§ 3-9006 — Exemptions from stormwater management standards
Code of Ordinances of the City of South Fulton, Georgia (Codified through Ordinance No. 2026-022, enacted July 14, 2026. (Supp. No. 13, Update 2)) · South Fulton Code of Ordinances § 3-9006
Corpus is an independent public-information project, not the official City of South Fulton website. Stable reference: corpuslaw.us/code/f2d3b6c7-1add-43d4-af01-ae6a265a9a63
Sec. 3-9006. - Exemptions from stormwater management standards.
This chapter shall not apply to the following activities: (1) Land disturbing activity conducted by local, state, authority, or federal agencies, solely to respond to an emergency need to protect life, limb, or property or conduct emergency repairs; (2) Land disturbing activity that consists solely of cutting a trench for utility work and related pavement replacement; (3) Land disturbing activity conducted by local, state, authority, or federal agencies, whose sole purpose is to implement stormwater management or environmental restoration; (4) Repairs to any stormwater management system deemed necessary by the administrator; (5) Agricultural practices as described O.C.G.A. § 12-7-17(5) within areas zoned for these activities with the exception of buildings or permanent structures that exceed the threshold in section 3-9005(1) or (2); (6) Silvicultural land management activities as described O.C.G.A. § 12-7-17(6) within areas zoned for these activities with the exception of buildings or permanent structures that exceed the threshold in section 3-9005(1) or (2); (7) Installations or modifications to existing structures solely to implement Americans with Disabilities Act (ADA) requirements, including but not limited to elevator shafts, handicapped access ramps and parking, and enlarged entrances or exits; and (8) Linear transportation projects being constructed by the City of South Fulton to the extent the administrator determines that the stormwater management standards may be infeasible to apply, all or in part, for any portion of the linear transportation project. For this exemption to apply, an infeasibility report that is compliant with the City of South Fulton linear feasibility program shall first be submitted to the administrator that contains adequate documentation to support the evaluation for the applicable portion(s) and any resulting infeasibility determination, if any, by the administrator.
(Ord. No. 2020-032, § 1, 10-27-2020)
Ask a question about South Fulton law
Corpus searches the South Fulton sections it holds and shows the ones that match, with their citations. Free, no sign-in.