For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 9.4 — SANITARY SEWER MANAGEMENT

Code of Ordinances of the City of South Fulton, Georgia (Codified through Ordinance No. 2026-022, enacted July 14, 2026. (Supp. No. 13, Update 2)) · South Fulton Code of Ordinances § 9.4

Corpus is an independent public-information project, not the official City of South Fulton website. Stable reference: corpuslaw.us/code/d4ae2ea3-7d9f-4e20-b888-142fed9cda76

9.4 - SANITARY SEWER MANAGEMENT

9.4.1 When public sanitary sewers are within 300 feet of the subdivision, the subdivider shall provide sanitary sewer services to each lot within the bounds of the subdivision. All street sewers serving lots in the subdivision shall be installed by the subdivider. A formula may be developed by the Department of Public Works to provide for a sharing of the costs of sewer facilities needed to serve the subdivision and other subdivisions in the same drainage basin. 9.4.2 When, in the written opinion of the Health and Wellness Department and the Department of Public Works, public sanitary sewer is not accessible, an alternate method of sewage disposal for each lot or a community sewerage disposal system may be used when in compliance with the standards of the Health and Wellness Department and Fulton County Sewer Regulations. 9.4.3 When the operation of a temporary sanitary sewer system requires land to be set aside for a disposal plant, the property owner shall give the City title to the property for as long as the plant is in operation. The title may carry a reversionary clause returning the property to the owner when the site is no longer necessary for the operation of the plant. 9.4.4 In a drainage basin which at time of plat application is scheduled for a public sewerage system, all subdivisions shall be provided with a temporary community sewerage disposal system as approved by the Department of Public Works and the Health and Wellness Department. The system shall include permanent sewerage outfall lines plus a temporary treatment plant to be installed by the subdivider. Whenever the installation of a sanitary sewer is required, as provided by these rules and regulations, no new street shall be paved without the sewer being first installed in accordance with the requirements of the sewer specifications of the City Department of Public Works and the Fulton County Sewer Regulations. If a subdivision is re-platted and the originally platted lots configuration is changed after the sewer service lines have been installed, the sewer system shall be modified to properly serve each lot in accordance with Fulton County sewer specifications.

Ask a question about South Fulton law

Corpus searches the South Fulton sections it holds and shows the ones that match, with their citations. Free, no sign-in.