For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 8.2.2 — Surface Mine / Borrow Pit

Code of Ordinances of the City of Savannah, Georgia (Division II) (enCodePlus online edition as published 2026-11-20) · Savannah Code of Ordinances, pt. 8, ch. 3., art. 8.0, art. 8.2, § 8.2.2

Corpus is an independent public-information project, not the official City of Savannah website. Stable reference: corpuslaw.us/code/118a35d8-52b6-4a92-84aa-4194b4ad3a52

8.2.2 Surface Mine / Borrow Pit

(a) Applicability The requirements of this Section shall apply to all new, expanded or modified surface mining/borrow pit operations as of the Effective Date of this Ordinance and shall not affect the validity of any special use permit, site development plan or mining permit approved prior to the Effective Date of this Ordinance. For the purpose of this Ordinance, a mining or borrow site shall be the affected area subjected to surface mining, the area upon which overburden has been deposited and all other disturbed areas resulting from mining activities. (b) Compliance with Local, State and Federal Laws Compliance is required but may not be limited to the following: (i) O.C.G.A. §12-4-1 (Conservation and Natural Resources, Mineral Resources and Caves); (ii) Georgia Department of Environmental Protection §391-3-3 (Rules and Regulations for Surface Mining); (iii) City of Savannah Code of Ordinances Part 8, Chapter 6 (Erosion and Sedimentation Control), as applicable and amended. (c) Exemptions The activities provided below are exempt from the requirements of this Section. (i) Approved Development Grading, land clearing, site development and related activities undertaken in accordance with an approved site development plan, building permit or similar permit. (ii) Minor Excavation Excavation activity which involves the removal of less than one acre of soil from a single site to another site. For the purposes of this Section, a single site is defined to be one lot or a group of contiguous lots under common ownership. (d) Limitation on Exemptions Activities identified in Sec. 8.2.2.c. located within 100 feet of any waters of the State shall follow sound engineering and conservation measures to provide protective barriers, such as dams, berms, silt ponds or other similar structures between the land to be affected and waters or watersheds involved. In addition, all activities shall comply with any required permits from the Georgia Environmental Protection Division, U.S. Army Corps of Engineers or standards from the City of Savannah floodplain ordinance, as applicable. (e) Review Procedure All applications for Special Use Permit approval of a surface mine / borrow pit shall proceed according to Sec. 3.10, Special Use Permit. An extension of time for an approved special use permit shall be processed as a major am [image omitted; see the official code] [image omitted; see the official code] endment according to Sec. 3.10.3. (f) Development Plan A Development Plan shall be submitted in accordance with Sec. 3.8, Development Plan in conjunction with the Special Use Permit application. The Mayor and Aldermen may disapprove, approve or modify the plans so as to meet the purpose of this Section. In addition to the items required in the application checklist, the site development plan shall include: (i) A plat of the site; (ii) All property lines, existing structures and uses within 200 feet of the property lines; (iii) The location and condition of abutting roads and major drainage features; (iv) A description of truck or transportation routes to be used for transport of minerals, materials or fill, onsite and within 1,000 feet of the site. If a private road is proposed to be used, an authorization letter from the owner of the road; (v) Location of utility lines and easements on the site; (vi) Location of septic tanks and drain fields on the site; (vii) Existing potable water wells within 500 feet of the area to be disturbed. (viii) Required setbacks for all structures and operations; (ix) Location of all fences, walls, earth berms or vegetative buffers to be installed or existing on site; (x) Identification of all trees that might meet requirements for specimen or exceptional pursuant to City Code Part 4, Chapter 10, Landscape and Tree Protection Ordinance; (xi) An identification of the areas where surface mining/borrow pit activities, including all internal access roads, are proposed; (xii) Proposed days and hours of operation; (xiii) Estimated total area, in acres, to be mined; (xiv) Location of proposed and existing surface mining/borrow pit area located on the site including the types of minerals or materials to be mined or excavated on the site; (xv) Proposed method for onsite processing of minerals or materials; (xvi) Cross-sectional of the proposed depth of areas to be mined and relationship to the wet season high water table and geologic materials, based on test borings performed on the site; (xvii) Proposed location of groundwater monitoring wells on the site; (xviii) Proposed location of buildings and structures on site; (xix) Proposed location and height of milled asphalt storage piles, stockpiles and spoil or other excavated materials; (xx) Proposed location of tanks for liquids stored on the site; (xxi) Dimensions and total square feet of existing and planned impervious areas on the site; (xxii) The anticipated number of trips per day to or from the site. (xxiii) A description of how the minerals or materials are to be transported to and from the site, including all types and sizes of carriers to be utilized; (xxiv) Proposed method of dewatering. (xxv) Planned uses of the reclaimed area. The