For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 20-5 — Improvements

Code of Ordinances of the City of Cedar Falls, Iowa (Codified through Ordinance No. 3140, enacted March 16, 2026. (Supp. No. 27)) · Cedar Falls Code of Ordinances § 20-5

Corpus is an independent public-information project, not the official City of Cedar Falls website. Stable reference: corpuslaw.us/code/2c0ec53a-eab2-4712-af10-936d4ed2f18a

Sec. 20-5. - Improvements.

(a) Required. The owner shall, at the owner's expense, install and construct all improvements required by this chapter. All required improvements shall be installed and constructed in accordance with the design standards established for such improvements by the city and Cedar Falls Utilities (CFU) and as shown on the approved preliminary plat. (b) Inspection. All improvements shall be inspected to ensure compliance with the requirements of this chapter. The cost of such inspection shall be borne by the subdivider, and shall be the actual cost of the inspection to the city. (c) Minimum improvements. The improvements set forth below for all proposed subdivision plats shall be considered the minimum improvements necessary to protect the public health, safety and welfare. (1) Streets. a. The owner of land being platted/subdivided shall provide the grading of the entire street right-of-way, alley or public place and provide appropriate paving, including curb and gutter on all streets. All streets or alleys shall be of such width and shall be so constructed as to meet the standards of the city (and be in compliance with state law). If any street is established with boulevards or divided lanes that incorporate natural landscaping, private entry signs or other optional decorative components desired by the subdivider, said street must be established with adequate provision for future maintenance of said landscaped area and other private components by the subdivider or property owners' association within the subdivision plat area unless the city agrees to assume maintenance responsibilities. These provisions relating to boulevard establishment and maintenance must be outlined in the subdivision deed of dedication or statement of restrictions and shall be subject to approval by the city council. b. Under appropriate circumstances the city may require, as a condition for approval of the plat, dedication and improvement of a street having a width greater than necessary to meet the needs of the platted area, but necessary to complete the city street system as it relates to both the area being platted and other areas. In such event, the city shall pay the subdivider the difference in cost of improving the wider street and the street width reasonable to meet the foreseeable needs of the subdivision taken alone. The streets shall, upon final approval by the city engineer and acceptance by the city, become the property of the city. In order to provide a continuous street system that will serve adjacent properties in the future, all streets shall be constructed to the outer or perimeter boundary of the plat area to allow for the future extension of said street to adjacent properties. An adequate turn-around area at the end of said streets as determined by the city engineer, must be provided and maintained by the subdivider until a connecting street is improved, dedicated and accepted by the city council. A waiver of the requirement of street construction to the outer boundary of the plat area may be granted by the city council in consideration of special circumstances upon the recommendation of the city engineer. In such cases of waiver, adequate easements must be provided in anticipation of future street extension. (2) Sanitary sewer system. a. The owner of the land being platted shall make adequate provision for the disposal of sanitary sewage from the platted area with due regard being given to present or reasonably foreseeable needs. There shall be constructed, at the subdivider's expense, a sanitary sewer system including all necessary pumping stations, pumping equipment, manholes, and all other necessary or desirable appurtenances to provide for the discharge of sanitary sewage from all lots or parcels of land within the platted area to a connection with the city's sanitary sewer system. The sanitary sewer system shall be constructed in accordance with the plans and specifications of the city and at the sewer grades as established by the subdivider's engineer and reviewed and approved by city staff. In order to provide for the future extension of sanitary sewer service to adjacent properties, the sanitary sewer system shall be installed and constructed to the outer or perimeter boundaries of the proposed subdivision area. A waiver of the requirement of sanitary sewer construction to the outer boundary of the plat area may be granted by the city council in consideration of special circumstances upon the recommendation of the city engineer. In such cases of waiver, adequate easements must be provided in anticipation of future sewer extension. The developer shall pay any sanitary sewer tapping fees that may be required by the city. Said tapping fees must be paid at the time of final plat approval by the city council. b. Under appropriate circumstances the city may require, as a condition for approval of the plat, installation of a sanitary sewer that is larger than necessary to meet the needs of the platted area, but necessary to complete the city sanitary sewer system as it relates to both the area being platted and other areas. In such event the city shall pay the subdivider the difference in cost of the pipe and installation between the sewer required for the subdivision plat and the larger sewer structure necessary to serve the larger area beyond the boundaries of the plat. The above-mentioned facilities for the collection and disposal of sanitary sewage from the platted area shall, upon final approval and acceptance by the