§ 5-2045 — Industrial wastewater discharge reports
Code of Ordinances of the City of Savannah, Georgia (Division II) (enCodePlus online edition as published 2026-11-20) · Savannah Code of Ordinances, pt. 5, ch. 2., art. C, § 5-2045
Corpus is an independent public-information project, not the official City of Savannah website. Stable reference: corpuslaw.us/code/f3ad6da0-21a5-4086-854c-b950012887fc
Sec. 5-2045. - Industrial wastewater discharge reports.
(a) Baseline monitoring reports. (1) Within either 180 days after the effective date of a categorical pretreatment standard, or the final administrative decision on a category determination under 40 CFR 403.6(a)(4), whichever is later, existing categorical industrial users currently discharging to or scheduled to discharge to the POTW shall submit to the administrator a report which contains the information listed in subsection (a)(2) below. At least 90 days prior to commencement of their discharge, new sources, and sources that become categorical industrial users subsequent to the promulgation of an applicable categorical standard, shall submit to the administrator a report which contains the information listed in subsection (a)(2)(A-E), below. A new source shall report the method of pretreatment it intends to use to meet applicable categorical standards. A new source also shall give estimates of its anticipated flow and quantity of pollutants to be discharged. (2) Industrial users described above shall submit the information set forth below: (A) Identifying information. The name and address of the facility, including the name of the operator and owner. (B) Environmental permits. A list of any environmental control permits held by or for the facility. (C) Description of operations. A brief description of the nature, average rate of production, and standard industrial classifications of the operation(s) carried out by such industrial user. This description should include a schematic process diagram which indicates points of discharge to the POTW from the regulated processes. (D) Flow measurement. Information showing the measured average daily and maximum daily flow, in gpd, to the POTW from regulated process streams and other streams, as necessary, to allow use of the combined wastestream formula set out in 40 CFR 403.6(e). (E) Measurement of pollutants. (i) The categorical pretreatment standards applicable to each regulated process. (ii) The results of sampling and analysis identifying the nature and concentration, and/or mass, where required by the standard or by the administrator, of regulated pollutants in the discharge from each regulated process. Instantaneous, daily maximum, and longterm average concentrations, or mass, where required, shall be reported. The sample shall be representative of daily operations and shall be analyzed in accordance with procedures set out in subsection (j) of this section. (iii) Sampling must be performed in accordance with procedures set out in subsection (k) of this section. (F) Certification. A statement, reviewed by the industrial user's authorized representative and certified by a qualified professional, indicating whether pretreatment standards are being met on a consistent basis, and, if not, whether additional operation and maintenance (O&M) and/or additional pretreatment is required to meet the pretreatment standards and requirements. (G) Compliance schedule. If additional pretreatment and/or O&M will be required to meet the pretreatment standards, the shortest schedule by which the industrial user will provide such additional pretreatment and/or O&M. The completion date in this schedule shall not be later than the compliance date established for the applicable pretreatment standard. A compliance schedule pursuant to this section must meet the requirements set out in subsection (b) of this section. (H) Signature and certification. All baseline monitoring reports must be signed and certified in accordance with section 5-2044(a)(6) of this chapter. (b) Compliance schedule progress reports. The following conditions shall apply to the compliance schedule required by subsection (a)(2)(G) of this section: (1) The schedule shall contain progress increments in the form of dates for the commencement and completion of major events leading to the construction and operation of additional pretreatment required for the industrial user to meet the applicable pretreatment standards (such events include, but are not limited to, hiring an engineer, completing preliminary and final plans, executing contracts for major components, commencing and completing construction, and beginning and conducting routine operation); (2) No increment referred to above shall exceed nine months; (3) The industrial user shall submit a progress report to the administrator no later than 14 days following each date in the schedule and the final date of compliance including, as a minimum, whether or not it complied with the increment of progress, the reason for any delay, and, if appropriate, the steps being taken by the industrial user to return to the established schedule; and (4) In no event shall more than nine months elapse between such progress reports to the administrator. (c) Categorical pretreatment standard deadline reports. Within 90 days following the date for final compliance with applicable categorical pretreatment standards, or in the case of a new source following commencement of the introduction of wastewater into the POTW, any industrial user subject to such pretreatment standards and requirements shall submit to the administrator a report containing the information described