§ 26-138 — Wind energy facilities
Code of Ordinances of the City of Cedar Falls, Iowa (Codified through Ordinance No. 3140, enacted March 16, 2026. (Supp. No. 27)) · Cedar Falls Code of Ordinances § 26-138
Corpus is an independent public-information project, not the official City of Cedar Falls website. Stable reference: corpuslaw.us/code/7ca14b11-3243-4079-aef8-302f4f3ab944
Sec. 26-138. - Wind energy facilities.
(a) Applicability. (1) The requirements of this section shall apply to all wind energy facilities (large and small) for which an application for a special permit or building permit has been submitted to the city after the effective date of the ordinance from which this section is derived. (2) Wind energy facilities for which a required permit has been properly issued prior to the effective date of the ordinance from which this section is derived shall not be required to meet the requirements of this section; provided, however, that any such preexisting wind energy facility which is discontinued or does not provide energy for a continuous period of 12 months shall meet the requirements of this section prior to recommencing production of energy. However, no modification or alteration to an existing wind energy facility shall be allowed unless in compliance with this section. (b) Purpose. The purpose of this section is to provide a regulatory means for controlling the construction and operation of large and small wind energy facilities in the city, with the use of reasonable restrictions, which will preserve the public health, safety, and welfare. The city adopts these provisions to promote the effective and efficient use of the city's wind energy resource. (c) Findings. The city council finds and declares that: (1) Wind energy is an abundant, renewable and nonpolluting energy resource for the city and its conversion to electricity may reduce dependence on nonrenewable energy sources and decrease the air and water pollution that results from the use of conventional energy sources. (2) The generation of electricity from properly sited wind energy facilities can be cost effective and can reduce consumption of traditional energy sources and in many cases existing power distribution systems can be used to transmit electricity from wind-generating systems to utilities or other electric power users. (3) Regulation of the siting and installation of wind energy facilities is necessary for the purpose of protecting the health, safety, and welfare of neighboring property owners and the general public. (4) Wind energy facilities represent significant potential aesthetic and environmental impacts because of their potential size, lighting, noise generation, ice shedding and shadow "flicker" effects, if not properly sited and planned. (5) If not properly sited, wind energy facilities may present risks to the property values of adjoining property owners. (6) Without proper planning, construction of large wind energy facilities can create traffic problems and damage local roads. (7) If not properly sited, wind energy facilities can interfere with various types of communications or otherwise interfere with electromagnetic waves. (d) Definitions. The following words, terms and phrases, when used in this section, shall have the meanings ascribed to them in this subsection, except where the context clearly indicates a different meaning: Decommissioning means the process of use termination and removal of all or part of a large or small wind energy facility by the owner of the wind energy facility. FAA means the Federal Aviation Administration. Facility owner means the property owner, entity or entities having an equity interest in the wind energy facility. FCC means the Federal Communications Commission. Hub height, when referring to a wind turbine, means the distance measured from ground level to the center of the turbine hub. MET tower means a meteorological tower used for the measurement of wind speed. Site means the parcel of land where a wind energy facility is to be placed. The site can be publicly or privately owned by an individual or group of individuals controlling single or adjacent properties. Where multiple lots are in joint ownership or control, the combined lots shall be considered as one for purposes of applying setback requirements. Total height means, when referring to a wind energy facility, the distance measured from ground level to the windmill blade or similar wind-capture device mounted on the facility extended at its highest point. Use termination means the point in time at which a wind energy facility owner provides notice to the city that the wind energy facility is no longer used to produce electricity unless due to a temporary shutdown for repairs. Such notice of use termination shall occur no less than 30 days after actual use termination. Wind energy facility, large, means a facility that includes a tower structure, wind turbine and other related fixtures and facilities that generates electricity or performs other work consisting of one or more wind turbines under common ownership or operating control, and includes substations, MET towers, cables/wires and other buildings accessory to such facility, whose main purpose is to supply electricity to off-site customers. The power output of such facility shall exceed 100 kilowatts (kw). It also includes any wind energy facility not falling under the definition of a small wind energy facility. Wind energy facility, small, means a facility that may include a tower structure, wind turbine and other related fixtures and facilities that generates electricity or performs other work, has a total height of 120 feet or less or is affixed to an existing structure, has a power output rated capacity of 100 kilowatts (kw) or less, and is intended to primarily reduce the on-site consumption of electricity of the principal use on the property. Small wind energy systems may include roof-mounted facilities. Any wind energy facilities not falling under this definition shall be deemed large wind energy facilities. Wind farm means two or more large wind energy facilities under common ownership