city, become the property of the city and shall be established within the public street right-of-way or within public easements of sufficient width to allow adequate access for future maintenance, repair and reconstruction of said facilities, including excavation. (3) Storm sewer system. The owner of land being platted shall install and construct a storm sewer system adequate to serve the plat area. The storm sewer system shall be extended to the outer or perimeter boundaries of the proposed subdivision plat area for the purpose of future extension to adjacent properties. A waiver of the requirement of storm sewer construction to the outer boundary of the plat area may be granted by the city council in consideration of special circumstances upon the recommendation of the city engineer. In such cases of waiver, adequate easements must be provided in anticipation of future sewer extension. a. Under appropriate circumstances the city may require, as a condition for approval of the plat, installation of a storm sewer system that is larger than necessary to meet the needs of the platted area, but necessary to complete the city storm sewer system as it relates to both the area being platted and other areas. In such event, the city will pay the subdivider the difference in cost of the pipe and installation between the sewer required for the subdivision plat and the larger sewer structure necessary to serve the larger area beyond the boundaries of the plat. b. The sewers shall, upon inspection, approval, and acceptance by the city, become the property of the city and said sewers shall be established within the public street right-of-way or within public easements of sufficient width to allow adequate access for future maintenance, repair and reconstruction of said facilities, including excavation. In the storm sewer design phase, consideration shall be given to alternatives and principles of stormwater management, such as "conservation design principles" or in conformance with the provisions of a stormwater management plan if such plan has been adopted by the city. (4) Stormwater management. All requirements outlined in this Code relating to stormwater management, illicit discharges and erosion control, or any similar provisions (chapter 24) shall be followed in accordance with city engineering division specifications. (5) Water distribution system. The owner of land being platted shall install and construct a water main distribution system in accordance with the service policy of the municipal water utility of the city to adequately serve all lots or parcels of land within the platted area, with due regard to the present and reasonably foreseeable needs of the entire area including extension of said water distribution system to the outer or perimeter boundaries of the proposed subdivision plat area for the purpose of future extension to adjacent properties, and shall connect the same to the existing municipal water distribution system. Extension of the water main/distribution system to the outer boundary of the subdivision plat may be waived by the city council and Cedar Falls Utilities upon recommendation by the city engineer. In such cases of waiver, adequate easements must be provided in anticipation of future water line extension. a. The water mains/distribution system and service stubs or service conduits shall be constructed in accordance with specifications of the municipal water utility of the city. The subdivider or subdivider's engineer shall apply for a construction permit, submitting reproducible copies of the required state department of natural resources forms and appropriate schedules and water system construction plans for review by the municipal water utility of the city. b. The owner shall construct the water system extension according to requirements of the municipal water utility of the city and provide the required bonds and insurance documents to the city. Upon final approval and acceptance by the municipal water utility of the city the water mains shall become the property of the municipal water utility of the city. Said water system lines and facilities shall be established within public street right-of-way or public easements of sufficient width to allow adequate access for future maintenance, repair and reconstruction of said facilities, including excavation. (6) Electric distribution system. Underground electric facilities shall be installed by the municipal electric utility of the city to all newly platted residential subdivisions in accordance with the electric service policy of the municipal electric utility of the city. a. The owner of the land being platted shall submit a plan of the proposed subdivision to the municipal electric utility of the city. The municipal electric utility shall design and request easements to accommodate electric facilities in the newly platted subdivision. All said public easements shall be established of sufficient width to allow for adequate access for future maintenance, repair and reconstruction of said facilities, including excavation. Said electric facilities shall be extended to the outer perimeter or boundary of the subdivision plat area unless a waiver of said extension is granted by the municipal electric utility of the city and the city. In such cases of waiver of extension, adequate easements must be provided in anticipation of future electric line extensions. b. Requests for unusual underground electric facilities shall be evaluated on an individual basis. For these unusual cases, an allowance of three years base revenues shall be made by the municipal electric utility to cover installation of electric facilities with the balance of the estimated extension cost to be paid in advance by the owner/subdivider. At the end of the three years the owner/subdivider may request a review of the actual cost of the extension and the actual base revenue for three years. (7) Street lighting. Street lighting for