in subsection (a)(2)(D-F) of this section. For industrial users subject to equivalent mass or concentration limits established in accordance with the procedures in 40 CFR 403.6(c), this report shall contain a reasonable measure of the industrial user's longterm production rate. For all other industrial users subject to categorical pretreatment standards expressed in terms of allowable pollutant discharge per unit of production (or other measure of operation), this report shall include the industrial user's actual production during the appropriate sampling period. All compliance reports must be signed and certified in accordance with section 5-2044(a)(6) of this chapter. (d) Periodic compliance reports. (1) All permitted industrial users shall, at a frequency determined by the administrator, but in no case less than twice per year (in June and December), submit a report indicating the nature and concentration of pollutants in the discharge which are controlled by the industrial user's permit. In addition, this report shall include a record of measured or estimated average and maximum daily flows for the reporting period. All periodic compliance reports must be signed and certified in accordance with section 5-2044(a)(6) of this chapter. (2) All wastewater samples must be representative of the industrial user's discharge. Wastewater monitoring and flow measurement facilities shall be properly operated, kept clean, and maintained in good working order at all times. The failure of an industrial user to keep its monitoring facility in good working order shall not be grounds for the industrial user to claim that sample results are unrepresentative of its discharge. (3) If an industrial user subject to the reporting requirement in this section monitors any pollutant more frequently than required by the administrator, using the procedures prescribed in subsection (k) of this section, the results of this monitoring shall be included in the report. (e) Reports of changed conditions. Each industrial user must notify the administrator of any planned significant changes to the industrial user's operations or system which may alter the nature, quality, or volume of its wastewater at least 90 days before the change. (1) The administrator may require the industrial user to submit such information as may be deemed necessary to evaluate the changed condition, including the submission of a wastewater discharge permit application under section 5-2044(a)(5) of this chapter. (2) The administrator may issue a wastewater discharge permit under section 5-2044(a)(4) of this chapter or modify an existing wastewater discharge permit under section 5-2044(a)(3) of this chapter in response to changed conditions or anticipated changed conditions. (3) For purposes of this requirement, significant changes include, but are not limited to, flow increase or decrease of 20 percent or greater, or the discharge of any previously unreported pollutants. (f) Reports of potential problems. (1) In the case of any discharge, including, but not limited to, accidental discharges, discharges of a nonroutine, episodic nature, a noncustomary batch discharge, or a slug load, that may cause potential problems for the POTW, the industrial user shall immediately telephone and notify the administrator of the incident. This notification shall include the location of the discharge, type of waste, concentration and volume, if known, and corrective actions taken by the industrial user. (2) Within five days following such discharge, the industrial user shall, unless waived by the administrator, submit a detailed written report describing the cause(s) of the discharge and the measures to be taken by the industrial user to prevent similar future occurrences. Such notification shall not relieve the industrial user of any expense, loss, damage, or other liability which may be incurred as a result of damage to the POTW, natural resources, or any other damage to person or property; nor shall such notification relieve the industrial user of any fines, penalties, or other liability which may be imposed pursuant to this chapter. (3) A notice shall be permanently posted on the industrial user's bulletin board or other prominent place advising employees whom to call in the event of a discharge described in subsection (f)(1), above. Employers shall ensure that all employees, who may cause such a discharge to occur, are advised of the emergency notification procedure. (g) Reports from unpermitted industrial users. All industrial users not required to obtain a wastewater discharge permit shall provide appropriate reports to the administrator as the administrator may require. (h) Notice of violation/repeat sampling and reporting. If sampling performed by an industrial user indicates a violation, the industrial user must notify the administrator within 24 hours of becoming aware of the violation. The industrial user shall also repeat the sampling and analysis and submit the results of the repeat analysis to the administrator within 30 days after becoming aware of the violation. The industrial user is not required to resample if the administrator monitors at the industrial user's facility at least once a month, or if the administrator samples between the industrial user's initial sampling and when the industrial user receives the results of this sampling. (i) Notification of the discharge of hazardous waste. (1) Any industrial user who commences the discharge of hazardous waste shall notify the POTW, the EPA regional waste management division director, and state hazardous waste authorities, in writing, of any discharge