§ 42-151 — Minimum standards
Municipal Code of the City of Des Moines, Iowa (Supp. No. 38, Update 3: codified through Ordinance No. 16,577, adopted August 24, 2026) · Des Moines Municipal Code § 42-151
Corpus is an independent public-information project, not the official City of Des Moines website. Stable reference: corpuslaw.us/code/a13a1038-0ee3-4eb9-b614-452a810121a4
Sec. 42-151. - Minimum standards.
(a) All grading plans and specifications, including extensions of previously approved plans, shall include provisions for erosion and sediment control in accordance with but not limited to the standards contained in the Iowa Guidelines for Soil and Water Conservation in Urban Areas published by the state department of soil conservation. Copies of such standards shall be available for inspection in the office of the city engineer. (b) Sediment caused by accelerated soil erosion shall be removed from runoff water before it leaves the site of the earth change. (c) Any temporary or permanent facility designed and constructed for the conveyance of water around, within, through or from the earth change area shall be designed to limit the water flow to a nonerosive velocity, as set forth in the design standards for public improvements adopted by the city engineer. (d) Temporary soil erosion control facilities shall be removed and earth change areas graded and stabilized with permanent soil erosion control measures, all pursuant to the approved time schedule and to approved standards and specifications as prescribed by the Polk Soil Conservation District and the Soil Conservation Service of the U.S. Department of Agriculture. (e) Unless the approved plan designates temporary construction erosion control measures prior to any initial grading, permanent soil erosion control measures for all slopes, channels, ditches, or any disturbed land area shall be completed within 15 workable days after final grading or the final earth change has been completed. (f) Fill sites shall be leveled and compacted at maximum intervals of 30 days. Interim slopes, cut or fill, shall not exceed a slope of three feet horizontal to one foot vertical without engineering justification for a steeper slope. (g) All grading plans and specifications, including extensions of previously approved plans, shall comply with the requirements of the tree removal and mitigation ordinance codified in article X of chapter 42 of this Code.
(C75, § 2-205.39; O.9384; C79, C91, § 2-205.39; O.11,709, 14,890)
Ask a question about Des Moines law
Corpus searches the Des Moines sections it holds and shows the ones that match, with their citations. Free, no sign-in.
