For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

Chapter 9 — POST-CONSTRUCTION STORMWATER MANAGEMENT FOR NEW DEVELOPMENT AND REDEVELOPMENT

Code of Ordinances of the City of South Fulton, Georgia (Codified through Ordinance No. 2026-022, enacted July 14, 2026. (Supp. No. 13, Update 2)), South Fulton, GA · 18 sections. Independent public-information project, not the official City of South Fulton website.

  1. § 3-9001 — Purpose and intent
  2. § 3-9002 — Definitions
  3. § 3-9003 — Adoption and implementation of the GSMM; conflicts and inconsistencies
  4. § 3-9004 — Designation of administrator
  5. § 3-9005 — Applicability criteria for stormwater management standards
  6. § 3-9006 — Exemptions from stormwater management standards
  7. § 3-9007 — Stormwater management standards
  8. § 3-9008 — Pre-submittal meeting, stormwater concept plan, and stormwater management plan requirements
  9. § 3-9009 — Application fee
  10. § 3-9010 — Application procedures
  11. § 3-9011 — Compliance with the approved stormwater management plan
  12. § 3-9012 — Inspections to ensure plan compliance during construction
  13. § 3-9013 — Final inspection; as-built drawings; delivery of inspection and maintenance agreement
  14. § 3-9014 — Violations and enforcement
  15. § 3-9015 — Maintenance by owner of stormwater management systems predating current GSMM
  16. § 3-9016 — Inspection and maintenance agreements
  17. § 3-9017 — Right of entry for maintenance inspections
  18. § 3-9018 — Owner's failure to maintain the stormwater management system
Chapter 9 — POST-CONSTRUCTION STORMWATER MANAGEMENT FOR NEW DEVELOPMENT AND REDEVELOPMENT | South Fulton, GA | Corpus