§ 170.70.109 — APPLICATION PROCESS:
Code of Ordinances of the City of Burlington, Iowa (Codified through Ordinance No. 3566, adopted September 8, 2026. (Supp. No. 29)) · Burlington Code of Ordinances § 170.70.109
Corpus is an independent public-information project, not the official City of Burlington website. Stable reference: corpuslaw.us/code/8409bdc9-098d-4f0f-9156-0e3538daa103
170.70.109 - APPLICATION PROCESS:
All applicants who wish to locate a communications antenna or tower on public property or private property must submit to the City's Community Development Department a completed application accompanied by a communications building permit fee. These fees may be used by the City of Burlington to engage an engineer(s) or other qualified consultant(s) to review the technical aspects of the application. In cases requiring the City to hire outside consultants, any additional reasonable and necessary costs incurred by the City of Burlington for the technical review and recommendation shall be reimbursed by the applicant prior to the final approval. The following documents, if applicable, shall be submitted for consideration prior to building permit or Special Use Permit approval: 1. One copy of typical specifications for proposed structures and antennas, including description of design characteristics and material. 2. A site plan drawn to scale showing property lines, tower location, tower height, guy wires and anchors, existing structures, photographs or elevation drawings depicting typical design of proposed structures, parking, fences, landscape plan, existing land uses on adjacent property, and the location of all underground utilities and right-of-way, provided no site plan is if the antenna is to be mounted on an approved existing structure. 3. A current map or update for an existing map on file showing locations of applicant's antennas, facilities. 4. A report from a Registered Professional Engineer practicing in structural engineering showing the tower antenna capacity by type and number, and a certification that the tower is designed to withstand winds in accordance with ANSI/EIA/TIA 222 standards latest revision, or any equivalent or replacement standards. 5. Identification of the owners or lessors of all antennas and equipment to be located on the site, and written authorization from the site owner for the application. 6. Evidence that a valid FCC license for the proposed activity has been issued, and valid FCC licensed equipment is used for the tower structure. 7. A written agreement to remove the facilities within one hundred eighty (180) days after cessation of use. 8. Additional information as required, to determine that all applicable zoning regulations are met. 9. Any communications facilities located on the roof of an antenna support structure must be set back at least one foot from the edge of the roof of the structure. This set back requirement shall not apply to: a. Communications facilities located above the roof of the structure if the facilities are appropriately screened from view through the use of panels, walls, fences or other screening techniques approved by the City. b. Camouflage antennas that are mounted to the exterior of the antenna support structures below the roof, but do not protrude more than twenty-four (24) inches from the side of such an antenna support structure. Applicant must also show evidence that all of the following conditions, where applicable, are met: 1. [Deleted by Ord. No. 3544.] 2. [Deleted by Ord. No. 3544.] 3. [Deleted by Ord. No. 3544.] 4. A new tower is designed to accommodate additional antenna equal in number to applicant's present and foreseeable future requirements. 5. All applicable health, nuisance, noise, fire, building and safety code requirements are met. 6. All tower, antennas, and communications facilities not requiring FAA painting or markings shall comply with the following camouflage design standards: a. The adverse visual impact of communication equipment shall be minimized through careful design, siting, landscape screening and innovative camouflaging techniques. Examples of camouflage techniques include, but are not limited to, architecturally screened roof-mounted antennas, antennas integrated into architectural elements, antennas designed to look other than an antenna, telecommunications towers designed to blend into the surrounding environment or to look other than a tower, such as light poles, power poles and trees. b. Antennae attached to a building shall be of a color identical to or closely compatible with the exterior wall surface of the building to which they are mounted. At a minimum, all towers not requiring FAA painting or markings shall have an exterior finish which is galvanized or painted dull blue, gray or black. Rooftop equipment shall be screened from view as required under Chapter 170.34, Architectural Design Guidelines. c. Camouflage shall be required on towers and antennas that are located within a local or national historic district. 7. [Deleted by Ord. No. 3544.] 8. A tower must be a minimum distance equal to one and one-half the height of the tower from property designated historic or architecturally significant, and must be set back from all lot lines distances equal to the district setback requirements or 25% of the tower height, whichever is greater. 9. The following landscaping requirements shall apply to all Wireless Communications Facility installations: a. New Construction - New Wireless Communications Facilities with support structures and attached Wireless Communications Facilities with new building construction shall be landscaped in accordance with the applicable provisions of the landscape ordinance. All towers shall be surrounded by a minimum six (6) foot high fence. Exterior to the fence, landscaping shall be provided around the base of the tower and corresponding equipment located at grade, in order to provide a visual barrier, to a minimum height of six (6) feet. b. Land Preservation - Existing mature tree growth and natural land form on the site shall be preserved; provided however, that vegetation that causes interference with the antennas or inhibits access to the equipment facility may be trimmed or removed. All responses to applications for siting of telecommunications towers and facilities shall be in writing and shall be made within 60 days after all application materials are received.
(Ord. No. 3544, 2-18-25)
Ask a question about Burlington law
Corpus searches the Burlington sections it holds and shows the ones that match, with their citations. Free, no sign-in.
Use the Burlington code through the API
This call searches the Burlington code. Change jurisdiction to the state's code to search its statutes and its cities, or to US for federal law. A free key gives 1,000 searches a month, and the MCP server works with no key.
curl -H "Authorization: Bearer $CORPUS_API_KEY" \
"https://corpuslaw.us/api/v1/search?q=APPLICATION+PROCESS&jurisdiction=IA-BURLINGTON"Law search API · Docs · Get a free key · Connect the MCP server