§ 6-2352 — Cable system construction map and schedule
Code of Ordinances of the City of Savannah, Georgia (Division II) (enCodePlus online edition as published 2026-11-20) · Savannah Code of Ordinances, pt. 6, ch. 1., art. AA, div. 4, § 6-2352
Corpus is an independent public-information project, not the official City of Savannah website. Stable reference: corpuslaw.us/code/512984a5-f6a9-48f4-a30d-5ad16547d373
Sec. 6-2352. - Cable system construction map and schedule.
(a) Map and plan. Within the time specified in the application, the grantee shall submit a construction plan or reconstruction plan which shall be incorporated by reference and made a part of the franchise agreement. The plan shall include cable system design details, equipment specifications and design performance criteria. The plan shall also include a map of the entire franchise area and shall clearly delineate the following: (1) Areas within the franchise area where the cable system will be initially available to subscribers including a schedule of construction for each year that construction or reconstruction is proposed; and (2) Areas within the franchise area where extension of the cable system cannot reasonably be undertaken due to lack of present or planned development or other similar reasons, with the areas and the reasons for not serving them clearly identified on the map. (b) Early construction and extension. Nothing in this section shall prevent the grantee from constructing or reconstructing the cable system earlier than scheduled. However, any delay in the cable system construction beyond the times specified in the plan report timetable shall require application to and consent by the city manager. (c) Delay in construction timetable. Any delay beyond the terms of construction or reconstruction timetable, unless approved by the city manager, will be considered a violation of this article for which the provisions of section 6-2388 shall apply as determined by the city. (d) Commencement of construction or reconstruction. Construction or reconstruction in accordance with the plan submitted by the grantee shall commence as soon after the grant and acceptance of a franchise as is reasonably possible. Failure to proceed expeditiously shall be grounds for revocation of a franchise. Failure to proceed expeditiously shall be presumed in the event construction or reconstruction is not commenced within 12 months of the grant and acceptance of a franchise. (e) Additional mandatory extension. Extension of a cable system into any area not specifically treated in the plan shall nonetheless be required if the terms of any of the following conditions are met: (1) Mandatory extension rule. The grantee shall extend cable system upon request to any contiguous area not designated for initial cable service in the construction plan when potential subscribers can be served by extension of cable system past existing dwelling units equivalent to a density of 30 homes per street mile for aerial cable or 50 homes per street mile for underground cable. Extension shall be at grantee's cost. If undergrounding is required by regulation, the grantee must make installation at the grantee's expense. Where aerial extension is allowed by regulation but underground installation is requested by benefited subscribers, the cost of undergrounding that exceeds estimated aerial extension cost may be charged to benefited subscribers. (2) Early extension. In areas not meeting the requirements for mandatory extension of cable service, the grantee shall provide, upon the request of five or more potential subscribers desiring cable service, an estimate of the costs required to extend cable service to the subscribers. The grantee shall then extend cable service upon request of the potential subscribers according to the existing rate schedule. The grantee may require advance payment or assurance of payment satisfactory to the grantee. The amount paid by subscribers for early extension shall be nonrefundable, and in the event the area subsequently reaches the density required for mandatory extension, such payments shall be treated as consideration for early extension. (3) Special agreements. Nothing herein shall be construed to prevent the grantee from serving areas not covered under this section upon agreement with developers, property owners or residents. (f) Aerial drops exceeding 150 feet. With respect to requests for connection requiring an aerial drop line in excess of 150 feet, the grantee must extend and make available cable service to such residents at a connection fee not to exceed the actual installation costs incurred by the grantee for the distance exceeding 150 feet. (g) Underground drops exceeding 150 feet. All areas required to be underground construction shall require all underground drop installations of not more than 150 feet at the cost of the grantee. Connections in excess of 150 feet shall be at the expense of a subscriber at the grantee's actual cost.
(Code 1977, § 6-2352)
Ask a question about Savannah law
Corpus searches the Savannah sections it holds and shows the ones that match, with their citations. Free, no sign-in.
