§ 3-10010 — Requirements
Code of Ordinances of the City of South Fulton, Georgia (Codified through Ordinance No. 2026-022, enacted July 14, 2026. (Supp. No. 13, Update 2)) · South Fulton Code of Ordinances § 3-10010
Corpus is an independent public-information project, not the official City of South Fulton website. Stable reference: corpuslaw.us/code/9aad46c0-2e1e-4a1c-9274-4561dcbbeb1d
Sec. 3-10010. - Requirements.
Prior to any blasting, the permit holder shall conduct a pre-blast inspection. This inspection shall include all structures within a minimum distance of 500 feet or such extended distance as maybe specified on the permit, from the site of the proposed blast. A written report describing this inspection shall be completed and signed by the permit holder and be available for review by the fire department. All blasting shall be conducted in compliance with Chapter 120-3-10 of the Rules and Regulations of the Safety Fire Commissioner of Georgia and O.C.G.A. §§ 25-2-4, 25-2-17, 25-8-9. Except as previously approved by the chief, all blasting within 1,000 feet of any structure shall be covered by a blasting mat(s). The fire department shall be notified at least 48 hours prior to any blasting within a project and both fire and police departments shall be notified at least one hour prior to any shot. Owner or occupants of occupied structures within 750 feet of the blast must be notified of the blast in writing 72 hours prior to the blast. The blasting site is required to be inspected by a fire inspector from the fire marshal's office prior to blasting. Blasting permit applications must be submitted to the permit office before inspections can be scheduled.
(Ord. No. 2021-028, § 10, 11-9-2021)
Ask a question about South Fulton law
Corpus searches the South Fulton sections it holds and shows the ones that match, with their citations. Free, no sign-in.
