For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 7.9.1 — Manufactured Home

Code of Ordinances of the City of Sandy Springs, Georgia (Codified through Ordinance No. 2026-03-006, enacted March 17, 2026 (Supp. No. 24)) · Sandy Springs Development Code § 7.9.1

Corpus is an independent public-information project, not the official City of Sandy Springs website. Stable reference: corpuslaw.us/code/9ed4c2dd-2e4b-4c78-ae44-a18738aa3bad

Sec. 7.9.1. - Manufactured Home

A. While Residence Being Built 1. Basic Use Standards a. The building permit for the principal structure must have been issued and remain valid during the period that the manufactured home is on the property. b. The manufactured home must be located on the same lot as the principal structure being constructed and comply with all zoning district setbacks. c. The permit will expire 12 months after issuance or upon occupancy of the principal structure, whichever occurs first. Only 1 renewal for a 1-year period may be issued. d. The manufactured home must be occupied by the owner of the principal residence under construction.

(Ord. No. 2023-12-23, § I(Att. A), 12-5-2023)

Ask a question about Sandy Springs law

Corpus searches the Sandy Springs sections it holds and shows the ones that match, with their citations. Free, no sign-in.