§ 8.1.1 — Applicability
Code of Ordinances of the City of Sandy Springs, Georgia (Codified through Ordinance No. 2026-03-006, enacted March 17, 2026 (Supp. No. 24)) · Sandy Springs Development Code § 8.1.1
Corpus is an independent public-information project, not the official City of Sandy Springs website. Stable reference: corpuslaw.us/code/827360eb-d742-479e-9e18-dc1eda40f9c5
Sec. 8.1.1. - Applicability
A. Standards apply based on the type of activity proposed, as shown in the table below. For all zoning districts, the development standards apply as shown in the table below: Development Activity | 6.6 (Building) Design Standards | 8.2 Parking | 8.3 Site Landscaping | 8.3 Screening | 8.4 Signage | 9.6.3 Stormwater Management | 9.6.3 Water Quality | 10.3 Driveways and Cross-Access Connections | 10.4 Streetscape Improvements | All Standards | Additional References Parking Area Expansion Minor: <1,000 sf | o | o | o | o | n | o Major: >1,000 sf | n | n | n | n | n | n | n | n Site Modification Remediation Due to Disaster(Fire, Flood, etc.) | n Re-occupation after Extended Vacancy (Greater than 180 days) | n | n | n | o Site Disturbance <1,000 sf of site | o | n | o | o Site Disturbance 1,000 sf—5,000 sf of site | o | o | o | n | n | n | o | o Site Disturbance ≥5,000 sf of site | o | n | n | n | o | n | o Building Renovation or Expansion Renovation Due to Disaster(Fire, Flood, etc.) | o | n Re-occupation after Extended Vacancy (Greater than 180 days) | n | n | n | n | n | n Renovation without Expansion: <50% of FMV of building | o | o | n | n Minor Expansion: <25% of Total Floor Area | o | o | o | n | n | o | n | 6.1.2 Substantial Renovation without Expansion: >50% of FMV of Building | o | o | o | n | n | o Partial Expansion 25%— <> 50% of Total Floor Area | o | n | o | n | n | n | n | n | 6.1.2 Major Expansion:>50% of Total Floor Area | n | n | n | n | n | n | n | n | 6.1.2 Façade Modification | n n | Compliance with all applicable standards required o | Compliance required of only the expanded building or lot area only to the extent practical B. Where a section applies according to the table above, the project activity must meet all of the applicable requirements in that section. Where a section is listed as not applying, no requirements in that section apply. C. The general applicability in this Section may be further modified by the detailed provisions of that Section.
(Ord. No. 2023-12-24, § I(Att. A), 12-5-2023; Ord. No. 2025-09-22, § I, 9-16-2025)
Ask a question about Sandy Springs law
Corpus searches the Sandy Springs sections it holds and shows the ones that match, with their citations. Free, no sign-in.