newly platted subdivisions shall normally be designed and installed by the municipal electric utility of the city with the approval of the engineering division of the city. All lighting system costs shall be borne and paid for by the owner. Allowable street lighting fixtures shall be determined by the municipal electric utility. Any unusual request for street lights other than the standard fixture and pole shall be at the customer/developer expense and approved by the municipal electric utility of the city of and the city. (8) Communication systems. The owner of the land being platted shall submit a plan of the proposed subdivision to all authorized communication network providers in the area. These providers include private service providers and the municipal communication utility of the city. All communication facilities established within a subdivision shall utilize a common trench area as designed and constructed by city utilities personnel and the city engineer. Public easements must be established of sufficient width necessary to accommodate the installation and excavation/repair of all communication facilities in the newly platted subdivision. (9) Natural gas distribution system. Natural gas service shall be made available to the land being platted in accordance with the service policy of the municipal gas utility of the city. The subdivider of land being platted shall apply for natural gas service, submitting a plan of the proposed subdivision to the municipal gas utility of the city. The owner and the municipal gas utility of the city shall install a natural gas distribution system in accordance with the service policy of the municipal gas utility of the city. The natural gas distribution system is the property of the municipal gas utility of the city. Said natural gas system lines and facilities shall be established within the public street right-of-way or within public easements of sufficient width to allow adequate access for future maintenance, repair and reconstruction of said facilities, including excavation. Said natural gas lines must be extended to the outer perimeter or boundary of the subdivision plat area unless a waiver of said extension is granted by the municipal gas utility of the city and the city council upon the recommendation of the city engineer. In such cases of waiver, adequate easements must be provided in anticipation of future water line extension. (10) Other improvements. The owner of the land being platted shall be responsible for the installation of sidewalks within the public right-of-way, grading, seeding or sodding of all lots, the planting of any required trees in the parking areas and the installation of street signs and other public appurtenances such as traffic signals, medians, turn lanes, extension of existing turn lanes, etc., as required by the city engineer. All such improvements shall be constructed under the direction of the appropriate city authority. Public sidewalks shall be installed at the time of new building construction on new or recently platted lots or within five years following final subdivision approval. The required width of the sidewalk shall be determined by the city engineer. Sidewalks must also be installed at the time of new home construction adjacent to abutting streets outside of the subdivision if lots within the subdivision abut the adjacent street right-of-way. After five years following final subdivision approval the owners of any undeveloped lots or properties adjacent to public right-of-way areas where public sidewalks are required, shall install the required sidewalk to city specifications upon notification by the city engineering division. In those cases where a property owner is unable or unwilling to install said required sidewalk the city council may contract the work to be completed and assess the cost for said sidewalk installation to said property owner. Future maintenance of all such sidewalks will be the responsibility of the owner of the private property abutting said public sidewalk in conformance with chapter 19. In appropriate circumstances the city may require the installation of a sidewalk wider than 48 inches. In these cases the city may pay for the "over-size" difference in cost between the typical sidewalk width (i.e., 48 inches width) and the enlarged sidewalk width. (11) Public accessways, walkways or sidewalks. In appropriate circumstances public accessways, walkways or sidewalks shall be required to be installed by the owner across private land for purposes of providing access to nearby subdivisions, schools, recreation trails, parks, open green space areas or other facilities where public access is judged to be necessary. The required width of said walkway or accessway shall be determined by the city engineer. In these cases the subdivider shall be required to provide public access easements of sufficient width to allow installation and maintenance of said pedestrian accessways. The subdivider shall be required to install said pedestrian accessways in conjunction with the installation of other required public infrastructure facilities and improvements in the subdivision in conjunction with final plat approval. The owner or property owners' association within the subdivision shall be responsible for future maintenance of said pedestrian accessways. In cases of doubt regarding responsibility or maintenance, the immediately abutting property owners shall be responsible for maintenance of said walkways, accessways or sidewalks. In appropriate circumstances a delay in pedestrian accessway or sidewalk installation may be appropriate beyond the time needed to construct and install other required public infrastructure and shall be subject to a special agreement between the subdivider and the city with respect to timing of installation of said walkways, access ways or sidewalks. (12) Public recreation trails. In those cases where the city trails plan illustrates the