§ 9.16 — Underground Connections Before Paving
Cedar Rapids, Iowa, Municipal Code (Supp. No. 25, Update 1: codified through Ordinance No. 025-26, passed July 28, 2026) · Cedar Rapids Municipal Code § 9.16
Corpus is an independent public-information project, not the official City of Cedar Rapids website. Stable reference: corpuslaw.us/code/e77d1250-859e-45fa-835c-c759cb787d5f
9.16 - Underground Connections Before Paving.
Owners' Duty to Make Connection. When any street or alley is ordered paved or otherwise permanently improved, it shall be the duty of all owners of property abutting upon such street or alley, upon written notice from the City, to at once make permanent and substantial connections with gas, water, sewer, steam heating mains, underground electric conduits, and any other underground public utilities along such street or alley at their own cost and expense. The City shall order such connections made as are necessary, stating generally the location of the street, and the kind and character of connections to be made with the kind of materials to be used, and when the work of making such connections shall be completed. Material. The connections made with the water mains in any street or alley from the mains to and inside of the curb along the street in front of the abutting property shall be made of pipe, and shall be in accordance with the City's design standards and construction specifications. Method. All the connections shall be made in a thorough and substantial manner under the direction and order of the Public Works Department, and in the manner provided by plans or resolution for making connections therewith, so that whenever any such paving is once laid it need not be disturbed for the making of any such connection. Notice to Connect. If any property owner or holder fails to make such connections within 10 days after the passage of an order by the Council for the paving of any such street or alley, the Council shall order the same and cause the Public Works Department to prepare notices to such delinquent property owners to make such connections within 10 days thereafter. The Public Works Department may publish notice in a newspaper in the city stating the particular lot or lots or parcel of ground in front of which connections shall be made, which publication shall take the place of personal service. The publication shall be made as required by law. Bids for Work. The City shall also advertise for bids for making the connections the property owners fail to make, giving at least 10 days' notice by two (2) publications in a daily newspaper. Connections Made by City. If any owner of abutting property fails to comply with the provisions of this section by the time stated in the notice, the City may proceed at once to have such connections made. Assessment. The cost and expense of putting in connections by the City in lieu of property owners as provided herein shall be levied as a special tax against the property abutting or adjacent thereto and the method of estimating, assessing, levying, and collecting the tax shall be the same as that prescribed for general taxes. Excavations After Pavement Laid. Whenever any street or alley has been ordered paved, and property owners owning property abutting or lying along such street or alley, have been notified by the City or a public utility company to connect their property with water, steam, or gas mains by laying down pipes to within the curb line in front of or along the property, any person so notified who has refused to comply with the requirements of the notice shall not enter upon such street or alley after it has been paved and make any excavation in the paved table { mso-displayed-decimal-separator: "\."; mso-displayed-thousand-separator: "\,"; } tr { mso-height-source: auto; } col { mso-width-source: auto; } td { padding-top: 1px; padding-right: 1px; padding-left: 1px; mso-ignore: padding; color: black; font-size: 10.0pt; font-weight: 400; font-style: normal; text-decoration: none; font-family: Arial; mso-generic-font-family: auto; mso-font-charset: 0; text-align: general; vertical-align: bottom; border: none; white-space: nowrap; mso-rotate: 0; } .xl166 { font-size: 11.0pt; font-family: "Aptos Narrow", sans-serif; mso-font-charset: 0; text-align: center; border: .5pt solid black; }16256 portion thereof for the purpose of connecting their property with such mains within ten years after such paving is laid and not thereafter except by special resolution of the Council. (062-25)
Ask a question about Cedar Rapids law
Corpus searches the Cedar Rapids sections it holds and shows the ones that match, with their citations. Free, no sign-in.