§ 4-11033 — Final inspection and as built plans
Code of Ordinances of the City of Savannah, Georgia (Division II) (enCodePlus online edition as published 2026-11-20) · Savannah Code of Ordinances, pt. 4, ch. 11., art. C, § 4-11033
Corpus is an independent public-information project, not the official City of Savannah website. Stable reference: corpuslaw.us/code/d35fdf43-3b2f-4f1b-a10f-c4b8b605b547
Sec. 4-11033. - Final inspection and as built plans.
Subsequent to the final installation and stabilization of all green infrastructure and stormwater management practices shown on the approved stormwater management design plan, and before the issuance of a certificate of occupancy, the applicant is responsible for certifying that the project has been completed in accordance with the approved stormwater management design plan and for submitting the certification of correctness by a Georgia licensed professional engineer. Within 60 days of issuance of the certificate of occupancy, the applicant is responsible for submitting as built plans for all green infrastructure and stormwater management practices shown on the approved stormwater management design plan. The as built plans must show the final design specifications for all green infrastructure and stormwater management practices, the final stormwater system elevations based on the North American Vertical Datum 1988, and the final stormwater system volumes where they were provided as a part of the system design. A final inspection shall be conducted by the staff or representatives of the City of Savannah to confirm the accuracy of the as built plans. A final inspection is required before any performance bond or other guarantee can be released. (Ord. of 11-20-2018(5) , § 1)
Ask a question about Savannah law
Corpus searches the Savannah sections it holds and shows the ones that match, with their citations. Free, no sign-in.