or control. Wind turbine means a wind energy conversion system which converts wind energy into electricity through the use of a wind turbine generator, and includes the turbine, blade, or other wind-capturing device, tower, base, and pad. Turbines may be of a horizontal or vertical design. (e) Regulatory framework. (1) Large wind energy facilities exceeding 120 feet in overall tower height and not to exceed 250 feet in overall tower height may only be constructed in areas that are zoned A1 Agricultural District, M-1 Light Industrial, M-P Planned Industrial or M-2 Heavy Industrial Districts subject to review and approval of a special exception permit by the city planning and zoning commission and city council. (2) Small wind energy facilities that are less than 120 feet in overall height and generate less than 100 kw of power may be constructed in any C commercial district or planned commercial district or within mixed use residential districts as either a principal or accessory use subject to approval of a special exception permit by the planning and zoning commission and the city council. Taller tower structures, not to exceed 150 feet in overall height, may be allowed in C commercial districts, planned commercial districts or within mixed use residential districts subject to careful review of special conditions and circumstances that justify increased tower structure height by the commission and city council. Taller tower structures allowed within mixed use residential districts or within larger multiple unit residential development areas shall be established for the benefit of multiple users, dwellings or businesses within the facility project area. More than one wind energy facility may be considered with larger commercial or residential development projects. (3) Small wind energy facilities intended for use in R residential districts shall be guided by the recommendation that wind energy facilities or tower structures should generally conform to the maximum height limits in that residential district, but shall not exceed 60 feet in overall height. The commission may recommend and the city council may consider allowance of taller tower structures up to 80 feet in height in special circumstances where the natural topography of the property under consideration is substantially lower than the natural topography of immediately abutting properties. The presence of taller trees or buildings on or near the property under consideration shall not be sufficient justification for a taller tower structure. A single tower structure will be permitted for each single residential property. Additional wind-generating mechanisms may be permitted, such as roof-mounted mechanisms on individual residential properties where a tower structure already exists. However, the roof-mounted mechanisms may not extend more than 15 feet above the height of the residential structure in all cases. (4) Roof-mounted wind energy systems shall be permitted in all districts. It is anticipated that these types of systems will be designed for smaller scale, single-site power generating applications. Roof-mounted systems must be reviewed and approved in the same fashion as tower-mounted wind energy system proposals. Setback requirements for roof-mounted systems may be less than the setback required for tower structures; however, an analysis of the height of the mechanism along with considerations of "ice-throw" distances will establish a safe setback distance for roof-mounted mechanisms. (5) Application for a special exception permit for a large or small wind energy facility including tower structures or roof-mounted structures shall be submitted with the following information: a. A signed petition by the property owner detailing the request for one or more large or small wind energy system on a single property including address and legal description of the property, name of the managing company or interest in the wind energy facility and general description of the proposed facility or tower or roof-mounted facility, such as number of tower structures, number of energy-generating turbines, height of the proposed tower structure, general characteristics, etc. Any related lease agreement with an outside party relating to establishment or maintenance of the wind energy facility must also be submitted with the name and address of the leasing party clearly presented. A proposed time line for installation and operation of the proposed system must be described. b. A signed statement indicating that the applicant or leasing party has legal authority to construct, operate, and develop the wind energy facilities under state, federal and local laws and regulations, including Federal Aviation Administration (FAA), Federal Communications Commission (FCC), and state and local building codes. c. A description of the number and kind of wind energy facilities to be installed along with a description of the key structural components such as type of tower structure with illustrations provided. In addition, any proposed accessory structures to be installed in conjunction with the wind energy system need to be described with illustrations and description of building materials and building design. d. Submittal of a professionally prepared detailed site plan illustrating the specific location of the proposed wind energy facilities or tower structure, showing property boundaries, existing utility easements or other types of easements across the property, topography of the site at two-feet increments, proposed setbacks from the property boundary and also showing all other structures and facilities on the property including other accessory structures, parking lots and nearby streets. Multiple wind energy facilities, if part of an overall project plan, may be portrayed on the submitted site plan with a "phasing plan" clearly delineated. The proposed wind energy facility must not eliminate or interfere with any on-site parking stalls or driveway access to parking areas on the property. In addition, properties within 200 feet of the property where the wind energy facilities or tower structures are