For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 20-126 — Soil erosion control plans

Code of Ordinances of the City of Cedar Falls, Iowa (Codified through Ordinance No. 3140, enacted March 16, 2026. (Supp. No. 27)) · Cedar Falls Code of Ordinances § 20-126

Corpus is an independent public-information project, not the official City of Cedar Falls website. Stable reference: corpuslaw.us/code/7fe00205-81ed-4b7e-bc27-0934d06e5d7b

Sec. 20-126. - Soil erosion control plans.

Following preliminary plat approval, the subdivider shall not begin the installation and construction of said necessary improvements until an erosion control plan is submitted and approved by the city engineer. The erosion control plan shall strive to limit soil erosion from natural forces such as wind and rain and control stormwater runoff rates during the course of construction of public improvements. Requirements outlined in chapter 24 must be adhered to. Dust control measures shall be employed during all phases of construction. Appropriate soil erosion control measures, as specified by the city engineer, shall be installed before on site construction begins.

(Code 2017, § 24-55; Ord. No. 2724, § 1, 12-13-2010)

Ask a question about Cedar Falls law

Corpus searches the Cedar Falls sections it holds and shows the ones that match, with their citations. Free, no sign-in.