need for the establishment of a public recreation trail that may pass through or upon the proposed subdivision plat, the subdivider shall be required to provide adequate access easements for the establishment of said trail area in conformance with city engineering specifications. The required width of all such trails shall be determined by the city engineer. Recreation trail installation costs shall be shared between the owner and city with an approved agreement upon recommendation by the city engineer. In those cases where a public recreation trail is indicated on the city trails plan in a location where a typical city sidewalk is to be installed (i.e., in the adjacent public right-of-way), the owner shall be responsible for installing the recreation trail in lieu of the typical public sidewalk in that location with the provision that the city shall pay for the difference in the cost of a typical sidewalk section (i.e., 48 inches width) compared to the cost of the trail section. Public recreation trail installation shall normally be completed in conjunction with the installation of other required public infrastructure improvements in conjunction with final plat approval. In appropriate circumstances a delay in trail installation may be appropriate and such delay beyond the time frame for installation of other required public infrastructure shall be subject to a special agreement between the owner and the city. (13) Parkland. The owner of the land being platted or developed shall grade, seed, and establish measures to control erosion on land to be dedicated for parkland; shall be responsible for utility connections; shall be responsible for construction of a public sidewalk along the street frontage of the land to be dedicated; and shall construct through-block sidewalks to the parkland to provide more direct routes to the park for area residents, all as deemed necessary by the city. (d) Easements required. Easements shall be established when specified by city officials including city utilities personnel for purposes of providing access to or use of various public facilities including, but not limited to, municipal utilities, sewers, drainageways, trails, public access ways or any other such designated easement areas. All said easements shall remain open without any obstruction, and no building structures of any kind, whether permanent, temporary or portable, shall be permitted within said easement areas. All easement areas shall be free of building obstructions and made accessible in order to allow ease of entry and permit repair and maintenance activities as needed within said easement area. Property line fences, landscaping materials or driveways may be installed in said easement areas upon condition that all said components or obstructions shall be removed at the expense of the property owner in case of repair, maintenance, installation or excavation in the easement area. All required easements shall be clearly shown and labeled on subdivision plats and described further within the subdivision owner's statement of deed of dedication using standard easement provision language as specified by city officials. (1) Public utilities. Where alleys are not provided, or where otherwise required by the present or future placement of public utilities, utility easements of not less than ten feet in width shall be granted by the owner along rear, and where necessary, along front or side lot lines for public utility requirements. Except where prohibited by topography, such easements shall be centered on lot lines. Easements of greater width may be required along lot lines, or across lots when necessary for the placement and maintenance of utilities. No buildings or structures, except as necessary for utilities, shall be permitted on such easements. (2) Easements along streams and watercourses. Wherever any stream or surface watercourse is located in an area that is being subdivided, the subdivider shall, at the subdivider's own expense, make adequate provisions for the proper drainage of surface water and shall provide and dedicate to the city an easement along said stream or watercourse as necessary for the proper maintenance of the watercourse, as recommended by the city engineer. All said drainage easements must be kept free of any obstruction including landscaping features, fences, berms, re-grading or similar activities that alter or change the drainage patterns through the easement area. (e) Maintenance bond required. The owner of the land being platted shall be required to provide to the city property maintenance bonds satisfactory to the city, so as to ensure that for a period of three years from the date of acceptance of any required public improvement the owner shall be responsible to maintain all such improvements in good repair. In those situations where repairs of certain infrastructure are necessary within the three-year bonding period, the city engineer shall determine whether a new maintenance bond shall be established by the owner for an additional three-year period following reconstruction/repair of said infrastructure. This additional bonding period shall be established only for the portion of failed infrastructure which has been repaired. (f) Temporary construction access. Temporary construction access roads may be required, as determined by the city engineer, to prevent construction vehicles necessary for the installation of subdivision improvements from traversing existing streets. The intent of this requirement is to prevent damage to existing streets and to prevent noise, dust, construction debris, and excess traffic impacts to surrounding neighborhoods during construction.

(Code 2017, § 24-5; Ord. No. 2724, § 1, 12-13-2010; Ord. No. 3109, § 3, 5-19-2025; Ord. No. 3133, § 3, 12-1-2025)

Ask a question about Cedar Falls law

Corpus searches the Cedar Falls sections it holds and shows the ones that match, with their citations. Free, no sign-in.