to be located need to be illustrated with names and addresses of all property owners of those properties shown on the site plan application. The site plan must also illustrate all structures on abutting properties and the distance between those structures and the proposed wind energy facilities or tower structure. Nearby streets and roadways, including the entire public right-of-way located closest to the proposed wind energy facility also needs to be clearly illustrated. All aboveground utility structures, including, but not limited to, overhead electric lines need to be illustrated on the site plan. e. A diagram illustrating the potential "fall zone" (i.e., in the event of catastrophic collapse of the tower structure of the wind energy system and/or tower structures with property boundaries, building structures and public rights-of-way clearly illustrated within the potential "fall zone." f. A diagram illustrating the estimation of "ice throw" distances that can be anticipated from the wind energy facility during operation. g. A diagram illustrating anticipated prevailing wind directions and how those prevailing winds will serve the proposed wind energy system. Trees, building structures or other impediments to prevailing wind flows on or off the property must be delineated. No off site trees, hills, structures, or other facilities not located on the property under review may be trimmed, graded, altered or removed to benefit the wind circulation serving the proposed wind energy facility without approval from the city council and the owner of the off-site property. h. A description of the large or small wind energy facility's height and design, including cross sections, elevation, and diagram of how the wind energy facility will be anchored to the ground or structures, prepared by a professional engineer licensed in the state. A description of the facility's function must also be described (i.e., whether a horizontal or vertical turbine) and general direction of rotation with a description of anticipated noise generation by a properly maintained mechanism. An illustration of ice shedding or "ice throw" areas and any affected building structures or nearby properties also need to be clearly illustrated by a professional engineer. i. A statement from the applicant that all wind energy facilities will be installed in compliance with manufacturer's specifications, and a copy of those manufacturer's specifications must be provided with particular attention to wind load capacity and other details regarding structural integrity. Other details relating to matters such as "ice throw" distances, shadow "flicker" or noise generation must also be provided. j. A signed statement from the landowner of the site stating that he will abide by all applicable terms and conditions of this section particularly with respect to responsibility for proper maintenance of the wind energy facility and responsibility for removal of the wind energy facility including tower structure in the event of severe damage, disuse or abandonment. k. A statement indicating what hazardous materials will be used or stored on the site in conjunction with the wind energy facility or tower structure or its operation. l. A statement indicating how the wind energy facility will be illuminated, if applicable, with demonstration that any such required illumination will not affect nearby properties. Illumination of or on wind energy systems or tower structures shall be prohibited unless required by the FCC or FAA. m. A statement by an appropriate authority with regard to any potential electromagnetic interference with radio, television or cellular communication air waves in the vicinity of the proposed wind energy facility. n. A description of noise levels anticipated to be generated by the wind energy facility. o. A statement from the city electric utility that the proposed wind energy facility is compatible with the local energy grid system and that the proposal is acceptable to the local electric power utility. A description of electrical generation and use of "excess" power must be provided. Any proposed wind energy facility to be installed with the intent to distribute electricity directly to Cedar Falls Utilities (CFU) or any other electrical distributor or to a facility with electric service from CFU must meet CFU safety and interconnection requirements and receive pre-approval from CFU or any other local electrical utility. p. For large and small wind energy facilities, including roof-mounted facilities, photo exhibits illustrating the proposed wind energy facilities and/or tower structures shall be provided to illustrate the finished product. q. Each application shall contain an indemnification provision which meets the requirements of subsection (f)(2)i of this section. (6) Submittal of a plan for site grading, erosion control, stormwater drainage, and stormwater pollution prevention plan (SWPPP) shall be submitted to the city engineer for review and approval prior to granting building permits. (7) All other permits, including building permits and permits for work done in public rights-of-way, shall be applied for by the applicant to the appropriate agency prior to construction. (8) Wind energy facilities shall not include offices, vehicle storage, or other outdoor storage unless permitted by the special exception permit. Accessory storage building may be permitted for large wind energy facilities at the discretion of the planning and zoning commission and the city council. The size and location of any proposed accessory building shall be shown on the site plan. No other structure or buildings accessory to the wind energy facility are permitted unless used for the express purpose of the generation of electricity or performing other work related to the wind energy facility. (9) No grading, filling, or construction shall begin until a building permit is issued. A separate building permit shall be required for each individual wind energy facility including tower structures and appurtenant facilities prior to construction of each wind turbine tower and appurtenant facilities to