§ 24-92 — Wastewater discharge permits
Code of Ordinances of the City of Cedar Falls, Iowa (Codified through Ordinance No. 3140, enacted March 16, 2026. (Supp. No. 27)) · Cedar Falls Code of Ordinances § 24-92
Corpus is an independent public-information project, not the official City of Cedar Falls website. Stable reference: corpuslaw.us/code/81fb64cf-d5ba-44de-8edc-e0bfae270830
Sec. 24-92. - Wastewater discharge permits.
(a) Notification. Upon request by the superintendent, industrial users shall provide information deemed necessary by the superintendent to determine if an industrial wastewater discharge permit is required. The superintendent shall be given notice prior to making any changes in an industrial user's operations that may change its wastewater discharge characteristics. (b) General permits. All significant industrial users proposing to connect to the POTW shall obtain a wastewater discharge permit before connecting to or contributing to the POTW. Each individual building sewer of a significant industrial user must have a wastewater discharge permit. Proposed new industrial users must obtain such permit prior to connecting or contributing to the POTW. (c) Permit application. Industrial users required to obtain a wastewater discharge permit shall complete and file with the superintendent an application, in the form prescribed by the superintendent, and accompanied by the appropriate fee. Proposed new industrial users shall apply for an industrial wastewater discharge permit at least 90 days prior to connecting to or contributing to the POTW. In support of the application, the industrial user shall submit, in units and term appropriate for evaluation, the following information: (1) Name, address and location (if different from the address), and the authorized representative; (2) Primary SIC number according to the Standard Industrial Classifications Manual, Bureau of the Budget, 1972, as amended; (3) a. Wastewater constituents and characteristics including, but not limited to, those mentioned in this division 2 as determined by a reliable analytical laboratory; sampling and analysis shall be performed in accordance with procedures established by the EPA pursuant to section 304(g) of the Act and contained in 40 CFR 136, as amended; b. Where 40 CFR 136 does not include a sampling or analytical technique for the pollutant in question, sampling and analysis shall be performed in accordance with the procedures set forth in the EPA publication, Sampling and Analysis Procedures for Screening of Industrial Effluents for Priority Pollutants, April 1977, and amendments thereto, or with any other sampling and analytical procedures approved by the EPA; (4) Time and duration of contribution; (5) Average daily and estimated peak wastewater flow rates, including daily, monthly and seasonal variations if any; (6) Show all sewers, sewer connections, testing places and provide site plans, floor plans, mechanical and plumbing plans when available. (7) General description of activities which may be discharged to POTW; (8) Where known, the nature and concentration of any pollutants in the discharge which are limited by any federal or categorical pretreatment standards, and a statement reviewed by an authorized representative of the industrial user certified to by a qualified professional indicating whether or not the pretreatment standards are being met on a consistent basis and if not, whether additional operation and maintenance and/or additional pretreatment is required for the industrial user to meet applicable pretreatment standards; (9) If additional pretreatment and/or operation and maintenance will be required to meet the pretreatment standards, the schedule by which the industrial user will provide such additional pretreatment. The completion date in this schedule for categorical pretreatment standards shall not be later than the compliance date established for applicable pretreatment standards. The following conditions shall apply to the schedule: a. The schedule shall contain increments of progress in the form of dates for the commencement and completion of major events leading to the construction and operation of additional pretreatment required for the user to meet the applicable pretreatment standards (e.g., hiring an engineer, completing preliminary plans, completing final plans, executing contract for major components, commencing construction, completing construction, etc.); b. The schedule shall be submitted to the superintendent for approval; c. Not later than 14 days following each date in the schedule and the final date for compliance, the user shall submit a progress report to the superintendent or his designee including, as a minimum, whether or not it complied with the increments of progress to be met on such date and, if not, the date on which it expects to comply with this increment of progress, the reason for delay, and the steps being taken by the user to return the construction to the schedule established. In no event shall more than six months elapse between such progress reports to the superintendent or his designee; (10) Each product produced by type, and amount; (11) Number and type of employees, and hours of operation of plant and proposed or actual hours of operation of pretreatment system; (12) Any other information as may be deemed by the superintendent to be necessary to evaluate the permit application. (d) Permit issuance. The superintendent will evaluate the data furnished by the industrial user and may require additional information. After evaluation and acceptance of the data furnished, the superintendent may issue a wastewater discharge permit subject to terms and conditions provided herein. (e) Permit modifications relative to categorical standards. As soon as possible, preferably within 90 days, after the promulgation of a federal categorical pretreatment standard, the wastewater discharge permit of the industrial