§ 42-309 — Enforcement
Municipal Code of the City of Des Moines, Iowa (Supp. No. 38, Update 3: codified through Ordinance No. 16,577, adopted August 24, 2026) · Des Moines Municipal Code § 42-309
Corpus is an independent public-information project, not the official City of Des Moines website. Stable reference: corpuslaw.us/code/20549e68-9ab8-4341-a4f4-42535bd170e6
Sec. 42-309. - Enforcement.
(a) The odor pollution control program established by this article shall be implemented, administered, and enforced by the neighborhood inspection administrator of the community development department. (b) The sections of this article which prohibit the causing or continuing of odor pollution shall be enforced only upon the finding that a source is a significant odor generator as defined in section 42-301 of this article. Notification by the hotline operator as provided in section 42-303 of this article shall be sufficient to establish the fact of an odor alert condition regarding an odor nuisance. (c) In addition to further implement and enforce this article, the neighborhood inspection administrator may: (1) Conduct research, monitoring, and other studies related to odor pollution. (2) Review public and private projects, including those subject to mandatory review or approval by other departments, for compliance with this article, if these projects are likely to cause odor pollution in violation of this article. (3) At the time of application for a building permit for construction or expansion of an industry, facility or other source which has been determined to be a potential odor generator by the neighborhood inspection administrator, that industry, facility or source may be required to commence an evaluation and analysis of all its processes and potential odor emission points to determine their degree of potential odor generation. In addition to an evaluation of the odor emission points, a final report shall provide, in engineering detail, an odor control plan utilizing the best available control technology for the mitigation and ongoing control of odor from the emission points designated and determined as a result of their study or analysis. No building permit will be issued until such time as final report and control strategy has been submitted to, reviewed, and approved by the neighborhood inspection administrator. Upon receipt of a final report from an evaluation or analysis, the neighborhood inspection administrator shall: a. Review the document for adequacy and use of the best available odor control technology. b. If deemed necessary by the neighborhood inspection administrator, the report may be submitted to a private consultant for his or her review and recommendation to the neighborhood inspection administrator; the cost of the consultant's review will be borne by the subject industry, facility or source. c. The final report shall include such monitoring instrumentation and equipment as needed to ensure the maximum effective operation of best available control technology and compliance with this article. The final report also shall include procedures for recordkeeping of the following: 1. Operation and observation of the monitoring instrumentation and equipment. 2. Operation and maintenance of the technologies, processes, procedures or operating methods or alterations utilized in or by the best available control technology. d. The written confirmation and acceptance of the final report by the neighborhood inspection administrator shall constitute the control plan which may be modified at any time should actual operation of the industry show that the method used is insufficient or incorrect in controlling odor pollution. (4) Upon presentation of proper credentials, enter, inspect and test any property or place regarding which complaints have been filed or which has been designated as a significant odor generator or to otherwise enforce and implement this article and inspect any reports, records, or equipment deemed necessary at any time. An administrative search warrant may be obtained as provided in section 1-19 of this Code upon failure of the owner or his or her authorized representative to permit such inspection upon request. (d) Nonsignificant odor generator. For an industry or a source not designated as a significant odor generator, the following enforcement procedures shall apply: (1) Upon notification of an odor alert condition by the odor hotline operator, the neighborhood inspection administrator shall: a. Determine the location of the complaints which result in the establishment of the odor alert condition. b. Prepare a summary of the odor descriptions contained in the establishment of the odor alert condition. c. Determine the prevailing weather condition at the time of the alert indicating wind direction, temperature, wind velocity, humidity, and general weather conditions. d. Visit the general area from which the majority of complaints were generated in order to characterize the nature of the complaint. (2) Based on the parameters in subsection (d)(1) of this section, the neighborhood inspection administrator shall attempt to make a determination as to the industry or source of origin of the odor alert. (3) If the determination is made as to the origin of the odor, the neighborhood inspection administrator shall notify the owner, operator, or manager of the facility or other responsible party that the facility has been designated as the point source or origin of the odor alert. (4) Such notification shall contain the following: a. The date, times, and locations of the occurrence of the odor nuisances. b. The potential for the industry or source to be designated as a significant odor generator, and the potential for enforcement action. (e) Significant odor generators. For an industry or a source designated as a significant odor generator, as defined in section 42-301 of this article, the following enforcement procedures shall apply: (1) Upon notification of an odor alert condition by the odor hotline operator, the neighborhood inspection administrator shall: a. Determine the number series of the complaints which resulted in the establishment of the odor alert condition. b. Prepare a summary of the odor descriptions contained in the complaints, the average duration the odor was noticed and the time of day the first complaint of the alert was filed with the odor hotline. c. Determine the prevailing weather conditions at the time of the alert including wind direction, temperature, wind velocity, humidity, and general weather conditions. d. Visit the general area from which the majority of complaints were generated in order to characterize the nature of the complaint. (2) Based on the parameters in subsection (e)(1) of this section, the neighborhood inspection administrator shall attempt to make a determination as to the industry or source of origin of the odor alert. (3) If a determination is made as to the origin of the odor alert, the neighborhood inspection administrator shall notify the owner, operator, or manager of the facility or other responsible party that the facility has been designated as the point of origin of the odor alert and is in potential violation of this article. (4) The neighborhood inspection administrator shall inspect the facility's operating log books pertaining to odor control, the instrumentation monitoring the odor control and process equipment, any processes and equipment that may relate to odor generation and control, and any other equipment and processes that are determined necessary by the neighborhood inspection administrator. (5) The neighborhood inspection administrator shall make a determination as to whether the facility is in compliance with this article and as to whether the facility is operating within the parameters set forth in its odor abatement compliance plan. (6) If the neighborhood inspection administrator determines that a violation of this article exists or that an industry or facility is not operating within the parameters of its odor abatement compliance plan, he or she shall notify the facility's owner, operator, manager, or other responsible party. Negotiations shall then be entered into between the responsible party and the neighborhood inspection administrator regarding the necessary corrective action and the timeframe in which such action shall be taken, but in no way shall the industry source or facility be allowed to frustrate or delay enforcement action. If the facility fails to comply with the notice and the action agreed upon or if no agreement is reached, the neighborhood inspection administrator may commence legal action as prescribed in this article.
(C91, § 16-162; O.11,662, 11,859, 13,013, 15,903)
Ask a question about Des Moines law
Corpus searches the Des Moines sections it holds and shows the ones that match, with their citations. Free, no sign-in.