be constructed. (10) A wind energy facility authorized by special exception permit shall be started within 12 months of special permit issuance and completed within 36 months of special permit issuance, or in accordance with a timeline approved by the planning and zoning commission and city council. (11) For large wind energy facilities, the applicant shall submit a copy of all "as built plans" prepared by a professional engineer licensed in the state including structural engineering and electrical plans for all facilities following construction to the city to use for removal of large wind energy facilities, if the large wind energy facility owner fails to meet the requirements of this section or the special permit. (12) The planning and zoning commission and city council may require additional conditions as deemed necessary upon the proposed wind energy facility or tower structure to ensure public health, safety, and welfare. (13) Wind energy facilities that are constructed and installed in accordance with the provisions of this section shall not be deemed to constitute the expansion of a nonconforming use or structure. (14) Nothing in this section shall be deemed to give any applicant the right to cut down surrounding trees and vegetation on any property not on the applicant's site for the purpose of reducing wind flow turbulence or increasing wind flow to the wind energy facility. Nothing in this section shall be deemed a guarantee against any future construction or city approvals of future construction that may in any way impact the wind flow to any wind energy facility. (f) General requirements. (1) Standards. a. No television, radio or other communication antennas may be affixed or otherwise made part of a wind energy facility, except pursuant to the regulations for wireless communication towers. Applications may be jointly submitted for wind energy facilities and wireless communication facilities. b. Wind energy facilities shall utilize measures to reduce the visual impact of the facility to the extent practicable. Facilities with multiple tower structures shall be constructed with an appearance that is similar throughout the site, to provide reasonable uniformity in overall size, geometry, and rotational speeds. No signage, lettering, company insignia, advertising, or graphics shall be established on any part of the wind energy facility including tower structure, blades or any other component of the system. c. For small wind energy facilities constructed as an accessory use to a residential use, only one small wind energy tower per site shall be allowed. In addition to a single tower structure, more than one roof-mounted wind mechanism may be installed provided the height of the roof-mounted facility is no more than 15 feet above the height of the residential structure. d. For larger multi-unit or "mixed use" residential/commercial complexes, more than one small wind energy facility may be permitted to serve the needs of the on-site complex subject to review and approval by the commission and city council. e. Small wind energy facilities shall be used primarily to reduce the on-site consumption of electricity by the principal use located thereon. f. At least one warning or notice sign shall be posted on the wind energy facility or tower structure at a height of no more than five feet above natural grade warning of electrical shock or high voltage, harm from revolving machinery, and the hazard of falling ice. The name, address and contact information for the primary operator of the wind energy facility must be posted in a location clearly visible from adjacent property, said sign to be no more than six square feet in area and located no higher than five feet above natural grade. This contact information may be waived in the case of small residential wind energy systems clearly serving an existing residential structure. g. Wind energy facilities including tower structures exceeding 60 feet in height and located on commercial or industrial properties shall be constructed to provide one of the following means of access control: 1. Tower-climbing apparatus mounted on the tower located no closer than 12 feet from the ground. 2. A locked anti-climb device installed on the tower structure. 3. A locked, protective fence at least six feet in height that encloses the tower structure. h. Monopole tower construction is recommended for wind energy facility tower structures exceeding 60 feet in height. Lattice-designed towers are to be discouraged, but may be permitted upon site plan review and approval of safety considerations by the planning and zoning commission and city council. Guy wires or other external stabilizing components shall be discouraged in all cases. However, for small wind energy facilities serving residential properties, limited guy wire support systems may be allowed subject to review and approval by the commission and city council. (2) Design and installation. a. Wind energy facilities shall be painted a nonreflective, non-obtrusive color, such as grey, white, or off-white. b. At large wind energy facility sites, the design of any allowed accessory buildings and related building structures shall, to the extent possible, use materials, colors, textures, screening, and landscaping that will blend the large wind energy facility to the natural setting and existing environment. c. Minimum lighting necessary for safety and security purposes shall be permitted. Techniques shall be implemented to prevent casting glare from the site, except as otherwise required by the FAA or other applicable authority. d. No form of advertising including signs, banners, balloons or pennants shall be allowed on the wind energy facility including tower structure, wind turbine, blades, or other buildings or facilities associated with the facility, except for reasonable identification of the manufacturer or contact information of the operator of the wind energy facility as noted in subsection (f)(1)f of this section. e. All wind energy facilities shall be equipped with a redundant braking system for the rotating mechanism. This includes both