§ 9.2.3 — Land Development Requirements
Code of Ordinances of the City of Sandy Springs, Georgia (Codified through Ordinance No. 2026-03-006, enacted March 17, 2026 (Supp. No. 24)) · Sandy Springs Development Code § 9.2.3
Corpus is an independent public-information project, not the official City of Sandy Springs website. Stable reference: corpuslaw.us/code/3cdcd94d-6202-4c6f-a8b5-15e2b760b749
Sec. 9.2.3. - Land Development Requirements
A. Buffer and Setback Requirements All land development activity subject to this Division must meet the following requirements: 1. Fifty-Foot Vegetative Buffer An undisturbed natural vegetative buffer is maintained for 50 feet, measured horizontally, on all banks of the State waters as measured from the point of wrested vegetation. 2. Seventy-Five-Foot Impervious Surface Setback All impervious surfaces are prohibited from an additional setback of 25 feet, measured horizontally from the 50-foot vegetative buffer. a. Purpose The purpose of the setback is to prohibit all newly proposed impervious surfaces and to prevent increases in stormwater runoff caused by grading or other land disturbance activities within the impervious surface setback. b. Exceptions Land development activities in the impervious surface setback may be approved by the Director if they maintain or decrease the existing stormwater runoff rates. 3. Septic No septic tanks or septic tank drain fields are permitted within the buffer or the setback. Septic tanks and septic tank drain fields must be coordinated with the Fulton County Health Department and comply with its regulations.
(Ord. No. 2023-12-24, § I(Att. A), 12-5-2023)
Ask a question about Sandy Springs law
Corpus searches the Sandy Springs sections it holds and shows the ones that match, with their citations. Free, no sign-in.