use or reuse of each excavated area shall be shown as one or more of the following: (1) A landfill in which the excavated property is filled, and no portion of the excavated property remains as a lake or pond; (2) A lake or pond consisting of the entirety of the excavated property within which no landfill material may be placed; (3) Forest land in which excavated property is filled and then seeded or planted with trees; or (4) Wetlands. (xxvi) The proposed time schedule for the beginning and ending of all surface mining/borrow pit activities. Information to be submitted as a basis for the schedule shall include the following: (1) Calculations of the volume to be excavated expressed in total cubic yards determined by the dimensions of the excavation area; (2) Identification of the volume of available fill material on a weekly or monthly basis; (3) Description of the type of material to be used for fill; and (4) Description of the proposed frequency of compaction and type of equipment to be used for compaction. (g) Construction Plans Following special use approval of the proposed surface mine/borrow pit, construction plans shall be submitted to and approved by the City Manager or his or her designee. No activity shall take place, except for securing the property or continuing existing surface mining for which a permit was previously granted, until the construction plans have been approved by the City Manager or his or her designee. Such plans shall include but not necessarily be limited to the following: (i) A scale drawing of the site including adjacent property and location of all buildings within 200 feet of the property lines. (ii) Location and condition of abutting roads and proposed principal route to and from the site and the location of on-site roads to serve areas of activity and points of ingress and egress at the site. (iii) Topography of the area including contours, easements and major drainage features. (iv) Existing and proposed land use plan approved as part of the Special Use Permit. (v) A time schedule for start and completion of surface mining activities for each area designated for such use within the time frame set by the Mayor and Aldermen upon approval of the Site Development Plan. (vi) Provisions for erosion and sedimentation control. (vii) Reclamation Plan A reclamation plan, prepared and sealed by a professional engineer registered in the state of Georgia. The plan shall describe the proposed mining and land reclamation operations and procedures to be followed. The plan shall include the following information: (1) Areas to be Reclaimed The total area of the entire mined, excavated or otherwise disturbed area that is to be reclaimed, in both percent of site area and total acres, as well as an annual schedule for the areas to be reclaimed. (2) Reclamation Methods A description of the manner in which restructuring, reshaping and revegetation will be accomplished. (3) Reclamation Timetable A timetable detailing the estimated time periods for stages of reclamation and reuse after the mining, excavation and fill activity has been completed. A time limit for completion of reclamation shall not be placed on areas reserved for slime ponds or settling ponds in mining operations. (4) Potential Future Uses of Site The potential and/or planned uses of the reclaimed area. Areas utilized for mining operations shall not be reused for residential purposes, except where engineering data is submitted showing that there has been adequate compaction to allow the type of residential construction proposed. (5) Proposed Erosion Control Proposed erosion control measures, including final site grading, final slopes and the locations and types of trees, grasses or other plant materials to be utilized. (6) Water Bodies and Stormwater Facilities The location, size and water elevations of any water bodies or stormwater facilities proposed as a permanent feature following mining operations. The proposed method for retaining water levels in permanent lakes. (h) Site Development Standards (i) Screening and Buffering A natural or landscaped buffer of at least 75 feet in width shall be provided along the entire boundary of the property. Where the site is adjacent to or within 300 feet of a residential use or zoning district, the buffer shall be at least 100 feet in width. Points of access shall be given exception from these minimum buffer requirements. To the greatest extent possible, natural vegetation and foliage existing on the site shall be retained to establish buffers. If the natural vegetation and foliage does not provide adequate visual buffer or noise attenuation, additional plantings, fences, earth berms or similar materials may be required by the City Manager or his or her designee. (ii) Maximum Heights (1) Buildings and Structures All buildings and structures shall comply with the height limit of the zoning district in which the mining or excavation and fill operation is located and may be further limited by the conditions of the special use permit. (2) Stockpiles, Spoil Piles and Storage of Materials Spoil piles, stockpiles or storage of excavated materials shall not exceed 50 feet in height and may be limited further by the conditions of the special use permit. (i) General Operation Standards The following standards shall apply to surface mining operations as shown in the approved Construction Plans. The standards shall be in addition to control measures imposed by the Georgia EPD. (i) Prohibited Activities Unless permitted by the special use permit, the activities listed below are prohibited in association with a surface mining/borrow pit operation. (1) Surface Waters