For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 20-100 — Submission required

Code of Ordinances of the City of Cedar Falls, Iowa (Codified through Ordinance No. 3140, enacted March 16, 2026. (Supp. No. 27)) · Cedar Falls Code of Ordinances § 20-100

Corpus is an independent public-information project, not the official City of Cedar Falls website. Stable reference: corpuslaw.us/code/f928d9b0-b00a-499b-a44b-58634b2f8390

Sec. 20-100. - Submission required.

(a) The subdivider shall, within two years from the date of approval of the preliminary plat, unless such time period has been extended by the city council, prepare and file with the city planner, six unsigned copies of the proposed final plat and required attachments, as set forth in this division along with at least one reproducible-size copy (no larger than 11 inches by 17 inches) of the final plat. An electronic copy of the plat in an approved AutoCAD program must also be submitted. The proposed deed of dedication or owner's statement shall be submitted along with the plat fee. Sewer tapping fees, if any, shall be submitted at the time of initial plat submittal. Except for a final plat for a minor subdivision as set forth herein, no final plat shall be considered by the city council until and unless a preliminary plat for the area included in the proposed final plat has been approved. The final plat shall be in substantial conformance with the approved preliminary plat as determined by the city engineer. Furthermore, a final plat shall not be accepted for consideration by city staff until all required construction plans and specifications for all required improvements and public infrastructure as indicated on the approved preliminary plat, including cost estimates, have been submitted and approved by the city engineer. In addition a written environmental report shall be submitted and approved by the city engineer prior to final plat submittal. Lien waivers and mortgage releases of all interested parties shall be provided to the city prior to final plat approval. (b) The subdivider may file with the city planner a proposed final plat of only a portion of an approved preliminary plat, if said final plat phase can function as a separate development, including, but not limited to, adequate street access, stormwater management and utilities, and if no essential public infrastructure extensions are delayed. All submittals and information for final plats shall be required. Such phased submissions shall follow the phasing plan submitted and approved with the preliminary plat, unless, based on the conditions present at the time of submittal of the proposed final plat, the city determines that alternate phasing of a subdivision is necessary to ensure the standards of this paragraph are met and to ensure timely extension and connection of essential infrastructure. Whether or not said infrastructure is essential in nature shall be determined by the city.

(Code 2017, § 24-38; Ord. No. 2724, § 1, 12-13-2010; Ord. No. 2980, § 2, 1-19-2021)

Ask a question about Cedar Falls law

Corpus searches the Cedar Falls sections it holds and shows the ones that match, with their citations. Free, no sign-in.