For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 8-2027 — Water supply and sewage disposal

Code of Ordinances of the City of Savannah, Georgia (Division II) (enCodePlus online edition as published 2026-11-20) · Savannah Code of Ordinances, pt. 8, ch. 2., art. G, § 8-2027

Corpus is an independent public-information project, not the official City of Savannah website. Stable reference: corpuslaw.us/code/23b06a6e-c7e6-4ff5-bf41-bec3c08c65cb

Sec. 8-2027. - Water supply and sewage disposal.

Each of the lots within a subdivision or a portion of a subdivision that is being opened shall have access to water supply that meets state drinking water quality standards and shall be capable of being served with a sewage disposal system that complies with the requirements of the state health department. (a) Public water supply system. When a public water supply system is accessible to a subdivision or a portion of a subdivision that is being opened, the developer shall be required to tie such subdivision or such portion of such subdivision to the public water systems, and the internal water service lines of the subdivision or portions of a subdivision shall be designed and installed to city specifications. A public water supply system shall be deemed accessible when the average cost per lot of tying to the public water system or installing a well to city specifications and installing the internal water line system for the total tract of land to be developed does not exceed by more than one and one-half times the average cost per lot of serving each lot with a private deep well if such tract was divided into lots of the minimum width permitted by the subdivision regulations and such lots are served by a public sewer system and a community water system. The average cost per lot of tying to the public water system will be determined by estimating quantities of various construction items from a preliminary layout of the system and applying unit prices. Detailed engineering drawings shall not be required to estimate the cost. When a well is installed to serve a subdivision, such well and the internal water line system shall be designed and installed to city specifications and shall be dedicated to the city. (b) Public sewer system. When a public sewer system is accessible to a subdivision or portion of a subdivision that is being opened, the developer shall be required to tie such subdivision or such portion of such subdivision to the public sewer system, and the internal sewer service lines of the subdivision or such portion of the subdivision shall be designed and installed to city specifications. A public sewage system shall be deemed accessible when the average cost per lot of tying to the public sewer system and installing the internal sewer line system for the total tract of land to be developed does not exceed by more than one and one-half times the cost of serving such tract with a private sewage system or with a private septic tank if such tract was divided into lots of the minimum width permitted by the subdivision regulations and such lots are served by a public sewer system and a community water system. The average cost per lot of tying to the public sewer system will be determined by estimating quantities of various construction items from a preliminary layout of the system and applying unit prices. Detailed engineering drawings shall not be required to estimate the cost. (c) Water supply by individual wells. When the city shall determine, as set forth in subsection (a), that a public water system is not accessible to serve the subdivision (either by tying to the public water system or by installing a well and internal water distribution system and dedicating it to the city), then the city shall permit individual wells to be placed on each lot; provided, however, that the state health department certifies that the wells on each lot will comply with state requirements for drinking water quality standards. (d) Septic tanks on individual lots. When the city shall determine, as set forth in subsection (b), that a public sewage system is not accessible to serve the subdivision, then the city shall permit individual septic tanks to be placed on each lot, but only if the state health department shall first certify that the lots in such subdivision can individually and collectively accommodate septic tanks without creating ground pollution or water pollution problems. (Ord. of 7-21-2005, § 1) Cross reference— Water supply and distribution, water and sewer services generally, § 5-1001 et seq.

Ask a question about Savannah law

Corpus searches the Savannah sections it holds and shows the ones that match, with their citations. Free, no sign-in.