For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 13-6001 — Electric vehicle (EV) charging station

Code of Ordinances of the City of South Fulton, Georgia (Codified through Ordinance No. 2026-022, enacted July 14, 2026. (Supp. No. 13, Update 2)) · South Fulton Code of Ordinances § 13-6001

Corpus is an independent public-information project, not the official City of South Fulton website. Stable reference: corpuslaw.us/code/4a2692fd-e457-48ff-859b-3423ad870e55

Sec. 13-6001. - Electric vehicle (EV) charging station.

(a) All new and existing EV charging stations located in public, private, or commercial parking facilities, with the exception of single-family residences which are specifically excluded from coverage under this chapter, shall be equipped with an NFPA 701 Standard Compliant lithium-ion vehicle fire blanket. (b) The vehicle fire blanket(s) shall be stored in a weatherproof storage box and labeled, "VEHICLE FIRE BLANKET—FOR FIRE DEPARTMENT USE ONLY." (c) The mounting location of the fire blanket box shall be determined by the Fire Marshal. (d) The fire blanket box shall be secured with a specific keyed padlock which is accessible by the fire department, and not the general public, as designated by the Fire Marshal. (e) Vehicle fire blankets are subject to expiration, as per manufacturer specifications, and must be replaced as indicated. (f) All public, private, and commercial parking facilities which have one or more EV charging stations will be subject to inspection annually by the Fire Marshal or other authorized city inspectors and/or designees to ensure compliance with this chapter. (g) The number of EV charging parking spaces determines the number of required vehicle fire blankets. (1) For one EV charging parking space, one vehicle fire blanket is required. (2) For two to ten EV charging parking spaces, two vehicle fire blankets are required. (3) For eleven to fifteen EV charging parking spaces, three vehicle fire blankets are required. (4) For every additional five EV charging parking spaces beyond 15 charging parking spaces, an additional vehicle fire blanket is required. (h) All owners will have a grace period of six months from the effective date of the ordinance to come into compliance from the date this chapter becomes effective. (i) Any applicable owner or leaseholder covered by this section who violates any provision of this chapter will be subject to the penalties set forth in the City Charter and Code for said violations, and upon conviction, may be punished by fine or imprisonment, provided that the maximum fine for a violation of this section shall not exceed $1,000.00.

(Ord. No. 2024-041, § 1, 11-12-2024)

Ask a question about South Fulton law

Corpus searches the South Fulton sections it holds and shows the ones that match, with their citations. Free, no sign-in.