Sec. 26-94. - Stormwater detention.

(a) Required; request for review. In all zoning districts, in connection with every industrial, commercial, business, trade, institutional, recreational or dwelling use, and similar uses, stormwater detention shall be provided and shall be subject to the review and approval of the city engineer. A request for stormwater detention review shall be accompanied by two copies of plans showing all existing landscaping, surface treatments, structures, measurements and elevations and two copies of plans showing proposed improvements, surface types, measurements, elevations, stormwater detention calculations and method of detention. In all zoning districts, all uses shall provide stormwater detention in accordance with the criteria in this section. (b) Exceptions. Stormwater detention will not be required for: (1) Individual single-unit dwelling units, duplexes, bi-attached dwelling units or similar uses or lots with low runoff coefficients. (2) All uses on undeveloped lots of record as of September 26, 1983, where the difference between the runoff of a ten-year frequency rainfall, as applied to the entire lot, including the proposed improvements, is less than or equal to one cubic foot per second when compared to the amount of total stormwater runoff generated from a two-year frequency rainfall on the lot as it existed in its natural, undeveloped state. However, following initial development, should any deed transfer, lot split, resubdivision or addition reduce the computed lot area or increase the amount of impervious surface, increasing the runoff by an amount greater than one cubic foot per second, then stormwater detention shall be provided for the entire lot in conformance to the criteria in subsection (c) of this section. (3) Additions to existing structures or new structures on developed lots of record as of September 26, 1983, where the total stormwater runoff generated from a ten-year frequency rainfall, applied to the entire area of the addition or new structure, including the proposed improvements and required parking addition, is less than or equal to one cubic foot per second when compared to the amount of total stormwater runoff generated from a two-year frequency rainfall on the affected area in its existing state. However, following completion of the proposed addition or new structure without stormwater detention, should any deed transfer, lot split, resubdivision, new addition or structures be added to the lot which reduce the computed lot area or increase the amount of impervious surface such that the sum of the improvements generate a runoff greater than one cubic foot per second, then stormwater detention shall be provided for all additions or new structures added after September 26, 1983, in conformance to the criteria in subsection (c) of this section. (4) Reconstruction, repair or replacement of uses on developed lots in conformance with all other applicable sections of this chapter and this Code, provided that such reconstruction, repair or replacement may not increase the total stormwater runoff generated by the lot as it existed prior to reconstruction. Should the reconstruction, repair or replacement generate runoff greater than that discharged prior to construction, the lot shall conform to the criteria in subsection (b)(3) of this section. (5) Individual lots recorded after September 26, 1983, if the plat in which the lots are located provides stormwater detention for all lots, on site or off site, equal to the difference between the total stormwater runoff generated from a ten-year frequency rainfall applied to the entire plat, including proposed improvements, public and private, and a two-year frequency rainfall applied to the site as it existed in its natural undeveloped state. (6) Any lot where a governmental body or private drainage district has provided overall drainage basin detention facilities and the city has waived by resolution the detention criteria for individual lots in that basin. (c) Detention requirements for nonexempt lots. All lots not exempted by subsection (b) of this section shall detain all on site stormwater runoff equal to the difference between the total stormwater runoff generated from a ten-year frequency rainfall as applied to the entire lot, including the proposed improvements, and a two-year frequency rainfall applied to the lot as it existed in its natural undeveloped state. (d) Special detention requirements. The city council, upon recommendation of the planning