into the POTW of a substance which, if otherwise disposed of, would be a hazardous waste under 40 CFR 261. Such notification must include the name of the hazardous waste as set forth in 40 CFR 261, the EPA hazardous waste number, and the type of discharge (continuous, batch, or other). If the industrial user discharges more than 100 kilograms of such waste per calendar month to the POTW, the notification also shall contain the following information to the extent such information is known and readily available to the industrial user: an identification of the hazardous constituents contained in the wastes, an estimation of the mass and concentration of such constituents in the wastestream discharged during that calendar month, and an estimation of the mass of constituents in the wastestream expected to be discharged during the following 12 months. All notifications must take place no later than 180 days after the discharge commences. Any notification under this subsection need be submitted only once for each hazardous waste discharged. However, notifications of changed conditions must be submitted under subsection (e) of this section. The notification requirement in this section does not apply to pollutants already reported by industrial users subject to categorical pretreatment standards under the self-monitoring requirements of subsections (a), (c), and (d) of this section. (2) Dischargers are exempt from the requirements of subsection (i)(1), above, during a calendar month in which they discharge no more than 15 kilograms of hazardous wastes, unless the wastes are acute hazardous wastes as specified in 40 CFR 261.30(d) and 261.33(e). Discharge of more than 15 kilograms of nonacute hazardous wastes in a calendar month, or of any quantity of acute hazardous wastes as specified in 40 CFR 261.30(d) and 261.33(e), requires a one-time notification. Subsequent months during which the industrial user discharges more than such quantities of any hazardous waste do not require additional notification. (3) In the case of any new regulations under section 3001 of RCRA identifying any additional characteristics of hazardous wastes or listing any additional substance as a hazardous waste, the industrial user must notify the administrator, the EPA Regional Waste Management Waste Division Director, and state hazardous waste authorities of the discharge of such substance within 90 days of the effective date of such regulations. (4) In the case of any notification made under this section, the industrial user shall certify that it has a program in place to reduce the volume and toxicity of hazardous wastes generated to the degree it has determined to be economically practical. (5) This provision does not create a right to discharge any substance not otherwise permitted to be discharged by this chapter, a permit issued thereunder, or any applicable federal or state law. (j) Analytical requirements. All pollutant analyses, including sampling techniques, to be submitted as part of a wastewater discharge permit application or report shall be performed in accordance with the techniques prescribed in 40 CFR 136, unless otherwise specified in an applicable categorical pretreatment standard. If 40 CFR 136 does not contain sampling or analytical techniques for the pollutant in question, sampling and analyses must be performed in accordance with procedures approved by EPA. (k) Sample collection. (1) Except as indicated in subsection (k)(2), below, the industrial user must collect wastewater samples using flow proportional composite collection techniques. In the event flow proportional sampling is infeasible, the administrator may authorize the use of time proportional sampling or a minimum of four grab samples where the industrial user demonstrates that this will provide a representative sample of the effluent being discharged. In addition, grab samples may be required to show compliance with maximum daily limits. (2) Samples for oil and grease, temperature, pH, cyanide, phenols, sulfides, and volatile organic compounds must be obtained using grab collection techniques. Actual sample type requirements shall be included in the wastewater discharge permit. (l) Timing. Written reports will be deemed to have been submitted on the date postmarked. For reports which are not mailed, postage prepaid, into a mail facility serviced by the United States Postal Service, the date of receipt of the report shall govern. (m) Recordkeeping. Industrial users subject to the reporting requirements of this chapter shall retain, and make available for inspection and copying, all records of information obtained pursuant to any monitoring activities required by this chapter and any additional records of information obtained pursuant to monitoring activities undertaken by the industrial user independent of such requirements. Records shall include the date, exact place, method, and time of sampling, and the name of the person(s) taking the samples; the dates analyses were performed; who performed the analyses; the analytical techniques or methods used; and the results of such analyses. These records shall remain available for a period of at least three years. This period shall be automatically extended for the duration of any litigation concerning the industrial user or the city, or where the industrial user has been specifically notified of a longer retention period by the administrator. (Ord. of 12-8-1998(6), § 2(V); )
(Ord. of 6-6-2019(21), § 1)
Ask a question about Savannah law
Corpus searches the Savannah sections it holds and shows the ones that match, with their citations. Free, no sign-in.