aerodynamic over-speed controls (including variable pitch, tip, and other similar systems) and mechanical brakes. Mechanical brakes shall be operated in a failsafe mode. Stall regulation shall not be considered a sufficient braking system for over-speed protection. f. All wind energy facilities shall comply with all applicable city building codes and standards. g. Electrical controls, control wiring, and power lines shall utilize wireless or underground service connections except where wiring is brought together for connection to the transmission or distribution network, adjacent to that network. This provision may be waived by the commission and city council for any wind energy facility approved by special permit if deemed appropriate. h. All electrical components of the wind energy facility shall conform to relevant and applicable local, state, and national electrical codes, and relevant and applicable international standards. i. The owner of a wind energy facility shall defend, indemnify, and hold harmless the city and its officials from and against any and all claims, demands, losses, suits, causes of action, damages, injuries, costs, expenses, and liabilities whatsoever including attorney fees arising out of the acts or omissions of the operator or the operator's contractors concerning the construction or operation of the wind energy facility without limitation, whether said liability is premised on contract or tort. Owner's submittal for a building permit for a wind energy facility shall constitute agreement to defend, indemnify, and hold harmless the city and its officials. j. The owner of a large wind energy facility shall reimburse the city and/or the county for any and all repairs and reconstruction to the public roads, culverts, and natural drainageways resulting directly from the construction of the large wind energy facility. k. Where wind energy facility construction cuts through a private or public drain tile field, the drain tile must be repaired and reconnected to properly drain the site to the satisfaction of the city engineer. l. Any recorded access easement across private lands to a wind energy facility shall in addition to naming the wind energy facility owner as having access to the easement shall also name the city as having access to the easement for purposes of inspection or decommissioning. If no such access easement exists, approval of the special exception permit for a wind energy facility shall constitute granting to the city a right to access the wind energy facility for purposes of inspection or decommissioning. m. Any wind energy facility that does not produce energy for a continuous period of 12 months shall be considered abandoned and shall be removed in accordance with the removal provisions of this section. Failure to abide by and faithfully comply with this section or with any and all conditions that may be attached to the granting of any building permit for a wind energy facility shall constitute grounds for the revocation of the permit by the city. n. A large wind energy facility owner and operator shall maintain a telephone number and identify a responsible person for the public to contact with inquiries and complaints throughout the life of the project, and shall provide updated information on such to the city planning division. (g) Setbacks. The following setbacks and separation requirements shall apply to all wind energy facilities: (1) Each wind turbine associated with a large wind energy facility shall be set back from the nearest nonparticipating landowner's property line and from any other wind turbine a distance of no less than 1.5 times its total height. (2) Each wind turbine associated with a small wind energy facility shall be set back from the nearest property line a distance of no less than 1.0 times its total height, except that a wind turbine associated with a small wind energy facility may be located closer than 1.0 times its total height if approved provided it is demonstrated that such a setback will not have an adverse impact on the adjoining properties. The planning and zoning commission and city council may grant a waiver to the setback requirements where strict enforcement would not serve the public interest and where it is demonstrated that such a setback will not have an adverse impact on the adjoining properties, however the setback shall generally not be less than 0.5 times the total height of the tower structure or any support element of the structure including poles and guy wires. (3) Wind energy facilities must satisfy all utility setbacks and/or easement separations. The owner of the wind energy facility is responsible for contacting the appropriate utility entities to determine the location of all aboveground and underground utility lines on the site including, but not limited to, electricity, natural gas, cable television, communication, fiber optic/communications, etc. (h) Noise and vibration. (1) Except during short-term events including severe windstorms, audible noise due to wind energy facility operations shall not exceed maximum allowable noise decibel levels, when measured at the site property lines. If audible noise exceeds maximum allowable decibel levels as specified in the applicable provisions of this Code relating to nuisance and/or noise the offending wind turbine must be inoperable until repairs are completed. (2) Wind energy facilities shall not create an audible steady, pure tone such as a whine, screech, hum, or vibration. (i) Minimum ground clearance. (1) For small wind energy facilities, the minimum distance between the ground and any part of the rotor or blade system shall be 15 feet. (2) For large wind energy facilities, the minimum distance between the ground and any part of the rotor or blade system shall be 30 feet. (j) Signal interference. The wind energy facility owner shall mitigate any interference with electromagnetic communications, such as radio, telephone, computers, communication devices, or television signals, including any public agency radio systems, caused by any wind energy facility. However, in no case shall a wind energy facility