§ 21A-1.14 — Certification standards
Revised Ordinances of Honolulu (2026 S-11: Supplement 11, Ordinance No. 26-1 through Ordinance No. 26-18, June 30, 2026) · Revised Ordinances of Honolulu § 21A-1.14
Corpus is an independent public-information project, not the official City of City and County of Honolulu website. Stable reference: corpuslaw.us/code/f43b0abb-f60b-4ddd-9d91-7228e1aa1a9b
§ 21A-1.14 Certification standards.
Pre-construction, during-construction, and post-construction certification of elevation and floodproofing of new construction, development, and improvements within the special flood hazard areas must be submitted to the director and must be maintained as a matter of public record, in accordance with this section. (a) Pre-construction certification. Requirements for approval of the building permit must include the following items, as applicable, and any additional items as required by the director to promote public welfare and safety. (1) Certification of building plans. Each set of building plans must include a current topographic survey map prepared by a licensed surveyor and must be signed and stamped by a licensed engineer or architect certifying the accuracy of the flood boundary and elevation information. (2) Flood hazard certification. The city’s applicable flood hazard certification form (Flood Fringe, Floodway, Coastal High Hazard, or No-Impact) must be completed, signed, and stamped by a licensed engineer or architect. (3) Dry floodproofed design certification. For applicable non-residential structures, Section II of the FEMA Dry Floodproofing Certificate form must be completed, signed, and stamped by a licensed engineer or architect. (4) Certification of no-rise determination. For all construction and improvements in the floodway, the FEMA No-Rise Certification form must be completed, signed, and stamped by a licensed engineer. The director may waive the certification form requirement for improvements to an existing structure; provided that the proposal is not a substantial improvement and there is no change to the existing footprint of the structure below the design flood elevation. (5) Draft non-conversion agreement. For enclosures below an elevated new or substantially improved structure in the coastal high hazard area, the owners shall complete, sign, and notarize the document. (b) During-construction certification. Upon placement of the lowest floor, including the basement, and prior to further vertical construction of a new or substantially improved structure within special flood hazard areas, the FEMA Elevation Certificate must be completed, signed, and stamped by a licensed surveyor. (c) Post-construction certification. Prior to the closing of the building permit or issuance of a certificate of occupancy for a new or substantially improved structure in a special flood hazard area, the following documents are required, as applicable: (1) Finish-construction certification. The FEMA Elevation Certificate form must be completed, signed, and stamped by a licensed surveyor. (2) Dry floodproofed elevation and construction certifications. For applicable non-residential structures, the FEMA Dry Floodproofing Certificate form must be completed, signed, and stamped by a licensed surveyor, engineer or architect (Section III), and licensed engineer or architect (Section IV). (3) Recorded non-conversion agreement. An executed recorded copy of the non-conversion agreement, if a draft agreement was required for approval of the building permit. (1990 Code, Ch. 21A, Art. 1, § 21A-1.14) (Added by Ord. 14-9; Am. Ords. 16-30, 26-10)
Ask a question about City and County of Honolulu law
Corpus searches the City and County of Honolulu sections it holds and shows the ones that match, with their citations. Free, no sign-in.
