For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 14-13003 — Incentives

Code of Ordinances of the City of South Fulton, Georgia (Codified through Ordinance No. 2026-022, enacted July 14, 2026. (Supp. No. 13, Update 2)) · South Fulton Code of Ordinances § 14-13003

Corpus is an independent public-information project, not the official City of South Fulton website. Stable reference: corpuslaw.us/code/15308e87-adb1-4309-ae4a-9fcca3f748bf

Sec. 14-13003. - Incentives.

This chapter recognizes four different areas in which builders may be granted expedited plan review for incorporating sustainable concepts into building projects: (1) Green building: a. Several different certification programs exist to rate the sustainability of a building. One such standard is the Unites States Green Building Council's Leadership in Energy and Environmental Design (LEED) rating system. Additionally, the Environmental Protection Agency and United States Department of Energy's EnergyStar and EarthCraft programs include guidelines for buildings that are not LEED certified. b. Builders seeking green building certification(s) including LEED, EarthCraft, and ENERGY STAR must submit proof of LEED, EarthCraft House or ENERGY STAR registration and the corresponding program's checklist indicating all of the credits they plan to pursue. Additionally, intentions must be shown on building plans and indicated on their building permit application in order to be granted expedited plan review. (2) Solar energy: a. Multiple uses for solar energy can be incorporated into buildings. One of the most common uses of solar energy is photovoltaic, or solar panels, which use solar power technology through an array of photovoltaic cells to convert light from the sun directly into electricity. Solar cells produce direct current (DC) electricity from light, which can be used to power DC equipment or to recharge a battery. An inverter is required to convert the DC electricity to alternating current (AC) electricity to power almost all uses of electricity in the home. The basic photovoltaic cell typically produces only a small amount of power. To produce more power, cells can be interconnected to form modules, which can in turn be connected into arrays to produce yet more power. A second method of using solar energy is solar water heaters. Solar water heating systems include storage tanks and solar collectors. There are two types of solar water heating systems: active, which have circulating pumps and controls, and passive, which do not have circulating pumps. b. Builders incorporating solar energy elements, such as photovoltaic or solar water heaters, as shown on building plans and indicated on their building permit application shall be granted expedited plan review. (3) WaterSense: a. WaterSense is a program developed by the United States Environmental Protection Agency and the new home certification is available as of December 2009. WaterSense labeled new homes are designed to reduce residential water use indoors, as well as outdoors, compared to typical new homes. WaterSense labeled homes have been independently verified to use 20 percent less water than typical new homes. b. Builders seeking WaterSense new home certification must submit a checklist of EPA WaterSense measures with intentions for meeting certification measures shown on building plans. Additionally, intentions must be indicated on their building permit application shall be granted expedited plan review. (4) Pervious paving: a. Pervious paving materials permit water to enter the ground by virtue of their porous nature or by large spaces in the material. Water-pervious materials such as gravel, crushed stone, open paving blocks, porous asphalt, concrete pavement, or pervious paving blocks for driveways, parking areas, walkways, and patios minimize runoff from those areas, as well as increase infiltration. Some pervious paving options can retain turf and carry autos and trucks evenly without creating tracks or other heavy traffic wear signs. b. Building projects incorporating pervious paving materials, such as open paving blocks, porous asphalt, concrete pavement, or pervious paving blocks for driveways, parking areas, walkways, and patios, as shown on building plans and indicated on their building permit application shall be granted expedited plan review.

(Ord. No. 2020-020, § 1, 7-28-2020)

Ask a question about South Fulton law

Corpus searches the South Fulton sections it holds and shows the ones that match, with their citations. Free, no sign-in.