§ 21-5.60-6 Utility.

Uses in the utility category that are required to comply with specific standards are set forth in this section. Development standards required in other articles of this chapter apply to all uses. (a) Small standards. (1) General: (A) All equipment, including rooftop-mounted equipment, must be set back pursuant to the height setbacks for the underlying zoning district or special district, unless otherwise specified below. (B) All clearances to utility facilities, including overhead lines and poles, must comply with all standards of the applicable utility provider. (C) Small utilities will be deemed abandoned if operations cease for one continuous year, with the exception of periods related to necessary maintenance, transfer of ownership or operation, or repairs to the system. Upon determination by the director that a small utility has been abandoned, the structure must be dismantled and removed or repurposed within 90 days after receipt of written notice from the director, unless the small utility owner or operator demonstrates to the director s satisfaction the owner or operator s good faith efforts to sell, repurpose, dismantle, or remove the small utility in a timely manner, or to otherwise restore the site on which the abandoned small utility was located. (D) In an emergency, a utility may undertake corrective actions deemed necessary by the utility to avoid unacceptable hazard to life, significant loss of property, or significant economic hardship due to extended loss of power or service. (2) Solar energy generation. (A) A solar energy generation facility of any size is considered a small utility if it is mounted to the roof of a permitted structure dedicated to a separate principal use permitted in the underlying zoning district. (B) A solar energy generation facility of up to 5 acres in size is considered a small utility if it is mounted on a structural support over existing surface parking dedicated to a use permitted in the underlying zoning district. (C) A ground-mounted solar energy generation facility is considered a small utility if it is less than 20 acres in area. (D) Notwithstanding paragraphs (A), (B), and (C), a solar energy generation facility is not considered a small utility, but rather a medium utility if: (i) There are proposed or existing solar energy generation facilities on the same zoning lot or abutting zoning lots, so that the total facility size exceeds 20 acres, excluding permitted rooftop solar energy generation facilities; (ii) The zoning lot is within the State land use agricultural or conservation districts; or (iii) The solar energy generation facility involves the use of a historic site listed on the Hawaii or National Register of Historic Places. (E) Applications for solar energy generation facilities must include a landscape plan that shows how the facility will be screened from surrounding uses and how displaced trees will be relocated or replaced elsewhere on the zoning lot or surrounding area. (F) If a solar energy generation facility exceeds 50,000 square feet in area and is within 500 feet of the property line of any adjoining zoning lot in the country, residential, apartment, or apartment mixed-use zoning districts, the facility must be fully screened from the adjoining zoning lots in those zoning districts by a landscaped hedge, solid wall, or screening fence a minimum of 6 feet in height. If the provision of solid screening is not feasible, the solar energy generation facility will be considered a medium utility. (3) Wind energy generation. (A) A wind energy generation facility is considered a small utility if it is located within the agricultural, country, residential, apartment, apartment mixed-use, business, business mixed-use, resort, industrial, industrial mixed-use, or preservation zoning districts, and has a rated capacity of no more than 15 kilowatts. (B) A rooftop wind energy generation facility is considered a small utility if it is accessory to a principal use permitted in the underlying zoning district on the same zoning lot. (C) For a ground-mounted wind energy generation facility, the tower climbing apparatus and blade tips must not be lower than 15 feet from ground level, unless enclosed by a fence a minimum of 6-feet in height, and must not be within 7 feet of any roof or structure unless the blades are completely enclosed by a protective screen or fence. (D) A small wind energy generation facility must be set back from all property lines at a minimum distance equal to the height of the facility. Height is measured from the farthest vertical extension of the tower, which includes the height of the tower or its vertical support structure and the farthest vertical extension of the blade tip from the tower. (E) In the AG-1 and AG-2 zoning districts, a minimum of 51 percent of the zoning lot area suitable for crop production or livestock and poultry keeping must be dedicated to crop production or livestock and poultry keeping for as long as the small wind energy generation facility is in operation, as evidenced by a farm plan that shows the area and percentage of the zoning lot to be in active agricultural use, and includes information about a farm or ranch s resources, goals, business plan, and timeline to engage in crop production or livestock and poultry keeping . (b) Medium standards. (1) General. (A) All equipment, including rooftop-mounted equipment, must be set back pursuant to the height setbacks for the underlying zoning district or special district, unless otherwise specified below. (B) All clearances to utility facilities, including overhead lines and poles, must comply with all standards of the applicable utility provider. (C) Medium utilities will be deemed abandoned if operations cease for one continuous year, with the exception of periods related to necessary maintenance, transfer of ownership or operation, or repairs to the system. Upon determination by the director that a medium utility has been abandoned, the structure must be dismantled and removed or repurposed within 180 days after receipt of written notice from the director, unless the medium utility owner or operator demonstrates to the satisfaction of the director the owner or operator s good faith efforts to sell, repurpose, dismantle, or remove the medium utility in a timely manner, or to otherwise restore the site on which the abandoned medium utility was located. (D) In an emergency, a minor conditional use permit is not required to undertake corrective actions deemed necessary by the utility to avoid unacceptable hazard to life, significant loss of property, or significant economic hardship due to extended loss of power or service; provided that the utility shall obtain after-the-fact approvals for the emergency work performed as soon as practicable after the emergency has ended. (2) Solar energy generation. (A) Applications for solar energy generation facilities must include a landscape plan that shows how the facility will be screened from surrounding uses and how displaced trees will be relocated or replaced elsewhere on the zoning lot or within the surrounding area. (3) Wind energy generation. (A) A wind energy generation facility is considered a medium utility if it is located within the agricultural, country, industrial, or industrial mixed-use