. A building, electrical, gas, mechanical, or plumbing permit shall carry with it the right to construct or install the work, provided the same are shown on the drawings and set forth in the specifications filed with the application for the permit. Where these are not shown on the drawings and covered by the specifications submitted with the application, separate permits are required. (3) Minor repairs. Ordinary minor repairs may be made with the approval of the building official without a permit, provided that such repairs shall not violate any of the provisions of the construction codes. (4) Information required. Each application for a permit, with the required fee, is filed with the building official on a form furnished for that purpose, and shall contain a general description of the proposed work and its location. The application is signed by the owner, or his authorized agent. The building permit application shall indicate the proposed occupancy of all parts of the building and of that portion of the site or lot, if any, not covered by the building or structure, and shall contain such other information as may be required by the building official. (5) Time limitations. An application for a permit for any proposed work is deemed to have been abandoned six months after the date of filing for the permit, unless before then a permit has been issued. One or more extensions of time for periods of not more than 90 days each may be allowed by the building official for the application, provided the extension is requested in writing and justifiable cause is demonstrated. (b) Drawings and specifications. (1) Requirements. When required by the building official, two or more copies of specifications and of drawings drawn to scale with sufficient clarity and detail to indicate the nature and character of the work shall accompany the application for a permit. Such drawings and specifications shall contain information, in the form of notes or otherwise, as to the quality of materials, where quality is essential to conformity with the construction codes. Such information is specific, and the construction codes shall not be cited as a whole or in part, nor shall the term "legal," or its equivalent, be used as a substitute for specific information. All information, drawings, specifications and accompanying data shall bear the name and signature of the person responsible for the design. The height is the vertical distance from grade plane to the average height of the highest roof surface. Grade plane. A reference plane representing the weighted mean of the finished ground level adjoining the building at all exterior walls. Where the finished ground level slopes away from the exterior walls, the reference plane shall be established by the lowest points within the area between the building and the lot line or, where the lot line is more than six feet (1,829 mm) from the building between the structure and a point six feet (1,829 mm) from the building. On extreme lots, the top of a retaining sub-wall shall be used in the determination of average grade. The retaining sub-wall shall not exceed 15 feet in height. (2) Additional data. The building official may require details, computations, stress diagrams, and other data necessary to describe the construction or installation and the basis of calculations. All drawings, specifications, and accompanying data required by the building official to be prepared by an architect or engineer is affixed with their official seal. (3) Design professional. The design professional is an architect or engineer legally registered under the laws of this state regulating the practice of architecture or engineering and shall affix his official seal to said drawings, specifications, and accompanying data, for the following: a. All group A, E, and I occupancies. b. Buildings and structures three stories or more high. c. Buildings and structures 5,000 square feet (465 m 2 ) or more in area. For all other buildings and structures, the submittal shall bear the certification of the applicant that some specific state law exception permits its preparation by a person not so registered. (4) Exception. Single-family dwellings, regardless of size, shall require neither a registered architect nor engineer, nor a certification that an architect or engineer is not required. (5) Structural and fire resistance integrity. Plans for all buildings shall indicate how required structural and fire resistance integrity will be maintained where a penetration of a required fire resistance wall, floor, or partition will be made for electrical, gas, mechanical, plumbing, signal and communication conduits, pipes, and systems and also indicate in sufficient detail how the fire integrity will be maintained where required fire resistance floors intersect the exterior walls. (6) Site drawings. Drawings shall show the location of the proposed building or structure and of every existing building or structure on the site or lot. The building official may require a boundary line survey prepared by a qualified surveyor. These drawings shall contain a statement of the proposed height of any existing or proposed structure. (7) Hazardous occupancies. The building official may require the following: a. General site plan. A general site plan drawn at a legible scale which shall include, but not be limited to, the location of all