users subject to such standards shall be revised to require compliance with such standard within the time frame prescribed by such standard. Where an industrial user, subject to a federal categorical pretreatment standard, has not previously submitted an application for a wastewater discharge permit as required by subsection (c) of this section, the industrial user shall apply for a wastewater discharge permit within 90 days after the promulgation of the applicable federal categorical pretreatment standard. (f) Permit conditions. Wastewater discharge permits shall be expressly subject to all provisions of this division and all other applicable regulations, industrial user charges, and fees established by the city. Permits may contain the following as determined by the superintendent: (1) The unit charge or schedule of charges and fees for the wastewater to be discharged to the POTW; (2) Limits on the average and maximum wastewater constituents and characteristics; (3) Limits on average and maximum rate and time of discharge or requirements for flow regulations and equalization; (4) Requirements for installation and maintenance of inspection and sampling facilities; (5) Specifications for monitoring programs which may include sampling locations, frequency of sampling, number, types and standards for tests and reporting schedule; (6) Compliance schedules; (7) Requirements for submission of technical reports or discharge reports (See section 24-94.); (8) Requirements for maintaining and retaining plant records relating to wastewater discharge as specified by the city, and affording city access thereto; (9) Requirements for notification of the superintendent of any new introduction of wastewater constituents or any substantial change in the volume or character of the wastewater constituents being introduced into the POTW; (10) Requirements for notification of accidental discharges as per section 24-87; (11) Other conditions as deemed appropriate by the superintendent to ensure compliance with this division. (g) Permit duration. Permits shall be renewable as directed by the superintendent for a specified time period, not to exceed three years. Permits may be issued to expire on a specific date. The industrial user shall apply for permit reissuance a minimum of 90 days prior to the expiration of the user's permit. In the event that an application for permit reissuance was submitted and a new permit has not been issued at the time the existing permit expires, the existing permit expiration date will automatically extend until a new permit is issued. (h) Permit transfer. Wastewater discharge permits are issued to a specific operation. A wastewater discharge permit shall not be reassigned or transferred or sold to a new owner, new user, different premises, or a new or changed operation without the approval of the city. Any succeeding owner or user shall also comply with the terms and conditions of the existing permit. (i) Permit modification or revocation. Permits may be modified, revoked and reissued, or terminated for good causes including, but not limited to, the following: (1) To incorporate any new or revised federal, state, or local pretreatment standards or requirements; (2) Material or substantial alterations or additions to the user's operation are made which are not covered in the effective permit; (3) Failure of the industrial user to report significant changes in wastewater constituents and characteristics; (4) A change in any condition that requires either a temporary or permanent reduction or elimination of the authorized discharge; (5) Information indicating that the permitted discharge poses a threat to the POTW, city personnel or the receiving waters; (6) Violation of any terms or conditions of the user's wastewater discharge permit; (7) It is found that the industrial user's wastewater discharge permit was obtained by misrepresentation or failure to disclose fully all relevant facts; (8) Refusal of reasonable access to the industrial user's premises for the purpose of inspection or monitoring; or (9) Upon request of the permittee (industrial user), provided such request does not create a violation of any existing policy, applicable requirements, standards, laws, or rules and regulations. The filing of a request by a permittee (industrial user) for a permit modification, revocation and reissuance, or termination, or a notification of planned changes or anticipated noncompliance, does not stay any permit condition. The industrial user shall be informed of any proposed changes in his permit at least 30 days prior to the effective date of the change. Any changes or new conditions in the permit shall include a reasonable time schedule for compliance. (j) Permit violations. If sampling performed by the industrial user indicates a violation, the industrial user shall notify the superintendent within 24 hours of becoming aware of the violation. The industrial user shall also repeat the sampling and analysis and submit the results of the repeat analysis to the superintendent within 30 days after becoming aware of the violation, except the industrial user is not required to resample if: (1) The control authority performs sampling of the industrial user's discharge at a frequency of at least once per month. (2) The control authority performs sampling of the industrial user's discharge between the time when the user performed its initial sampling and the time when the user receives the results of the initial sampling. (3) The violation was the result of an infrequent batch discharge that occurs less frequently than once every 30 days and a repeat sampling would be of no value in confirming the nature or degree of the original violation.
(Code 2017, § 27-70; Ord. No. 2702, § 1, 1-25-2010)
Ask a question about Cedar Falls law
Corpus searches the Cedar Falls sections it holds and shows the ones that match, with their citations. Free, no sign-in.