be located within the microwave path of an emergency communication tower. (k) Shadow flicker. The wind energy facility owner shall attempt to avoid shadow flicker from the facility affecting any off site residences. The wind energy facility owner and/or operator shall make reasonable efforts to minimize or mitigate shadow flicker to any off site residence to the reasonable determination of the city planner. (l) Ice shedding. The wind energy facility owner and/or operator shall ensure that ice from the wind turbine blades does not impact any off site property. (m) Waste management. All hazardous waste generated by the operation and maintenance of the facility, including, but not limited to lubricating materials, shall be handled in a manner consistent with all local, state, and federal rules and regulations. (n) Removal. (1) Wind energy facility or tower removal. The tower owner and/or operator shall notify the city inspection services division when a tower is removed, no longer in use, or is knocked down, or blown down, or damaged to such an extent that major structural repairs are required. If a tower is removed, knocked down, blown down, or damaged to such an extent that major structural repairs are required, said tower shall not be reconstructed or replaced without prior review and approval by the planning and zoning commission and city council. If said damaged wind energy facility or tower is abandoned or inoperable with no intention by the owner to replace said facility, the facility or tower shall be removed in a timely fashion at the expense of the facility or tower owner or the property owner where the facility is located, as directed by the city planner. Any wind energy facility or tower that is not operated for a continuous period of 12 months shall be considered abandoned, and the owner of such wind energy facility or tower shall remove the same within 90 days of receipt of notice from the city notifying both the wind facility owner and the owner of the property on which the wind facility or tower is located, of such abandonment. Failure of the owner or property owner to remove an abandoned wind energy facility or tower within said 90 days shall be grounds for the city to require removal of the facility or tower at the expense of the facility owner or property owner. If there are two or more users of a single facility, then this provision shall not become effective until all users cease using the wind energy facility. If the city is required to remove a facility at the expense of the owner or property owner, the costs of removal, if not paid by the wind energy facility owner, or by the owner of the property on which the tower is located, within 30 days of the city's written demand for payment, shall be reported to the city clerk, who shall levy the cost thereof as an assessment, which shall be a lien on the real estate on which the wind energy facility or tower is located. The city clerk shall certify such assessments to the county auditor to be paid by the owner of the property on which the facility is located, in installments in the same manner as property taxes, as provided by law. (2) The wind energy facility site shall be stabilized, graded, and cleared of any debris by the owner of the facility or its assigns. If the site is not to be used for agricultural practices following removal, the site shall be seeded to prevent soil erosion. (3) Any foundation of the wind energy facility shall be removed to a minimum depth of four feet below grade, or to the level of the bedrock if less than four feet below grade, by the owner of the facility or its assigns. Following removal, the location of any remaining wind energy facility foundation shall be identified on a map as such and recorded with the deed to the property with the office of the county recorder. (4) Any access roads to the wind energy facility shall be removed, cleared, and graded by the owner of the facility, unless the property owner wants to keep the access road. The city will not be assumed to take ownership of any access road unless through official action of the city council. (5) Any expenses related to the decommissioning and removal of a wind energy facility shall be the responsibility of the wind energy facility owner, including any expenses related to releasing any easements. (6) Removal of the wind energy facility shall conform to the contract between the property owner and the owner/operator of a wind energy facility, in addition to the requirements set forth in this section. (o) Violation and permit revocation. (1) All wind energy facilities shall be maintained in operational condition at all times, subject to reasonable maintenance and repair outages. Operational condition includes meeting all noise requirements and other permit conditions. Should a wind energy facility become inoperable, or should any part of the wind energy facility be damaged, or should a wind energy facility violate a permit condition, the owner/operator shall remedy the situation within three months after written notice from the city. (2) Notwithstanding any other abatement provision, if the wind energy facility is not repaired or made operational or brought into compliance after said notice, the city council may, after a public meeting at which the operator or owner shall be given opportunity to be heard and present evidence, including a plan to come into compliance: a. Order either remedial action within a specified timeframe; or b. Order revocation of the permit and require removal of the wind energy facility within three months. (3) Any wind energy facility that does not meet the requirements of this section, including, but not limited to, those dealing with noise, height, setback, or visual appearance, or does not meet any conditions attached to approval of the wind energy facility shall be deemed an unlawful structure and shall provide grounds for the revocation of the permit.
(Ord. No. 2922, § 1(29-127), 5-7-2018)
Ask a question about Cedar Falls law
Corpus searches the Cedar Falls sections it holds and shows the ones that match, with their citations. Free, no sign-in.