§ 17-4005 — Permits required for installation or excavation in rights-of-way and roads; no property interest in location of utility facility
Code of Ordinances of the City of South Fulton, Georgia (Codified through Ordinance No. 2026-022, enacted July 14, 2026. (Supp. No. 13, Update 2)) · South Fulton Code of Ordinances § 17-4005
Corpus is an independent public-information project, not the official City of South Fulton website. Stable reference: corpuslaw.us/code/378b491d-1f1b-4424-8de3-69b373dbf03c
Sec. 17-4005. - Permits required for installation or excavation in rights-of-way and roads; no property interest in location of utility facility.
Before installing or relocating any utility facility which may occupy or encroach on the right-of-way acquired for city projects, or which is part of the South Fulton Municipal Street System, the utility owner and/or contractor must obtain authorization from the public works director. For all initial installations, a written permit shall be required. Also, for relocation or adjustment of utility facilities for which a written permit has not previously been issued, and which are not covered by an indemnity agreement, a permit shall be required. Except as may be provided by state or Federal laws, placement of a utility facility within the public rights-of-way or public roads shall not be deemed to give any person a property or other interest in any particular location within the public rights-of-way or public roads, or any preference over any other person issued a permit to utilize the public rights-of-way or public roads. The city reserves the right to designate where a particular utility facility may be located for the purposes of protecting current or future use of its public roads to promote the public health, safety or welfare.
(Ord. No. 2018-042, § 1, 11-13-18)
Ask a question about South Fulton law
Corpus searches the South Fulton sections it holds and shows the ones that match, with their citations. Free, no sign-in.
