For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 4.7 — Utilities and Utility Screening

Code of Ordinances of the City of Savannah, Georgia (Division II) (enCodePlus online edition as published 2026-11-20) · Savannah Code of Ordinances, pt. 8, ch. 3., App. A-2, art. A-2.32, art. 4.0, § 4.7

Corpus is an independent public-information project, not the official City of Savannah website. Stable reference: corpuslaw.us/code/7edb732f-2256-46e7-aafa-ee65e4cdd921

Sec. 4.7 Utilities and Utility Screening

(1) 4.7.1 Location. The following utilities shall be located underground to the extent possible: potable water supply and distribution systems; wastewater collection, treatment, and disposal; irrigation, cable television, telephone, broadband multi-use transmission; and other utility services. Power distribution systems shall be located underground except for the existing utility corridor and the overhead power lines located on Little Neck Road and Bush Road. Underground utilities can be placed within the buffers and setbacks (as defined in Section 4.4.1) provided they are planned so as to accommodate the minimum 8' paved pedestrian leisure trail as well as other required buffer elements. Temporary overhead power lines shall be allowed during construction. See Figure 4.2 Primary Road Buffer.

Ask a question about Savannah law

Corpus searches the Savannah sections it holds and shows the ones that match, with their citations. Free, no sign-in.