§ 8-7031 — Permit procedures

Code of Ordinances of the City of Savannah, Georgia (Division II) (enCodePlus online edition as published 2026-11-20) · Savannah Code of Ordinances, pt. 8, ch. 7., art. C, § 8-7031

Corpus is an independent public-information project, not the official City of Savannah website. Stable reference: corpuslaw.us/code/0d9818b8-ce86-4483-8c11-95a2b051a461

Sec. 8-7031. - Permit procedures.

Application for a development permit shall be made to the city engineer on forms furnished by the city prior to any development activities, and may include, but not be limited to the following: plans in duplicate drawn to scale showing the elevations of the area in question and the nature, location, dimensions, of existing or proposed structures, earthen fill placement, storage of materials or equipment, and drainage facilities. Specifically, the following information is required: (1) 1. Application stage. (a) a. Elevation in relation to mean sea level (or highest adjacent grade) of the lowest floor, including basement, of all proposed structures; (b) b. Elevation in relation to mean sea level to which any non-residential structure will be floodproofed; (c) c. Design certification from a registered professional engineer or architect that any proposed nonresidential floodproofed structure will meet the floodproofing criteria of subsections 8-7046(2) and 8-7048(2); (d) d. Design certification from a registered professional engineer or architect that any new construction or substantial improvement placed in a coastal high hazard area will meet the criteria of subsection 8-7050(5); (e) e. Description of the extent to which any watercourse will be altered or relocated as a result of a proposed development; (f) f. All certificates shall be submitted in the same datum as identified in 8-7011, and; (2) 2. Construction stage. For all new construction and substantial improvements, the permit holder shall provide to the development services director an as-built certification of the regulatory floor elevation or floodproofing level immediately after the lowest floor or floodproofing is completed. Where a structure is subject to the provisions applicable to coastal high hazards areas, after placement of the lowest horizontal structural members. Any regulatory floor certification made relative to mean sea level shall be prepared by or under the direct supervision of a registered land surveyor or professional engineer and certified by same. When floodproofing is utilized for nonresidential structures, said certification shall be prepared by or under the direct supervision of a professional engineer or architect and certified by same. Any work undertaken prior to submission of these certifications shall be at the permit holder's risk. The development services director shall review the above referenced certification data submitted. Deficiencies detected by such review shall be corrected by the permit holder immediately and prior to further progressive work being allowed to proceed. Failure to submit certification or failure to make said corrections required hereby shall be cause to issue a stop-work order for the project.

(Ord. of 9-25-2008, art. 3, § B)

Ask a question about Savannah law

Corpus searches the Savannah sections it holds and shows the ones that match, with their citations. Free, no sign-in.