For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 5-4011 — Abandonment

Code of Ordinances of the City of Savannah, Georgia (Division II) (enCodePlus online edition as published 2026-11-20) · Savannah Code of Ordinances, pt. 5, ch. 4., § 5-4011

Corpus is an independent public-information project, not the official City of Savannah website. Stable reference: corpuslaw.us/code/da4a2aae-0535-460e-bf77-963e34d5d594

Sec. 5-4011. - Abandonment.

(1) A water well shall be considered as temporarily abandoned when its use has been interrupted for a period of more than one year and not more than three years. Such a well shall be sealed and the well maintained whereby it is not a source or a channel of contamination or pollution when not in service. (2) A water well shall be considered as permanently abandoned when its service has been interrupted for a period of more than three years or it meets the definition of abandoned well as defined in this part. Such a well shall be filled, sealed, and plugged. (3) Whenever a well or borehole is excavated for the exploration, testing, or use as a source of water supply but is not longer used for that purpose, it shall be the owner's responsibility to have the borehole filled, sealed, and plugged within 30 days of the excavation or disuse to protect against the entrance of pollutants into the subsurface. (4) No abandoned water well or borehole shall be used for the purpose of disposing of any wastes or pollutants that may contaminate the groundwater. (5) All engineering boreholes, regardless of the depth limitations defined in O.C.G.A. § 12-5-122(3) and (8), which are located on property which is being used or is proposed to be used for the storage, manufacture, or processing of petroleum products, hazardous materials, hazardous wastes, industrial or municipal wastewater, brines, or any other chemical substances, must be completely filled, sealed, and plugged within 24 hours after the total depth is reached. It shall be the responsibility of the person in charge of the borehole construction to ensure proper abandonment. (6) Geologic boreholes which are in locations scheduled to be mined within two years after drilling need not be filled, sealed, and plugged. Other geologic boreholes shall be filled, sealed, and plugged within 24 hours after drilling. It shall be the responsibility of the person in charge of borehole construction to ensure proper abandonment. (7) Monitoring wells shall meet the requirements of abandonment as defined by this part unless they are declared temporarily abandoned. A monitoring well that is temporarily abandoned shall have a cap placed on it within 15 days of its temporary abandonment. It shall be the responsibility of the owner of the property on which the monitoring well is constructed to ensure proper abandonment of the well. (8) Seismic shot holes shall be filled, sealed, and plugged within 24 hours after the explosives have been detonated. It shall be the responsibility of the person in charge of the shot hole construction to ensure proper abandonment. (9) Abandoned individual, nonpublic, public irrigation, and industrial wells shall be filled, sealed, and plugged by a licensed water well contractor. (10) Abandoned engineering boreholes, geologic boreholes, dewatering wells, monitoring wells, and seismic shot holes shall be filled, sealed, and plugged under the direction of a registered professional geologist or registered professional engineer. (Ord. of 11-1-2001, § 11) State Law reference— Similar provisions, O.C.G.A. § 12-5-134(6)(J).

Ask a question about Savannah law

Corpus searches the Savannah sections it holds and shows the ones that match, with their citations. Free, no sign-in.