§ 31.06 — Improvements
Cedar Rapids, Iowa, Municipal Code (Supp. No. 25, Update 1: codified through Ordinance No. 025-26, passed July 28, 2026) · Cedar Rapids Municipal Code § 31.06
Corpus is an independent public-information project, not the official City of Cedar Rapids website. Stable reference: corpuslaw.us/code/a3896a1c-e71f-4471-b64a-3e842659116a
31.06 - Improvements.
Improvements required. The Applicant shall, at the Applicant's expense, construct the Improvements required by this Chapter. The required improvements shall be designed in accordance with the requirements set forth in the Design Standards. Prior to commencing construction, plans and specifications shall be approved by Development Services Division and a pre-construction meeting held. The proposed improvements shall be constructed in accordance with the approved plans and specifications The Applicant shall provide easements on the Final Plat for public utilities, private utilities and overland drainage. Easements shall be designed and sized by a Civil Engineer to meet their intended purposes, such as conveying storm water and the occupation and maintenance of underground utilities. Easements shall be sized and located appropriately, so as not to create an undue encumbrance. The Applicant shall provide on the Final Plat that drainage easements located within residential lots shall be maintained by the lot owner. Minimum floor, window and door elevations shall be provided for lots adjacent to storm water management facilities or overland drainage easements, for lots located within Special Flood Hazard Areas, and other potential flooding hazards. The Applicant shall identify on the improvement plans and Final Plat, all such hazards and setting minimum elevations to reduce the risk of flood damage. Outlots platted for public detention basins shall be directly accessible to the street right-of-way. Maintenance access through private property is prohibited. Final Plat shall provide public access easements for inspection of all privately owned storm water management improvements. Review and approval procedure. The Applicant shall submit plans for all Improvements to the Development Services Division in accordance with the requirements set forth in the Design Standards. The Development Services Division shall review the submittal for compliance with the Design Standards. This review is not for quality control and assurance, nor guarantees that improvement plans are free of errors and omissions. Following the review, comments shall be returned to the Applicant. Following notification from the Development Services Division, the Applicant shall provide an Approval Submittal. The Development Services Division shall approve the documents if all comments have been satisfactorily addressed. Mandatory pre-construction meeting. Prior to starting any construction activities on projects which contain public improvements that require acceptance by the City Council, the Applicant shall contact Public Works to schedule and attend a Pre-Construction meeting through the Public Works Department. The agenda for the Pre-Construction meeting shall at a minimum cover the following topics: Contact information for the General Contractor and any Sub-contractors working on public improvements associated with the Development; Verification that the Applicant has provided the Contractor with City approved construction documents for the Development; Verification of which improvements are to be accepted as public improvements and required inspections; and Verification of all necessary permits have been issued for the development including permits for work in the public right-of-way. Construction observation. The construction of Improvements may be observed by City Staff to verify compliance with the approved plans, technical specifications and details. In addition, materials testing may be performed by the City. The cost of such observation and testing shall be the responsibility of the Applicant. The cost shall be the actual cost of the observation and testing to the City up to a maximum of 5% of the construction costs of the improvements. Construction costs will be determined with bids received by the Applicant or a Civil Engineer's cost opinion and reviewed by Development Services Division. The Applicant shall be invoiced for these costs monthly on a time and materials basis. All invoiced observation and material testing costs shall be due to the City prior to acceptance of the Improvements by the City Council. If construction occurs prior to the Development Services Division approval of the construction documents, the Applicant shall be responsible for those costs to review the construction which has occurred on private and public property, and to correct any items which do not comply with the approved Improvements plans. Completion of improvements. Prior to City Council consideration of the Final Plat, all Improvements shall be constructed by the Applicant and approved by the Public Works Department, or a suitable surety acceptable to the Public Works Department shall be provided by the Applicant in accordance with Section 31.06(f). Performance surety permitted. In lieu of the requirement that the Improvements shall be completed prior to the approval of the Final Plat, the Applicant and the City may enter into an agreement on terms acceptable to the City, for the City to complete the Improvements intended to be publicly owned and maintained. The agreement shall include, at a minimum, the following terms and conditions: The Improvements shall be constructed in accordance with the approved Improvements plans. The Improvements shall be completed within two (2) years of the date of City Council approval of the agreement. The number of building permits and certificates of occupancy to be issued prior to the completion of the Improvements shall be limited as specified in the agreement. A surety, in one or more of the following financial instruments shall be provided in a form acceptable to the City Council. The amount of the surety shall be one-hundred and twenty percent (120%) of the opinion of probable construction