buildings, exterior storage facilities, permanent accessways, evacuation routes, parking lots, internal roads, chemical loading areas, equipment cleaning areas, storm and sanitary sewer accesses, emergency equipment, and adjacent property uses. The exterior storage areas are identified with the hazard classes and the maximum quantities per hazard class of hazardous materials stored. b. Building floor plan. A building floor plan drawn to a legible scale, which shall include, but not be limited to, all hazardous materials storage facilities within the building and shall indicate rooms, doorways, corridors, exits, fire-rated assemblies with their hourly rating, location of liquid tight rooms, and evacuation routes. Each hazardous materials storage facility is identified on the plan with the hazard classes and quantity range per hazard class or the hazardous materials stored. (c) Examination of documents. (1) Plan review. The building official shall examine or cause to be examined each application for a permit and the accompanying documents, consisting of drawings, specifications, computations, and additional data, and shall ascertain by such examinations whether the construction indicated and described is in accordance with the requirements of the construction codes and all other pertinent laws or ordinances. (2) Affidavits. The building official may accept a sworn affidavit from a registered architect or engineer stating that the plans submitted conform to the construction codes. For buildings and structures, the affidavit shall state that the plans conform to the laws as to egress, type of construction, and general arrangement and if accompanied by drawings showing the structural design, and by a statement that the plans and design conform to the requirements of the construction codes as to strength, stresses, strains, loads, and stability. The building official may without any examination or inspection accept such affidavit, provided the architect or engineer who made such affidavit agrees to submit to the building official, copies of inspection reports as inspections are performed and upon completion of the structure, electrical, gas, mechanical, or plumbing systems a certification that the structure, electrical, gas, mechanical, or plumbing system has been erected in accordance with the requirements of the construction codes. Where the building official relies upon such affidavit, the architect or engineer shall assume full responsibility for the compliance with all provisions of the construction codes and other pertinent laws or ordinances. (d) Issuing permits. (1) Action on permits. The building official shall act upon an application for a permit without unreasonable or unnecessary delay. If the building official is satisfied that the work described in an application for a permit and the contract documents filed therewith conform to the requirements of the construction codes and other pertinent laws and ordinances, he shall issue a permit to the applicant. (2) Refusal to issue a permit. If the application for a permit and the accompanying contract documents describing the work do not conform to the requirements of the construction codes or other pertinent laws or ordinances, the building official shall not issue a permit, but shall return the contract documents to the applicant with his refusal to issue such permit. Such refusal shall, when requested, be in writing and shall contain the reason for refusal. (3) Special foundation permit. When application for permit to erect or enlarge a building has been filed and pending issuance of such permit, the building official may, at his discretion, issue a special permit for the foundation only. The holder of such a special permit is proceeding at his own risk and without assurance that a permit for the remainder of the work will be granted nor that corrections will not be required in order to meet provisions of the construction codes. (4) Public right-of-way. A permit shall not be given by the building official for the construction of any building, or for the alteration of any building where said building is to be changed and such change will affect the exterior walls, bays, balconies, or other appendages or projections fronting on any street, alley, or public lane, or for the placing on any lot or premises of any building or structure removed from another lot or premises, unless the applicant has made application at the office of the director of public works for the lines of the public street on which he proposes to build, erect, or locate said building; and it is the duty of the building official to see that the street lines are not encroached upon. (e) Contractor responsibilities. It is the duty of every contractor who shall make contracts for the installation or repairs of buildings, structures, electrical, gas, mechanical, sprinkler, or plumbing systems, for which a permit is required, to comply with state or local rules and regulations concerning licensing which the applicable governing authority may have adopted. In such case that the state requires a contractor to have obtained a state license before he is permitted to perform work, the contractor shall supply the local government with its license number before receiving a permit for work to be performed. An affidavit containing the contractor's license number and a statement of responsibility shall