§ 9.7.2 — Exemptions
Code of Ordinances of the City of Sandy Springs, Georgia (Codified through Ordinance No. 2026-03-006, enacted March 17, 2026 (Supp. No. 24)) · Sandy Springs Development Code § 9.7.2
Corpus is an independent public-information project, not the official City of Sandy Springs website. Stable reference: corpuslaw.us/code/4396b4db-b837-4258-8a97-30a82bd5c66e
Sec. 9.7.2. - Exemptions
This Division will apply to any land-disturbing activity undertaken by any person or any land except for the following: A. Surface mining, as the same is defined in O.C.G.A. § 12-4-72, "The Georgia Surface Mining Act of 1968"; B. Granite Quarrying and land for such quarrying; C. Such minor land-disturbance activities as home gardens and individual home landscaping, repairs, maintenance work, fences, and other related activities. If such activities cause excessive erosion an official notice will be provided to implement a best management practice (BMP) to stop continued erosion; D. The construction of single unit residences, when such construction disturbs less than 1 acre and is not a part of a larger common plan or development or sale with a planned disturbance of equal to or greater than 1 acre and not otherwise exempted under this paragraph; provided, however: 1. Construction of any such residence (single unit) must conform to the minimum requirements as set forth in Sec. 9.7.3 C. of this Division. 2. For single unit residential construction covered by the provisions of this paragraph, there must be a buffer zone between the residence and any state waters classified as trout streams pursuant to Article 1 of Chapter 5 of the Georgia Water Quality Control Act. In any such buffer zone, no land-disturbing activity must be constructed between the residence and the point where vegetation has been wrested by normal stream flow or wave action from the banks of the trout waters. For primary trout waters, the buffer zone must be at least 50 horizontal feet, and no variance to a smaller buffer must be granted. For secondary trout waters, the buffer zone must be at least 50 horizontal feet, but the Director may grant variances to no less than 25 feet. Regardless of whether a trout stream is primary or secondary, for first order trout waters, which are streams into which no other streams flow except for springs, the buffer must be at least 25 horizontal feet, and no variance to a smaller buffer will be granted. 3. The minimum requirements of Sec. 9.7.3 C. of this Division and the buffer zones provided by this Section will be enforced by the City; E. Agricultural operations as defined in O.C.G.A. § 1-3-3, "definitions," to include raising, harvesting or storing of products of the field or orchard; feeding, breeding or managing livestock or poultry; producing or storing feed for use in the production of livestock, including, but not limited to, cattle, calves, swine, hogs, goats, sheep, and rabbits or for use in the production of poultry, including, but not limited to, chickens, hens and turkeys; producing plants, trees, fowl, or animals; the production of aquaculture, horticultural, dairy, livestock, poultry, eggs and apiarian products; farm buildings and farm ponds; F. Forestry land management practices, including harvesting; provided, however, that when such exempt forestry practices cause or result in land-disturbing or other activities otherwise prohibited in a buffer, as established in Sec. 9.7.3 C. of this Division, no other land-disturbing activities, except for normal forest management practices, will be allowed on the entire property upon which the forestry practices were conducted for a period of 3 years after completion of such forestry practices; G. Any project carried out under the technical supervision of the Natural Resources Conservation Service (NRCS) of the United States Department of Agriculture; H. Any project involving less than 1 acre of disturbed area; provided, however, that this exemption will not apply to any land-disturbing activity within a larger common plan of development or sale with a planned disturbance of equal to or greater than 1 acre or within 200 feet of the banks/points of wrested vegetation of any state waters, and for purposes of this paragraph, "state waters" excludes channels and drainage ways which have water in them only during and immediately after rainfall events, however, that any person responsible for a project which involves less than 1 acre, which involves land-disturbing activity, and which is within 200 feet of any such excluded channel or drainageway, must prevent sediment from moving beyond the boundaries of the property on which such project is located and provided, further, that nothing contained herein will prevent the local issuing authority from regulating any such project which is not specifically exempted by paragraphs A., B., C., D., E., F., G., I. or J. of this Section; I. Construction or maintenance projects, or both, undertaken or financed in whole or in part, or both, by the Georgia Department of Transportation, the Georgia Highway Authority, or the State Road and Tollway Authority; or any road construction or maintenance project, or both, undertaken by any county or municipality; provided, however, that construction or maintenance projects of the Georgia Department of Transportation or the State Road and Tollway Authority which disturb 1 or more contiguous acres of land will be subject to provisions of O.C.G.A. § 12-7-7.1; except where the Georgia Department of Transportation, the Georgia Highway Authority, or the State Road and Tollway Authority is a secondary permittee for a project located within a larger common plan of development or sale under the State general permit, in which case a copy of a notice of intent under the State general permit must be submitted to the local issuing authority, the local issuing authority will enforce compliance with the minimum requirements set forth in O.C.G.A. § 12-7-6, as if a permit had been issued, and violations will be subject to the same penalties as violations by permit holders; J. Any land-disturbing activities conducted by any electric membership corporation or municipal electrical system or any public utility under the regulatory jurisdiction of the Georgia Public Service Commission, any utility under the regulatory jurisdiction of the Federal Energy Regulatory Commission, any cable television system as defined in O.C.G.A. § 36-18-1, or any agency or instrumentality of the United States engaged in the generation, transmission, or distribution of power; except where an electric membership corporation or municipal electrical system or any public utility under the regulatory jurisdiction of the Georgia Public Service Commission, any utility under the regulatory jurisdiction of the Federal Energy Regulatory Commission, any cable television system as defined in O.C.G.A. § 36-18-1, or any agency or instrumentality of the United States engaged in the generation, transmission, or distribution of power is a secondary permittee for a project located within a larger common plan of development or sale under the State general permit, in which case the local issuing authority will enforce compliance with the minimum requirements set forth in O.C.G.A. § 12-7-6, as if a permit had been issued, and violations will be subject to the same penalties as violations by permit holders; and K. Any public water system reservoir.
(Ord. No. 2023-12-24, § I(Att. A), 12-5-2023)
Ask a question about Sandy Springs law
Corpus searches the Sandy Springs sections it holds and shows the ones that match, with their citations. Free, no sign-in.