and zoning commission or at its own discretion, may prescribe that a higher degree of stormwater detention be required if it is in the best interest of the general public. The special detention requirement will normally be reserved for developments with large quantities of impervious surfaces, where the drainage basin in which the development is located is experiencing flooding problems, or where receiving stormwater facilities cannot accept the normal two-year storm discharge. (e) Waivers. Stormwater detention requirements may be waived by the city council following receipt of sufficient written justification from the property owner indicating that it is not physically or economically feasible to detain stormwater and that such discharge will not be injurious to downstream properties in the drainage basin. (f) Evaluation of drainage system. All developments and subdivisions which are required by this section to provide stormwater detention or installation of a public storm sewer system shall provide an evaluation of the 100-year storm overflow from the development's primary drainage system. The evaluation will be reviewed by the city to ensure unobstructed overflow areas are provided for a 100-year storm as a protection to new construction in the development and downstream properties. (g) Determination of specific requirements. The charts following this section shall be used to determine if stormwater detention is required. (h) Inspection and approval. All required stormwater detention shall be in place, inspected and approved by the city engineer or his staff designees prior to issuance of an occupancy permit. However, installation prior to occupancy may be waived in accordance with section 26-220(g)(6). TABLE B-1. RAINFALL INTENSITIES, WATERLOO, IOWA (Compiled from U.S. Weather Bureau Technical Paper #40) Rainfall Intensities are in Inches per Hour (24 hours) | 1440 | 0.11 | 0.13 | 0.16 | 0.19 | 0.22 | 0.24 | 0.27 (12 hours) | 720 | 0.19 | 0.23 | 0.29 | 0.33 | 0.38 | 0.42 | 0.47 (6 hours) | 360 | 0.32 | 0.38 | 0.48 | 0.57 | 0.65 | 0.73 | 0.80 (3 hours) | 180 | 0.55 | 0.67 | 0.85 | 0.93 | 1.10 | 1.23 | 1.35 (2 hours) | 120 | 0.76 | 0.90 | 1.15 | 1.31 | 1.55 | 1.70 | 1.85 Storm Duration (Minutes) | 90 | 1.03 | 1.23 | 1.53 | 1.76 | 2.00 | 2.20 | 2.50 60 | 1.29 | 1.54 | 1.95 | 2.22 | 2.55 | 2.82 | 3.15 50 | 1.44 | 1.72 | 2.14 | 2.46 | 2.80 | 3.08 | 3.50 40 | 1.65 | 1.97 | 2.45 | 2.82 | 3.20 | 3.52 | 4.00 30 | 2.06 | 2.46 | 3.06 | 3.52 | 4.00 | 4.40 | 5.00 20 | 2.57 | 3.07 | 3.82 | 4.40 | 5.00 | 5.50 | 6.25 15 | 2.97 | 3.54 | 4.41 | 5.07 | 5.76 | 6.34 | 7.20 10 | 3.52 | 4.21 | 5.23 | 6.02 | 6.84 | 7.52 | 8.55 5 | 4.57 | 5.46 | 6.79 | 7.81 | 8.88 | 9.77 | 11.10 0 | _______ 1-year | 2-year | 5-year | 10-year | 25-year | 50-year | 100-year Storm Frequency (Years) TIME OF CONCENTRATION (Overland Flow) Example: Bare, rocky soil on 1.5% slope. Find time of concentration for overall length of 1,000 feet. | Procedure: Connect overland condition (1) With slope (2), Where line crosses the pivot line (3), Extend a line from the length (4), Through the pivot line (3), To the time of concentration (5). RUNOFF COEFFICIENTS FOR VARIOUS AREAS Type of Drainage Area | Runoff Coefficient, C Residential: Single-unit areas | 0.30—0.50 Multi-units, detached | 0.40—0.60 Multi-units, attached | 0.60—0.75 Apartment dwelling areas | 0.50—0.70 Suburban | 0.25—0.40 Business: Downtown areas | 0.70—0.95 Neighborhood areas | 0.50—0.70 Industrial: Light areas | 0.50—0.80 Heavy areas | 0.60—0.90 Parks, cemeteries | 0.10—0.25 Playgrounds | 0.20—0.35 Railroad yard areas | 0.20—0.40 Unimproved areas | 0.10—0.30 Streets: Asphalt | 0.70—0.95 Concrete | 0.80—0.95 Brick | 0.70—0.85 Gravel | 0.45—0.60 Drives and walks | 0.75—0.85 Roofs | 0.75—0.95 Lawns: Sandy soil, flat (0—2% slope) | 0.05—0.10 Sandy soil, average (2—7% slope) | 0.10—0.15 Sandy soil, steep (7% or greater slope) | 0.15—0.20 Heavy soil, flat (0—2% slope) | 0.13—0.17 Heavy soil, average (2—7% slope) | 0.18—0.22 Heavy soil, steep (7% or greater slope) | 0.25—0.35 RUNOFF COEFFICIENTS FOR RURAL AREAS Topography and Vegetation | Open Sandy Loam | Clay and Silt Loam | Tight Clay Woodland: Flat (0—5% slope) | 0.10 | 0.30 | 0.40 Rolling (5—10% slope) | 0.25 | 0.35 | 0.50 Hilly (10—30% slope) | 0.30 | 0.50 | 0.60 Pasture: Flat | 0.10 | 0.30 | 0.40 Rolling | 0.16 | 0.36 | 0.55 Hilly | 0.22 | 0.42 | 0.60 Cultivated: Flat | 0.30 | 0.50 | 0.60 Rolling | 0.40 | 0.60 | 0.70 Hilly | 0.52 | 0.72 | 0.82

(Ord. No. 2922, § 1(29-87), 5-7-2018)