cost as approved by the Development Services Division, in the form of: Irrevocable letter of credit. Surety bond. Escrow account. Maintenance surety required. Prior to receiving Final Plat approval, the contractor responsible for installing the publicly owned and maintained improvements shall provide a maintenance bond to the City in the amount of one hundred percent (100%) of the contract for the publicly owned and maintained improvements. Four-year bonds are required for Streets, Alleys, sanitary sewer, storm sewer, subdrain, and water mains. City Council approval of maintenance bonds shall occur concurrently when all publicly owned and maintained Improvements are constructed and approved by the Public Works Department. Sidewalks. Sidewalks shall be constructed along the public street frontage(s) of a lot prior to final certificate of occupancy issuance for a structure on the lot. The sidewalks shall be designed in accordance with the Design Standards and constructed in accordance with the Improvements plans approved by the Development Services Division. The cost of the construction shall be the responsibility of the Applicant. In addition: Sidewalk construction shall not be deferred unless allowed by the City's current sidewalk installation policy as determined by Development Services Division. In the case of a deferral, the Applicant shall include a completed Assessment Agreement in the Final Plat bound documents. If the sidewalks within the area final platted are not constructed within five years of the Final Plat recordation or if 75 percent of lots are built, whichever comes first, the City Engineer may include the construction of the remaining sidewalks in a public contract, prior to construction of a structure(s) on the platted lot(s). The cost of the construction shall be assessed to the adjoining property owner(s). Sidewalk plans shall include all length dimensions, elevations and slopes necessary to design, construct, inspect and accept sidewalks and sidewalk ramps according to the Design Standards. Sidewalk ramps shall be constructed and accepted at the same time as the subdivision streets. Lots located at the corner of two intersecting streets shall provide pedestrian ramps to both streets in that corner of the intersection. An existing unpaved or planned public transit stop within the area final platted may require a concrete boarding and alighting area constructed according to the City's current bus stop requirements. Street signage. The Applicant shall be responsible for the preparation of a street signage plan. The street signage plan shall be reviewed and approved by the City Traffic Engineering Division as a part of the final plat review process. The costs associated with the preparation of the plan and the design, fabrication and installation of the signage shall be the responsibility of the Applicant. All street signage shall be designed per current Design Standards and the Manual on Uniform Traffic Control Devices. For signs to be installed on public property, full payment shall be provided to the City by the Applicant prior to Final Plat approval, or an appropriate Performance Surety as set forth in Section 31.06(f) shall be provided. For signs to be installed on private property, verification by the City of acceptable sign installation shall occur prior to issuance of any Final Certificate of Occupancy for the site. Street lighting. New street lighting shall be installed in rights-of-way within the overall boundary of the final plat. The Applicant shall be responsible for the preparation of a street lighting plan. The costs associated with the preparation of the plan and the design, fabrication and installation of the streetlights shall be the responsibility of the Applicant. All streetlights shall be designed for acceptable illuminance per current Design Standards. The street lighting plan shall be reviewed and approved by the utility company servicing the facilities and the City Traffic Engineering Division. Proof of payment of the costs associated with the construction of the street lighting facilities and appurtenances shall be provided prior to Final Plat approval, or an appropriate Performance Surety, as set forth in Section 31.06(f), shall be provided. City participation in public improvements. The City may require the Applicant to design and construct public Improvements with the ability to accommodate future growth and development. In this case, the City may pay the incremental difference above and beyond those requirements for Improvements to provide service to the Subdivision as determined appropriate by the Development Services Division. The City may only participate in the cost of public Improvements constructed by the Applicant for the following: For width of a concrete shared use path in excess of sidewalk widths required by the Design Standards. For the incremental pipe material costs of water and sanitary sewer mains, oversized to serve adjoining lands. For other public Improvements requested by the City, in excess of the public utilities, mobility and street connectivity required for the subdivision as determined by Chapter 32, Design Standards or studies prepared for the subdivision. Applicant shall submit a written request for cost participation on a form provided by the City and a construction cost opinion. City's receipt of a request does not guarantee participation and shall depend on available funding sources and timeline to reimburse the Applicant. City's participation amount shall not exceed the current competitive bid threshold established by Iowa Code. Acceptance. Acceptance of completed public improvements by resolution of the City Council shall occur upon recommendation by the City Engineer following receipt of maintenance bonds, satisfactory inspection of improvements, and dedication of public right-of-way and/or easements to the City. Ownership of the public improvements shall be transferred to the City upon acceptance. (004-23)
Ask a question about Cedar Rapids law
Corpus searches the Cedar Rapids sections it holds and shows the ones that match, with their citations. Free, no sign-in.