be required prior to the issuance of a certificate of occupancy. (f) Conditions of the permit. (1) Permit intent. A permit issued is construed to be a license to proceed with the work and not as authority to violate, cancel, alter, or set aside any of the provisions of the construction codes, nor shall issuance of a permit prevent the building official from thereafter requiring a correction of errors in plans, construction, or violations of the construction codes. Every permit issued shall become invalid unless the work authorized by such permit is commenced within six months after its issuance, or if the work authorized by such permit is suspended or abandoned for a period of six months after the time the worked is commenced. One or more extensions of time, for periods not more than 90 days each, may be allowed for the permit. The extension is requested in writing and justifiable cause demonstrated. Extensions are in writing by the building official. (2) Permit issued on basis of an affidavit. Whenever a permit is issued in reliance upon an affidavit or whenever the work to be covered by a permit involves installation under conditions which, in the opinion of the building official, are hazardous or complex, the building official shall require that the architect or engineer who signed the affidavit or prepared the drawings or computations shall supervise such work. In addition, they are responsible for conformity with the permit, provide copies of inspection reports as inspections are performed, and upon completion make and file with the building official written affidavit that the work has been done in conformity with the reviewed plans and with the structural provisions of the construction codes. In the event such architect or engineer is not available, the owner shall employ in his place, a competent person or agency whose qualifications are reviewed by the building official. (3) Plans. When the building official issues a permit, he shall enforce, in writing or by stamp, both sets of plans "reviewed for code compliance." One set of drawings so reviewed is retained by the building official and the other set is returned to the applicant. The permitted drawings are kept at the site of work and is open to inspection by the building official or his authorized representative. (g) Fees. (1) Prescribed fees. A permit shall not be issued until the fees prescribed by the building official have been paid. Nor shall an amendment to a permit be released until the additional fee, if any, due to an increase in the estimated cost of the building, structure, electrical, plumbing, mechanical, or gas systems, has been paid. (2) Work commencing before permit issuance. Any person who commences any work on a building, structure, electrical, gas, mechanical, or plumbing, system before obtaining the necessary permits are subject to a penalty of 100 percent of the usual permit fee in addition to the required permit fees. (3) Accounting. The building official shall keep a permanent and accurate accounting of all permit fees and other money collected, the names of all persons upon whose account the same was paid, along with the date and amount thereof. (4) Schedule of permit fees. On all buildings, structures, electrical, plumbing, mechanical, and gas systems or alterations requiring a permit, a fee for each permit is paid as required at the time of filing application, in accordance with the fee schedules as set by the building official. (5) Building permit valuations. If, in the opinion of the building official, the valuation of building, alteration, structure, electrical, gas, mechanical, or plumbing systems appears to be underestimated on the application, the permit is denied, unless the applicant can show detailed estimates to meet the approval of the building official. Permit valuations shall include total cost, such as electrical, gas, mechanical, plumbing equipment, and other systems, including materials and labor. (h) Inspections. (1) Existing buildings. Before issuing a permit, the building official may examine or cause to be examined any building, electrical, gas, mechanical, or plumbing systems for which an application has been received for a permit to enlarge, alter, repair, move, demolish, install, or change the occupancy. He shall inspect all buildings, structures, electrical, gas, mechanical, and plumbing systems, from time to time, during and upon completion of the work for which a permit was issued. He shall make a record of every such examination and inspection and of all violations of the construction codes. (2) Manufacturers and fabricators. When deemed necessary by the building official, he shall make, or cause to be made, an inspection of materials or assemblies at the point of manufacture or fabrication. A record is made of every such examination and inspection and of all violations of the construction codes. (3) Inspection service. The building official may make, or cause to be made, the inspections required by subsection (h)(6) of this section. He may accept reports of inspectors of recognized inspection services provided that after investigation he is satisfied as to their qualifications and reliability. A certificate called for by any provision of the construction codes shall not be based on such reports unless the same are in writing and certified by a responsible officer of such