Sec. 14-17007. - Buffer and setback requirements.
All land development activity subject to this chapter shall meet the following requirements: (1) An undisturbed natural vegetative buffer shall be maintained for 75 feet, measured horizontally, on both banks (as applicable) of the stream as measured from the top of the stream bank. (2) An additional setback shall be maintained for 25 feet, measured horizontally, beyond the undisturbed natural vegetative buffer, in which all impervious cover shall be prohibited. Grading, filling and earthmoving shall be minimized within the setback. (3) No septic tanks or septic tank drain fields shall be permitted within the buffer or the setback.
(Ord. No. 2020-034, § 1, 10-27-2020)
Ask a question about South Fulton law
Corpus searches the South Fulton sections it holds and shows the ones that match, with their citations. Free, no sign-in.