zoning districts, and has a rated capacity of 15 kilowatts or more, but no more than 99 kilowatts. Medium wind energy generation facilities are not permitted in other zoning districts. (B) For any ground-mounted wind energy generation facility, the tower climbing apparatus and blade tips of the facility may not be lower than 15 feet from ground level, unless enclosed by a 6-foot high fence, and may not be within 7 feet of any roof or structure, unless the blades are completely enclosed by a protective screen or fence. (C) A public safety sign must be posted at the base of the wind energy generation facility warning of high voltage and dangerous moving blades. (D) All guy wires must be anchored onsite and outside of any right-of-way, equipped with safety devices that will prevent them from being climbed, and securely fastened. (E) A medium wind energy generation facility, whether mounted on the ground or on a structure, must be set back from all property lines at a minimum distance equal to the height of the facility. Height is measured from the farthest vertical extension of the tower, which includes the height of the tower or its vertical support structure and the farthest vertical extension of the blade tip from the tower. (F) In the AG-1 and AG-2 zoning districts, a minimum of 51 percent of the zoning lot area suitable for crop production or livestock and poultry keeping must be dedicated to crop production or livestock and poultry keeping for as long as the medium wind energy generation facility is in operation, as evidenced by a farm plan that shows the area and percentage of the zoning lot to be in active agricultural use, and includes information about a farm or ranch s resources, goals, business plan, and timeline to engage in crop production or livestock and poultry keeping. (c) Large standards. (1) General. (A) All equipment, including rooftop-mounted equipment, must be set back pursuant to the height setbacks for the underlying zoning district or special district precinct, unless otherwise specified below. (B) All clearances to utility facilities, including overhead lines and poles, must comply with all standards of the applicable utility provider. (C) Large utilities will be deemed abandoned if operations cease for one continuous year, with the exception of periods related to necessary maintenance, transfer of ownership or operation, or repairs to the system. Upon determination by the director that a large utility has been abandoned, the structure must be dismantled and removed or repurposed within one year after receipt of written notice from the director, unless the large energy generation system owner or operator demonstrates to the satisfaction of the director the owner or operator s good faith efforts to sell, repurpose, dismantle, or remove the large utility in a timely manner, or to otherwise restore the site on which the abandoned large utility was located. (D) In an emergency, a minor conditional use permit is not required to undertake corrective actions deemed necessary by the utility to avoid unacceptable hazard to life, significant loss of property, or significant economic hardship due to extended loss of power or service; provided that the utility shall obtain after-the-fact approvals for the emergency work performed as soon as practicable after the emergency has ended. (2) Wind energy generation. (A) Large wind energy generation facilities are not permitted in the preservation, residential , apartment, apartment mixed-use, business, business mixed-use, resort, industrial, and industrial mixed-use zoning districts. (B) For any ground-mounted wind energy generation facility, the tower climbing apparatus and blade tips of the facility may not be lower than 15 feet from ground level, unless enclosed by a 6-foot high fence, and may not be within 7 feet of any roof or structure, unless the blades are completely enclosed by a protective screen or fence. (C) A public safety sign must be posted at the base of the wind energy generation facility warning of high voltage and dangerous moving blades. (D) All guy wires must be anchored onsite and outside of any right-of-way, and equipped with safety devices that will prevent them from being climbed, and must be securely fastened. (E) Large wind energy generation facilities must be set back as follows: (i) From all property lines a minimum distance equal to the height of the facility; and (ii) From the property lines of any zoning lot located in the country, residential, apartment, apartment mixed-use, or resort zoning districts, a minimum distance of 10 times the height of the facility or 1.25 miles, whichever is greater. For purposes of this paragraph, height is measured from the farthest vertical extension of the tower, which includes the height of the tower or its vertical support structure and the farthest vertical extension of the blade tip from the tower. (F) With regard to occupied buildings in proximity to the facility that exist on the submission date of the facility s conditional use permit application: (i) No portion of a large wind energy facility may cause more than 10 hours per year or 10 minutes per day of shadow flicker on existing occupied buildings; and (ii) During normal operation, facility noise levels may not exceed 10 dBA above ambient sound levels at existing occupied buildings. Prior to the issuance of a conditional use permit for the facility, the applicant shall submit to the department site-specific data (such as weather, topography, and turbine operating characteristics) using software models such as WindPro or iNoise, demonstrating conformity with shadow flicker and noise restrictions. (G) For large wind energy generation facilities with approved land use permits that were legally established on September 30, 2025, the repair, maintenance, or component replacement of the facility during the term of the facility s current power purchase agreement may involve an increase in the height of the facility as follows: (i) By an incremental amount not to exceed 7 percent of the original height of the facility; or (ii) Up to a maximum height of 575 feet; whichever is the lesser facility height; provided that the facility operates under and within the scope of its approved land use permits, and must comply with the minimum setback required under paragraph (E)(i). Any increase in height pursuant to this paragraph will not be deemed to increase the facility s setback nonconformity. (H) In the AG-1 and AG-2 zoning districts, a minimum of 51 percent of the zoning lot area suitable for crop production or livestock and poultry keeping must be dedicated to crop production or livestock and poultry keeping for as long as the large wind energy generation facility is in operation, as evidenced by a farm plan that shows the area and percentage of the zoning lot to be in active agricultural use, and includes information about a farm or ranch s resources, goals, business plan, and timeline to engage in crop production or livestock and poultry keeping. (Added by Ord. 25-2) Editor s note: September 30, 2025 is substituted for the effective date of this ordinance.

Ask a question about City and County of Honolulu law

Corpus searches the City and County of Honolulu sections it holds and shows the ones that match, with their citations. Free, no sign-in.