service. (4) Inspections prior to issuance of certificate of occupancy or completion. The building official shall inspect or cause to be inspected at various intervals all construction or work for which a permit is required, and a final inspection is made of every building, structure, electrical, gas, mechanical, or plumbing system upon completion, prior to the issuance of the certificate of occupancy or completion. (5) Posting of permit and work hours. a. Work requiring a permit shall not commence until the permit holder or his/her agent posts the permit card in a conspicuous place on the premises. The permit shall be protected from the weather and located at a prominent location within five feet of a right-of-way at approximately five feet above grade, parallel to and facing the street within the right-of-way and prominently visible from the right-of-way. The permit shall be located such that the building official or the building official's representative shall be able to conveniently and safely access the permit and make the required entries thereon. This permit card shall be maintained in such position by the permit holder until the certificate of occupancy or completion is issued by the building official. b. Work requiring a permit shall not commence until the permit holder or his/her agent posts notice of the allowable work hours that are stipulated within the city noise ordinance (section 38-81 et seq.). The allowable work hours notice shall be prominently posted at all primary points of construction access to the site, at the permit posting location in a position readily visible without opening any enclosure and within any enclosure containing permit materials, and at all primary points of construction access to the interior of any building within which construction activity occurs. The allowable work hours notices shall be located prominently at eye level. The allowable work hour notices shall be maintained in such positions by the permit holder until the certificate of occupancy or completion is issued by the building official. (6) Required inspections. The building official, upon notification from the permit holder or his agent, shall make the following inspections and such other inspections as necessary, and shall either release that portion of the construction or shall notify the permit holder or his agent of any violations which must be corrected in order to comply with the technical code: a. Building. 1. Footing inspection. The footing inspection is to be made after trenches are excavated and reinforcement rods are in place. 2. Foundation inspection. The foundation inspection is to be made after the forms have been erected and the reinforcing steel is in place. 3. Underslab inspection. The underslab inspection is to be made after trenches are excavated and all electrical conduit and plumbing pipe have been installed. 4. Slab inspection. The slab inspection is to be made after the steel, wire and vapor barrier are in place. 5. Rough inspection. The rough framing inspection is to be made after the roof, all framing, fire blocking, and bracing are in place, all concealed wiring, all pipes, chimneys, ducts, and vents are complete. 6. Final inspection. The final building inspection is to be made after the building is complete and ready for occupancy. b. Electrical. 1. Underground inspection. The underground inspection is to be made after trenches or ditches have been excavated, conduit or cable installed, and before any backfill is in place. 2. Underslab inspection. The underslab inspection is to be made after trenches or ditches have been excavated, conduit or cable installed, and before any backfill is in place. 3. Wall cover inspection. The wall cover inspection is to be made after all wires, boxes, guards, conduit have been installed and before the installation of any wall membrane. 4. Ceiling cover inspection. The ceiling cover inspection is to be made after all wires, boxes, guards, conduit have been installed and before the installation of any ceiling membrane. 5. Temporary power pole inspection. The temporary power pole (T-pole) inspection is to be made after the pole has been erected and the meter and all subsequent wiring has been installed and before connection to the provider. 6. Temporary power inspection. The temporary power inspection is to be made after the meter and all subsequent wiring has been installed up to the service panel, and at least one GFCI circuit has been installed and before connection to the provider. c. Plumbing. 1. Underground inspection. The pluming underground inspection is to be made after trenches or ditches are excavated, piping installed, and before any backfill is put in place. 2. Rough-in inspection. The pluming rough-in inspection is to be made after the roof, framing, fireblocking, and bracing is in place and all soil, waste, and vent piping is complete, and prior to this installation of wall or ceiling membranes. 3. Final inspection. The final pluming inspection is to be made after the building is complete, all plumbing fixtures are in place and properly connected, and the structure is ready for occupancy. 4. Note. See state plumbing code for required tests. d. Mechanical. 1. Underground inspection. The mechanical underground inspection is to be made after trenches or ditches are excavated, underground duct and fuel piping installed, and before any backfill is put in place. 