and Wetlands Mining shall not be permitted in surface waters or wetlands, except as provided in the applicable requirements of this ULDC. Water shall not be diverted from natural stream channels and drainage ways shall not be interrupted or relocated except as provided in the approved development plan and as approved by GA EPD. (2) Operations in Groundwater Mining shall not be permitted in groundwater of the Floridian or intermediate aquifer systems, except as provided in the applicable requirements of the City Soil Erosion and Sedimentation Control Ordinance (Chapter 6). Groundwater withdrawals permitted as part of an approved mining operation shall not result in a lowering of the potentiometric levels of an aquifer beyond the boundaries of the approved mining or excavation and fill operation. (3) Vibration Vibration resulting from any mining operation sufficient to cause damage of any kind to persons or property not included within the approved area of operation. (4) Blasting Where specifically permitted by the conditions of a special use permit, blasting or other use of explosives shall comply with all applicable federal, state and local standards. (5) Degradation of Water Quality No trash or other materials shall be deposited into water-filled pits or low areas with standing water. For such water-filled areas, a 24-hour per day pumping operation shall be required to have an approved drainage structure. Drainage shall be conducted in a manner which shall not have an adverse effect on the environment or cause any damage or problem to other properties. (ii) Hours of Operation Mining activities shall occur only from 7 a.m. to 7 p.m., as permitted by the City Noise Ordinance, Monday through Saturday. More limited hours of operation may be imposed at the time of special use permit approval. (iii) Access Access to the site shall be controlled and monitored by a responsible agent of the operator. Signs shall be posted at the site to forbid trespass. Access shall be limited to authorized entrances which shall be closed when the site is not in operation. (iv) Access Routes Mining operations shall be permitted only at sites served by roads adequate to accommodate the projected truck traffic. Access shall not be permitted from an interior road through a platted subdivision unless the excavation is specifically designed to facilitate the completion of the subdivision in which the haul route is located. Haul roads through platted subdivisions must be closed prior to the issuance of the first Certificate of Occupancy along the haul road. If access to a site is over an unpaved segment of public road, the operator shall be responsible for maintenance of the unpaved segment in a satisfactory operating condition. (v) Temporary Road Stabilization On the site of mining operations, the use of milled or crushed asphalt is permitted for road stabilization. Asphalt used for this purpose may be stored temporarily within an unexcavated area or a reclaimed area of the site. The material shall be removed from a roadway when it is no longer in use. On-site disposal or burial of asphalt is prohibited. The development plan shall include an identification of all areas proposed as asphalt or material storage areas and a procedure for the disposal of material utilized for temporary road stabilization. (vi) Dust Controls Mining activities shall be operated in a manner that shall minimize dust emissions. Dirt roads within the site and unpaved public roads in the vicinity used for access to and circulation within the project may require dust retardant treatment at the expense of the operator. The use of suppressants as a dust retardant technique shall be evaluated by the City Manager or his or her designee and receive approval before their use is permitted. (vii) No trash or other materials shall be deposited into water-filled pits or low areas with standing water. For such water-filled areas, a 24-hour per day pumping operation shall be required to have an approved drainage structure. Drainage shall be conducted in a manner which shall not have an adverse effect on the environment or cause any damage or problem to other properties. (viii) The operator shall be responsible for the control and proper disposal of incidental litter by providing fencing or other physical barriers as necessary and by policing the site. The operator shall be responsible for prompt cleanup of any waste dumped within 500 feet of the premises. (ix) Rodents and insects shall be controlled. (x) Test Borings For proposed new or expanded mining operations, test borings shall be required to delineate geologic conditions, and to determine the interface between the surficial and Floridian aquifers and the locations of groundwater tables on a site. In existing operations, new test borings shall be performed prior to development of new excavation or mining areas. At a minimum, the test borings shall comply with the standards listed below. (i) Minimum Depth All borings shall be conducted to a depth of not less than 10 feet below the deepest proposed mining or excavation. (ii) Maximum Spacing All borings shall be spaced at a minimum of 500-foot intervals in two transverse directions. (iii) Log Content The boring log shall indicate the geologic description and thickness of all strata encountered, including topsoil, overburden, mineral deposit or material to be mined or excavated and material immediately underlying the mineral deposit or material, and the position of the groundwater in relating to individual boring. (xi) Method of Excavation All excavation of overburden shall be accomplished in a manner conducive to segregated stockpiling of