2. Rough-in inspection. The mechanical rough-in inspection is to be made after the roof, framing, fireblocking, and bracing are in place and all ducting, and other concealed components are complete, and prior to the installation of wall or ceiling membranes. 3. Wall cover inspection. The wall cover inspection is to be made after all wires, boxes, guards, conduit have been installed and before the installation of any wall membrane. 4. Ceiling cover inspection. The ceiling cover inspection is to be made after all wires, boxes, guards, conduit have been installed and before the installation of any ceiling membrane. e. Gas. 1. Rough piping inspection. The gas rough-in piping inspection is to be made after all new piping authorized by the permit has been installed, and before any such piping has been covered or concealed or any fixtures or gas appliances have been connected. 2. Final piping inspection. The final gas piping inspection is to be made after all piping authorized by the permit has been installed and after all portions which are to be concealed by plastering or otherwise have been so concealed, and before any fixtures or gas appliances have been connected. This inspection shall include a pressure test. 3. Wall cover inspection. The wall cover inspection is to be made after all wires, boxes, guards, conduit have been installed and before the installation of any wall membrane. 4. Ceiling cover inspection. The ceiling cover inspection is to be made after all wires, boxes, guards, conduit have been installed and before the installation of any ceiling membrane. f. Energy. 1. Foundation inspection. The energy foundation inspection is to be made before slab concrete is poured in place. To verify that perimeter insulation has been installed correctly on any slab on grade foundations, if required. 2. Frame inspection. The energy frame inspection is to be made before exterior wall insulation is concealed by wall board to check installation of exterior walls insulation and to inspect that all holes and cracks through the structure envelope have been sealed in an appropriate manner as to restrict air passage. 3. Final inspection. The final inspection for energy is to be made after the building is completed and ready for occupancy. To verify installation and R-value of ceiling and floor insulation. To verify correct SEER ratings on appliances. (7) Written release. Work shall not be done on any part of a building, structure, electrical, gas, mechanical, or plumbing system beyond the point indicated in each successive inspection without first obtaining a written release from the building official. Such written release is given only after an inspection has been made of each successive step in the construction or installation as indicated by each of the foregoing three inspections. (8) Reinforcing steel, structural frames, insulation, plumbing, mechanical, or electrical systems. Reinforcing steel, structural frame, insulation, plumbing, work of any part of any building or structure shall not be covered or concealed without first obtaining a release from the building official. (9) Plaster fire protection. In all buildings where plaster is used for fire protection purposes, the permit holder or his agent shall notify the building official after all lathing and backing is in place. Plaster shall not be applied until the release from the building official has been received. (i) Certificates. (1) Certificate of occupancy. a. Building occupancy. A new building shall not be occupied or a change made in the occupancy, nature, or use of a building or part of a building until after the building official has issued a certificate of occupancy. Said certificate shall not be issued until all required electrical, gas, mechanical, plumbing, and fire protection systems have been inspected for compliance with the construction codes and other applicable laws and ordinances and released by the building official. b. Issuing certificate of occupancy. Upon satisfactory completion of construction of a building or structure and installation of electrical, gas, mechanical, and plumbing systems in accordance with the construction codes, reviewed plans and specifications, and after the final inspection and acceptance of as-built drawings, the building official shall issue a certificate of occupancy stating the nature of the occupancy permitted, the number of persons for each floor when limited by law, and the allowable load per square foot for each floor in accordance with the provisions of the construction codes. 1. As-built drawings. Site development as-built drawings, containing a boundary survey, location, elevation, height, and square footage of buildings, parking areas, utilities, walls, and stormwater facilities, pertinent site development data, and any other requirements of the community development director shall be submitted to and approved by the department prior to the issuance of a certificate of occupancy c. Temporary/partial occupancy. A temporary/partial certificate of occupancy may be issued for a portion of a building, which may safely be occupied prior to final completion of the building. d. Existing building certificate of occupancy. A certificate of occupancy for any existing building may be obtained by applying to the building official and supplying the information and data necessary to determine compliance with the construction codes for the occupancy intended. Where necessary, in the opinion of the building official, two sets of detailed drawings, or a general inspection, or both, may be required. When, upon examination and inspection, it is found that the building conforms to the provisions of the construction codes and other applicable laws and ordinances for such occupancy, a certificate of occupancy is issued. e. Multiphase/level certificate of completion. Upon satisfactory completion of construction of a multiphase/level structure and installation of electrical, gas, mechanical and plumbing systems in accordance with the construction and life safety codes, and final inspection, the building official shall issue a certificate of completion for the building shell. Each individual unit within, shall be permitted and inspected as a separate unit. f. Multiphase/level certificate of occupancy. Upon issuance of a certificate of completion as set forth in subsection (i)(1)e of this section, the building official shall be authorized to issue certificates of occupancy on a floor-by-floor or structure-by-structure basis upon the approval of the building officer. The building officer shall not issue an approval until there has been a preconstruction meeting. A preconstruction meeting shall address safe egress for the occupants and workers, the completion of common spaces, safety of the occupants during the construction phase or phases, a schedule of the work to be completed, parking separation, site access for workers, and all staging areas. Certificates of occupancy shall be issued upon satisfactory completion of construction of a multiphase/level units and installation of electrical, gas, mechanical and plumbing systems in accordance with the construction and life safety codes, and all inspections have been passed. (2) Certificate of completion. Upon satisfactory completion of a building, structure, electrical, gas, mechanical, or plumbing system, a certificate of completion may be issued. This certificate is proof that a structure or system is complete and for certain types of permits is released for use and may be connected to a utility system. This certificate does not grant authority to occupy or connect a building, such as a shell building, prior to the issuance of a certificate of occupancy. (3) Service utilities. a. Connection. No person shall make connections from a utility, source of energy, fuel, or power to any building or system which is regulated by the construction codes for which a permit is required, until released by the building official and a certificate of occupancy or completion is issued. b. Temporary connection. The building official may authorize the temporary connection of the building or system to the utility source of energy, fuel, or power for the purpose of testing building service systems or for use under a temporary certificate of occupancy. c. Authority to disconnect. The building official shall have the power to authorize disconnection of utility service to the building, structure, or system regulated by the construction codes, in case of emergency where necessary to eliminate an immediate hazard to life or property. The building official shall notify the serving utility, and whenever possible the owner and occupant of the building, structure, or service system of the decision to disconnect prior to taking such action. If not notified prior to disconnecting, the owner or occupant of the building, structure, or service system is notified in writing, as soon as practical thereafter. (j) Posting floor loads. (1) Occupancy. An existing or new building shall not be occupied for any purpose, which will cause the floors thereof to be loaded beyond their safe capacity. The building official may permit occupancy of a building for mercantile, commercial, or industrial purposes, by a specific business, when he is satisfied that such capacity will not thereby be exceeded. (2) Storage and factory-industrial occupancies. It is the responsibility of the owner, agent, proprietor, or occupant of group S and group F occupancies, or any occupancy where excessive floor loading is likely to occur, to employ a competent architect or engineer in computing the safe load capacity. All such computations are accompanied by an affidavit from the architect or engineer stating the safe allowable floor load on each floor in pounds per square foot uniformly distributed. The computations and affidavit is filed as a permanent record of the building department. (3) Signs required. Signs are required in every building or part of a building used for storage, industrial, or hazardous purposes, the safe floor loads, as reviewed by the building official on the plan, are marked on plates or approved design which is supplied and securely affixed by the owner of the building in a conspicuous place in each story to which they relate. Such plates shall not be removed or defaced, and if lost, removed or defaced, are replaced by the owner of the building.
(Ord. No. 2006-09-68, § 1(ch. 9, art. 2, § 7), 9-5-2006; Ord. No. 2007-07-43, § 1, 7-17-2007; Ord. No. 2007-08-48, § 1, 8-21-2007; Ord. No. 2008-08-, 8-19-2008; Ord. No. 2016-08-25, § 1, 8-16-2016)
Ask a question about Sandy Springs law
Corpus searches the Sandy Springs sections it holds and shows the ones that match, with their citations. Free, no sign-in.