differing geologic materials. Topsoil, clean sands and clayey soils shall each be stockpiled separately or layered in stockpiles in such a manner as to avoid commingling of differing geologic materials, and in all cases, care shall be taken to avoid contaminating topsoil with clayey materials. (j) Reclamation Standards for Surface Mining / Borrow Pit Sites The following standards shall apply to the reclamation of surface mining sites upon the completion of operations. These standards shall be in addition to control measures imposed by the Georgia Environmental Protection Division, including those measurers specified in the Division's Rules and Regulations for Land Reclamation relating to control of erosion and siltation and to the protection of public roads and public waters from the adverse effects of surface mining. In addition to the state-imposed controls mentioned above, the following local standards shall apply: (i) Reclamation shall be done to the extent possible concurrent with excavation on an annual basis as lands become available, and in any case shall be completed within 12 months from the cessation of operations and shall be carried on in a manner that will achieve the objectives of the approved land use plan. (ii) Abandoned or worn-out equipment shall not be permitted to remain on the site and large rocks and debris such as stumps, logs, and timber shall be removed from the site or buried. (iii) All structures, buildings and foundations associated with operations shall be removed from the site or buried unless they are compatible with reclamation objectives. (iv) The perimeter of any lake or pond shall be graded and sloped so as to achieve the following standards: (1) The water depth around the perimeter of the lake as measured 12 feet from the shoreline shall not be less than three (3) feet or more than four (4) feet so as to provide for safety and aquatic weed control at the shoreline. (2) Beyond the 12-foot mark as measured from the shoreline, the slope shall not exceed a horizontal to vertical ratio of 3:2 in the City to a water depth of seven (7) feet. (3) Beyond the seven (7) foot depth, the slope shall not exceed a horizontal to vertical ratio of 1:1. (4) The primary water body shall provide a minimum depth of four (4) feet including seasonal variations in water levels. (v) The water within any lake or pond shall be free of underwater hazards including poles, pilings, abandoned equipment, etc. (vi) If a lake or pond is included as a permanent feature of the reclaimed site, access to the lake shall be controlled by means of a wire or chain link fence to be constructed to a minimum height of six (6) feet. Provided, however, this provision maybe waived by the Planning Commission when such lake or pond is designed to provide an amenity to an adjoining residential development or is open to the general public for recreational purposes. (vii) Soil Restoration Upon completion of the mining operation, restoration of the ground surface shall be accomplished by replacement of each of the differing soil types in reverse sequence from that in which they were removed. Each separate layer, horizon or geologic strata shall be replaced and consolidated before the succeeding layer is replaced. Topsoil uncontaminated with clay-like materials shall be placed as the final surface cover on all mining operations. (viii) Final Contours Contours shall be regraded as closely as possible to those existing originally on the site unless the reclamation plan has established an alternate set of contours as being more desirable for the final intended use of the reclaimed land. If the nature of mining operations is such that quantities of available spoil material are not adequate for restoration to original contours, then the site shall be reclaimed so that no slope is steeper than one (1) foot of vertical run to six (6) feet of horizontal run, except in the case of lime rock cuts, which shall be left at a stable slope. (k) Enforcement of Operation and Reclamation Standards The City Manager or his or her designee shall be responsible for regular inspections of surface mining sites and for the enforcement of standards set forth within this Section. Failure of the operator to comply with any of these regulations shall be grounds for closure of the site or other legal action as deemed appropriate. (l) Certification of Approved Plans Site development plans approved by the Planning Commission, as certified by the Planning Director, shall be submitted to the City Manager or his or her designee for the issuance of applicable permits and for monitoring and enforcement of the provisions of these regulations and approved development plans. A certified copy of the approved development plans including a land use plan and any protective covenants on the property, permitted uses and development standards, protecting buffer easements, permanent open spaces, and other easements, shall be forwarded by the Planning Director to the Clerk of Superior Court of Chatham County, Georgia, to be recorded. The MPC shall provide the developer and the City Manager or his or her designee with the subdivision map book number and page number in which the development plan and covenants have been recorded by the Clerk of Superior Court. The cost of such recording shall be paid by the developer and shall be deposited with the MPC prior to such recording. (m) Variances The City Manager or his or her designee may approve variances to this Section as deemed necessary.

Ask a question about Savannah law

Corpus searches the Savannah sections it holds and shows the ones that match, with their citations. Free, no sign-in.